HomeMy WebLinkAboutP_Design_186050399_V1_180430:s
3
Z
In
a)
a)
M
O
Ln
O
00
/
v
U
0
O
rn
N
rn
O
Ln
O
Q0
00
0
N
+s
a�
v
0
U)
1-11z
LL
L
0
V)
col
V)
0-
v
a
CJ
X
Q
00
M
I
0
CV
L
CL
Q
18525 4, 16252-166558
18521 18416
1 16522
316245-166557
W T212 11631
to 25kVA 120R40v
a 18828 W
3.481 8 Q 316238-16651
= 10kVA 1
18552 F_ 18418
11833
18551
16231-166556
18568 25WA 120t240v
18535 18563
1
18569 6574
18574
18559
18434
11456
261t4s4 11442 TREE TRIMMING
11448 EQUIRED
18/44
SE 186TH ST
IP{AaR 16600
2/13
316209.16652 ' ;'2W240v P01 316206 100T
25kVA 12040v 166557 X8936
316200.166567
1143511443 18605
PAN
15
11432 11438 11518
% -//14 18608
SE 186TH PL 18826 316163.166576
A"
0
!a = ABcN 31617&166556
316179.166240 25kVA 1201M
25kVA 1201240v iInOT
SITE PLAN
SCALE: 1:100
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
SITE SPECIFIC NOTES
P01: 316206-166557 (TREE TRIMMING REQUIRED)
-INSTALL TRIPLE HELIX OR 24" PLATE ANCHOR EAST L=13'
-REPLACE EXISTING DOWN GUYS W/ 2 NEW 7/16" DOWN GUYS (1 PRI, 1 NEUT) TO NEW ANCHOR EAST
CREW NOTE
CREW CAN INSTALL 24" PLATE ANCHOR INSTEAD OF TRIPLE HELIX IF NECESSARY DUE TO SOIL CONDITIONS OR
UNDERGROUND UTILITIES
:� •.1 '• :.:�_ B QUI 15T C ASI
^) + • ^ PAN In b...... !
;A
— — -VX5150 A_ s f �r 80* 5r : A !
40T - a - -
5T - - i 15T 6 T - I
_1c _W 181 Sr !
_ 182 I _ST � f -- -� SK00 2A.52
+ — X10756 I
B 15T A•••.:G�
• ' --I X4683 ` W
........
�g �' I 25TIs
••....I}....:..�.: C I Q
v • SK538 100T JOB SITE
65T SE 184 ST 25T A;� X10086 !
A (�,
65T A. A+D Y -Y -Y -Y-Yf-
SK270 •c OT I I 65T 65T A
4oT SK537 !
--}--- -- !A 40T
as
:f2_5 7T 100 SE 186_PL 25
30:: X8936 25T C
a, eLusav SK535 25T !
H/LLS —• B ! 40T
•'B _ 1OOT C QT T75699
••—r�— — .....
W 188 I ST—F--
516
• NIC :*-A
�" A =' r � X9694 1 165T
.ry •��.: ! Q , 65T ........X75557
T •: A C A ~SE 189 PL C BC
i
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
POWER GENERAL NOTES
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three
(3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work
to get the underground facilities located.
4. All work is to be done in accordance with local municipal and county permit requirements as applicable.
5. Inclement weather conditions may cause delays in construction times and dates.
E N G R-1: # 114290
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Deviations noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name Date
PROJECT PHASE
NOTIF#
ORDER#
PWR Superior
Misc. Expense
505162760
186050399
N/A
186051307
N/A
N/A
NIA
N/A
Vicinity Map
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL (800) 424-5555
Developer Yes
"Locates Required" No x
"Outages Required" Yes
"Flagging Required" Yes x
N
3
6R) LA ACISA Gig ib *P.
°
MEADOWS Et.
PHONE NO DATE
Fes,.
n5 �rmrtnmxr� `�"�"
PROJECT MGR S.VEGA
253-327-3162 03/14/18
1
9 C N ^a £! N HILL
253-327-3162 03/14/18
REV# DATE
BY DESCRIPTION
ENGR - GAS N/A
N/A N/A
COUNTY
KING
Emer Sect Gas Wk Ctr
WA N/A
JOB SITE J
DRAWN BY V.EDER
253-234-6129 03/14/18
CHECKED BY
1/4 SEC
SW33 T23 R05E
OP MAP
WA
PLAT MAP
N/A
APPROVED BY
sf-j
FOREMAN #1
#'nn1�-�Gs�a GsE.Rga .
U -MAP NO (POWER)
2305E131
OH CKT MAP
2305E136
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL (800) 424-5555
Developer Yes
"Locates Required" No x
"Outages Required" Yes
"Flagging Required" Yes x
Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG
No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
No x REAL ESTATE/EASEMENT PERMIT
No RIGHTS REVIEW CITY OF RENTON
3
FUNCTION CONTACT
PHONE NO DATE
2
PROJECT MGR S.VEGA
253-327-3162 03/14/18
1
ENGR - POWER S.VEGA
253-327-3162 03/14/18
REV# DATE
BY DESCRIPTION
ENGR - GAS N/A
N/A N/A
COUNTY
KING
Emer Sect Gas Wk Ctr
WA N/A
POWER WK CTR
QCSOKE
DRAWN BY V.EDER
253-234-6129 03/14/18
CHECKED BY
1/4 SEC
SW33 T23 R05E
OP MAP
WA
PLAT MAP
N/A
APPROVED BY
sf-j
FOREMAN #1
U -MAP NO (POWER)
2305E131
OH CKT MAP
2305E136
UG CKT MAP
2305E131
CIRCUIT NO
PAN -15
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
CONTACT
PHONE#
N/A
NIA N/A
N/A
N/A N/A N/A
N/A
N/A N/A N/A
N/A
PUGET
SOUND 2305E131 PAN -15 116TH AVE ANCHOR
INSTALL NEW ANCHOR & DOWN GUYS
ENERGY 18600 116TH AVE SE, RENTON, WA 98058
DESIGNED BY POTELCO
INCIDENT
N/A
MAOP
N/A
Gas Order
N/A
Elect Order
186050399
SCALE
1:100
PAGE
1/1