Loading...
HomeMy WebLinkAboutP_AMR_Standard_93508342_V1_180419Cellnet AMR Equipment 6325.3380 Effective on: 08/01/06DCanceling: 06/01/05Page 9 of 13 2005 Puget Sound Energy, Inc. Micro-Cell Controller (MCC) Installations, Continued Typical MCC riser installation adjacent to a padmount transformer ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ 18 Min Clearance Padmount Transformer (Front) MCC Unit 36 Min 36 Depth Cement2-3/8 Steel Post3/4 Conduit for Power25 30460 Handhole #6BC Ground Wire Padmount Transformer FRONT MCC Unit shall be mounted behind the front half of the transformer Clear Working Space TOP VIEW 18 Min Clearance FRONT VIEW 8 Ground Rod Figure 7