HomeMy WebLinkAboutMFP18001996DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18001996
IVR Number: 18001996
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :04/17/2018Application Date:0323059108Parcel Number:2505 LYONS AVE NE
Permit Type:05/01/2018Issue Date:Franchise
Permit Work Class:05/01/2019Expiration Date:Minor Utility
Job Number:105086122Franchise Type:Electric
Description:Install new single phase primary UG line extension to 5 SF lots. Will be splicing to existing DB cable IP1. Asphalt cuts
anticipated. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105086122
Anish Kumar
253-208-2183
anish.kumar@pse.com
2505 Lyons Ave NE 98059 105086122
Occupying Lyons Ave NE for crew to install new single phase primary UG line
extension to 5 s/f lots. Will be splicing to existing DB cable IP1. Asphalt cuts anticipated.
Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
4/17/2018
MFP18001996
Scott Warlick 4/17/2018
Justin Johnson 4-26-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105086122
PSE/Potelco Inc.
Lee Brown 425-417-8620
6905 S 228th St, Kent, WA 98032
lee.brown@pse.com
2505 Lyons Ave NE 98059
TBD
5/5/2018
Anish Kumar 4/17/2018
MFP18001996
8:00 am to 3:00 pm
Monday through Friday
Justin Johnson
4-26-2018
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
NE 24TH C
T LYONS AVE NE131313
13
1111ONE LANEROADAHEADW20-4X'X'X'ROADWORKAHEADW20-1W20-7AO
N
E
L
A
N
E
R
O
A
D
A
H
E
A
D
W20-4X'X'X'R
O
A
D
W
O
R
K
A
H
E
A
D
W20-1W20-7AFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKING SIGNS TO BE
PLACED ON BOTH SIDES
OF THE WORK AREA
NO-PARK
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
STOP
FLAGGER
STOP
FLAGGER
PV1
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Job#105086122
2505 Lyons Ave NE, Renton, WA
March 30, 2018
Sheet 1 of 1 brent.pogson@pse.com
(425)398-6158
N
PSE PUGET
SOUND
ENERGY
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
MFP18001996
TRACT 'C'
LOT
1
TRAC
T '
A'
LOT
2
LOT
5
LOT
3
LOT
4
LYONS AVE NETRAC
T '
A'
EXISTING HOME
TO REMAIN
(2505 LYONS AVE NE)
EXIS
T.
PAR
K
TR. 'D'
26'
48'
N
Vicinity Map
47.5137, -122.1462
Owner / Developer Contact Info
officeATTN:
MIKE & CINDY MERRITT
2505 LYONS AVE NE
RENTON, WA 98059
MIKE MERRITT 206.819.9042
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
501145908 105086122
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
504812267 107054852
N/A 106328481
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
105086122107054852DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. BROWN 425.417.8620 .
J.SINGLETON 253-395-6967 3/12/18
J.SINGLETON 253-395-6967 3/12/18
E. HAUSER .11.29.17
REDT # ( RW-103178 )RENTON
MERRITT SHORT PLAT
1Ø PRIMARY U/G LINE EXTENSION - 5 S/F LOTS
2505 LYONS AVE NE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107054852 105086122
1" = 50'1 OF 1
KING 30 CIKNC QCSOKE
03NE-T23N-R05E 204.036 204.087
2305E009 2305E040 2305E009 MAP-16
COMCAST
BILL WALKER
253-288-7538
CENTURY LINK
AMY ALLISTON
206-794-8534
RIGHT OF WAY
VALERIE CONNELL
425-462-3284
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LEE BROWN
425.417.8620
Lee.Brown@pse.com
x
x
x
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-16
6.13.17
183 228 212
6 N/A N/A
189 228 212
...
...
...
x
MIKEANDCINDYMERRITT@MSN.COM
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
3'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
3'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
1" = 50'
SITE PLAN
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 330'
17 4000
140 AMPS
VAULT DETAIL @ V01
NOT TO SCALE STD 6775.0030
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
CROSSINGS CONDUIT TABLE
GAS POWER Length
X-ING Location Size Type Qty Location Size Type Qty
NO.from to (in)sched each N-S-E-W (in)sched each (ft)
X01 LOT 3 LOT 5 2 40 1 EAST 3 80 1 30 SECONDARY, GAS SERVICE
X02 LOT 3 TR.A 3 80 1 30 SECONDARY ONLY
2" SCHED 40 YELLOW PVC (ft) =30 60 3" SCHED 80 GREY PVC (ft)
Total 2" PVC Plug /Caps =2 4 = Total 3" PVC Plug Caps
Remarks (type of crossing)
(Primary, Feeder, Secondary,
St. Light, Gas only, etc.,)MFP18001996