HomeMy WebLinkAboutP_Design_101111133_V1_180424JOB SITE
318098-166282
50 kVA 120/240V (B)
318099-166276 FACTORY PL
NFACTORY AVE NN MARION ST
ROW
60'#2ACSR BPCR
14
343
337
333
325
321
320
345
-CUSTOMER TO INSTALL 1-3"
SCH'L 80 DISCONTINUOUS
CONDUIT, ±50'
-PSE TO INSTALL 1/0 UG TPX,
±90'
-CUSTOMER TO PROVIDE
4' X 4' WORK PIT & 3/4
YARD OF SAND
-CUSTOMER TO PROVIDE
4' X 4' WORK PIT & 3/4
YARD OF SAND
JOB SITE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
ORDER#NOTIF#
PWR
PROJECT PHASE
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
SCALE: 1" = 50'101111133THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
2180 SQ.
200AMPS
GAS
8 KW
80A
1.6%
2.0%
CIRCUIT FEET ADDED: 0'
SCHEDULE: 27
SITE SPECIFIC NOTES
P01 (318098-166282):
-EXISTING DISTRIBUTION POLE & OH TRF TO REMAIN
-RECONNECT EXISTING 1/0 OH TPX SECONDARY WIRE
P02 (318099-166276):
-EXISTING DISTRIBUTION POLE TO REMAIN
-INSTALL 1-3" CONDUIT RISER W/ S/O BRKT STD 6042.10000 (RIS3CSS)
M01:
-INSTALL 200A METER
SPAN SPECIFIC NOTES
P01-P02:
-EXISTING 1/0 OH SECONDARY TPX TO REMAIN
P02-M01:
-INSTALL 1/0 UG TPX SERVICE WIRE, ±90
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT P02.
-PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M01.
TRENCHING & CONDUIT.
-INSTALL ±50' OF 1-3" SCH'L 80 GREY PVC DISCONTINUOUS CONDUIT FROM P02 TO M01 .
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED
5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
-IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PCR-14
2017
106 103 98
-1.17 -
106 104.17 98
SCALE: NONE
CABLE & CONDUIT ONE-LINE DIAGRAM
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
FABIAN GOMEZ 206-573-0031 3/20/18
FABIAN GOMEZ 206-573-0031 3/20/18
N/A N/A N/A
TIN NGUYEN 253-244-4303 3/20/18
REQUIRED RENTON
337 FACTORY AVE N
OH-UG SERVICE
337 FACTORY AVE N, RENTON WA 98057
N/A N/A
N/A 101111133
AS NOTED 1/1
KING N/A N/A CSPSKEIN
NW 17-23N-05E N/A N/A
2305E066 2305E040 2305E066 PCR-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Owner / Developer Contact Info
officeATTN:
HP CONSTRUCTION
13037 OCCIDENTAL AVE
BURIEN WA 98168
HAL PONCIN 206-334-7258
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:FABIAN GOMEZ
206-573-0031
FABIAN.GOMEZ@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
Superior 101111133505690816
METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover Separation
12" Min
20" Min
JOINT TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
To Excavated Dirt Pile
36" MINIMUM COVER
IN RIGHT OF WAY
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
Standoff Bracket
15" Min Length
Conduit Clamp Conduit
Field Face
Quadrant
Climbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic