Loading...
HomeMy WebLinkAboutP_Design_105087408_V1_180330CUSTOMER SUPPLIED 4' X 4' WORK PIT 1-2" DB-120 DISCONTINUOUS PVC CONDUIT ± 20' INST. 1-RUN 1/0 UG PRI CABLE ± 40' (CØXXXXXX) CUSTOMER SUPPLIED 6' X 6' WORK PIT 2/3 CUBIC YARDS OF 6” CRUSHED ROCK CUSTOMER SUPPLIED NEW CØXXXXX SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: VERIZON WIRELESS M/S PO BOX 2375 SPOKANE, WA 99210-2375 MARK CLEMENS (206) 775-5105 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.105087408FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 505329193 104299418 PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service E-Mail: Cell Phone: Project Manager Contact Information: Manager:VAL BUZUNOV (425) 457-9938 VAL.BUZUNOV@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP VAL BUZUNOV (425) 457-9938 12/29/17 VAL BUZUNOV (425) 457-9938 12/29/17 N. PETTIE (714) 893-2405 12/29/17 REQUIRED RENTON VERIZON SEA RELIABLE 1Ø PRI L/E 4201 LIND AVE SW, RENTON, WA 98055 N/A N/A N/A 105087408 AS NOTED 1 OF 1 KING N/A N/A QCSOKE 30SW-T23R-05E N/A N/A 2305E119 2305E124 2305E119 VIC-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 105087408500771819 CUSTOMER & DEVELOPER NOTES THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE 6' X 6' WORK PIT & &8%,&<$5'62)´&586+('52&. AT V01 5(48,5('723529,'(¶;¶:25.3,7$7J01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Inclement weather conditions may cause delays in construction times and dates. 10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. POWER GENERAL NOTES - COMMERCIAL PROJECT CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE VIC-17 06/2017 236.00 242.00 233.00 0.00 0.00 0.88 236.00 242.00 233.88 OVERHEAD CIRCUIT MAP 2305E124 SCALE: 6" = 1 MILE NEW CABLE & CONDUIT DIAGRAM NOT TO SCALE JOB SITE JOB SITE ASPLUNDH CONSTRUCTION CORP. CIRCUIT FEET ADDED: 20' SQ. FOOTAGE: N/A PANEL SIZE: 200A HEAT TYPE: ELECTRIC EST. DEMAND: 9.6kW LRC: 65A % V. DROP: 0.8% % FLICKER: 1.5% UNDERGROUND CIRCUIT MAP SCALE: 1" = 50' SITE SPECIFIC NOTES AT J01: 316704-165601 -EXISTING J-BOX TO REMAIN -INSTALL (1) L/B ELBOW (ELB10J) PER STD 6045.1010 AT V01: 316699-165585 -INSTALL 36" x 42" MP HH & GRNDS (MINU1SR) PER STD 6045.1010 ,167$//N9$‘Y3$'0281775) 0,' -INSTALL (1) L/B ELBOW (ELB10J) PER STD 6041.1000 -CONNECT 1 RUN OF CUSTOMER OWNED 3/0 UG TPX -INSTALL GRID #316699-165585 SPAN SPECIFIC NOTES J01 TO V01: ,167$//'%',6&217,1828639&&21'8,7“ ,167$//5818*35,&$%/(“ Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 316699-165585 25kVA 6247000 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA VAULT & EXCAVATION DETAIL @ V01 Not to scale PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE J01 V01 2 1 20'48 44 1/0AL JKT 40'CØ_- 2" PVC (FT) & BENDS =0 0 0 0 1/0 AL JKT TOTAL (FT) =40' NEW 25kVA 120/240v TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONTCommunications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation36"MinCover48"MaxBackfill(No rocks over 10" diameter)Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. 1253810010 PARCEL #