Loading...
HomeMy WebLinkAboutP_Design_186050399_V1_180430:s 3 Z In a) a) M O Ln O 00 / v U 0 O rn N rn O Ln O Q0 00 0 N +s a� v 0 U) 1-11z LL L 0 V) col V) 0- v a CJ X Q 00 M I 0 CV L CL Q 18525 4, 16252-166558 18521 18416 1 16522 316245-166557 W T212 11631 to 25kVA 120R40v a 18828 W 3.481 8 Q 316238-16651 = 10kVA 1 18552 F_ 18418 11833 18551 16231-166556 18568 25WA 120t240v 18535 18563 1 18569 6574 18574 18559 18434 11456 261t4s4 11442 TREE TRIMMING 11448 EQUIRED 18/44 SE 186TH ST IP{AaR 16600 2/13 316209.16652 ' ;'2W240v P01 316206 100T 25kVA 12040v 166557 X8936 316200.166567 1143511443 18605 PAN 15 11432 11438 11518 % -//14 18608 SE 186TH PL 18826 316163.166576 A" 0 !a = ABcN 31617&166556 316179.166240 25kVA 1201M 25kVA 1201240v iInOT SITE PLAN SCALE: 1:100 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) SITE SPECIFIC NOTES P01: 316206-166557 (TREE TRIMMING REQUIRED) -INSTALL TRIPLE HELIX OR 24" PLATE ANCHOR EAST L=13' -REPLACE EXISTING DOWN GUYS W/ 2 NEW 7/16" DOWN GUYS (1 PRI, 1 NEUT) TO NEW ANCHOR EAST CREW NOTE CREW CAN INSTALL 24" PLATE ANCHOR INSTEAD OF TRIPLE HELIX IF NECESSARY DUE TO SOIL CONDITIONS OR UNDERGROUND UTILITIES :� •.1 '• :.:�_ B QUI 15T C ASI ^) + • ^ PAN In b...... ! ;A — — -VX5150 A_ s f �r 80* 5r : A ! 40T - a - - 5T - - i 15T 6 T - I _1c _W 181 Sr ! _ 182 I _ST � f -- -� SK00 2A.52 + — X10756 I B 15T A•••.:G� • ' --I X4683 ` W ........ �g �' I 25TIs ••....I}....:..�.: C I Q v • SK538 100T JOB SITE 65T SE 184 ST 25T A;� X10086 ! A (�, 65T A. A+D Y -Y -Y -Y-Yf- SK270 •c OT I I 65T 65T A 4oT SK537 ! --}--- -- !A 40T as :f2_5 7T 100 SE 186_PL 25 30:: X8936 25T C a, eLusav SK535 25T ! H/LLS —• B ! 40T •'B _ 1OOT C QT T75699 ••—r�— — ..... W 188 I ST—F-- 516 • NIC :*-A �" A =' r � X9694 1 165T .ry •��.: ! Q , 65T ........X75557 T •: A C A ~SE 189 PL C BC i OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. 5. Inclement weather conditions may cause delays in construction times and dates. E N G R-1: # 114290 FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Misc. Expense 505162760 186050399 N/A 186051307 N/A N/A NIA N/A Vicinity Map For contacts below dial 1 -888 -CALL PSE (225-5773) CALL (800) 424-5555 Developer Yes "Locates Required" No x "Outages Required" Yes "Flagging Required" Yes x N 3 6R) LA ACISA Gig ib *P. ° MEADOWS Et. PHONE NO DATE Fes,. n5 �rmrtnmxr� `�"�" PROJECT MGR S.VEGA 253-327-3162 03/14/18 1 9 C N ^a £! N HILL 253-327-3162 03/14/18 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr WA N/A JOB SITE J DRAWN BY V.EDER 253-234-6129 03/14/18 CHECKED BY 1/4 SEC SW33 T23 R05E OP MAP WA PLAT MAP N/A APPROVED BY sf-j FOREMAN #1 #'nn1�-�Gs�a GsE.Rga . U -MAP NO (POWER) 2305E131 OH CKT MAP 2305E136 For contacts below dial 1 -888 -CALL PSE (225-5773) CALL (800) 424-5555 Developer Yes "Locates Required" No x "Outages Required" Yes "Flagging Required" Yes x Yes x PSE 2 BUSINESS DAYS BEFORE YOU DIG No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES No x REAL ESTATE/EASEMENT PERMIT No RIGHTS REVIEW CITY OF RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR S.VEGA 253-327-3162 03/14/18 1 ENGR - POWER S.VEGA 253-327-3162 03/14/18 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr WA N/A POWER WK CTR QCSOKE DRAWN BY V.EDER 253-234-6129 03/14/18 CHECKED BY 1/4 SEC SW33 T23 R05E OP MAP WA PLAT MAP N/A APPROVED BY sf-j FOREMAN #1 U -MAP NO (POWER) 2305E131 OH CKT MAP 2305E136 UG CKT MAP 2305E131 CIRCUIT NO PAN -15 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# N/A NIA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PUGET SOUND 2305E131 PAN -15 116TH AVE ANCHOR INSTALL NEW ANCHOR & DOWN GUYS ENERGY 18600 116TH AVE SE, RENTON, WA 98058 DESIGNED BY POTELCO INCIDENT N/A MAOP N/A Gas Order N/A Elect Order 186050399 SCALE 1:100 PAGE 1/1