HomeMy WebLinkAboutP_AMR_Standard_93508342_V1_180419Cellnet AMR Equipment 6325.3380
Effective on: 08/01/06DCanceling: 06/01/05Page 9 of 13
2005 Puget Sound Energy, Inc.
Micro-Cell Controller (MCC) Installations, Continued
Typical MCC riser installation adjacent to a padmount transformer
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
ÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎÎ
18
Min
Clearance
Padmount
Transformer
(Front)
MCC Unit
36
Min
36
Depth
Cement2-3/8 Steel Post3/4 Conduit for Power25
30460
Handhole
#6BC
Ground
Wire
Padmount
Transformer
FRONT
MCC Unit shall be mounted
behind the front half of the
transformer
Clear
Working
Space TOP VIEW
18
Min
Clearance
FRONT VIEW
8
Ground
Rod
Figure 7