HomeMy WebLinkAboutP_Design_105086000_V1_180502SITE PLAN
SCALE: 1" = 50'
40T
I
I . CK 549 40T
I
140T1.r,
W : t
✓� �>K 25T %.
25T
261 240
105086000
t'
EST. NEW LOAD -
t
NIA
T 1 t
•<�TT
V
NIA
NIA
NIA
NIA
n
° 10.10T X11684
ppl
V�LJ Y
tk25T I C r
NIA
NIA
25T
SME
CABLE TV
2
1BEACH
qe
° 2,5'i@ 10T
PARK
40T 15T �
Eb i.'I�iT[P�i3�
POWER WK CTR
CSPSKEPM
DRAWN BY J44eyinville
r°
CHECKED BY
,915
114 SEC
SW -07 -24N -05E
SOT
40T X11 794 ,
X11792 25T
X10053"41*77
X11793
t�'3" 4Y12_A6 s
a n 9+im" I
*0 A
&c, �7 sr B :.
` X
X9558i -� 1
ianl ICp�567 85i i Bl3i
86
40T
1%.
1"I
sv !
Sr
l ®® " T7641
HAZELWOOD
3U9 C ym laA e%°...« °r *" ^.30 0820p °=A
X8829 2 -�� 4�T I mo( .....°'� .a♦e .a♦° ®�
30 79 S7
AO 73 PL
30
N A ry e �qI (lAO 25T 3"°'a®"t=`�`
HAZ
�.;
12 X120
I* ,� 5"♦"" n A 15T C s" Wa.•"e I r- t3>sgf3789
SITE SPECIFIC NOTES
P01: EXISTING 319339-166191
EXISTING DISTRIBUTION POLE TO REMAIN
REMOVE EXISTING 15kVA 120/240V 2B OH TRF AND RETURN TO PSE YARD [3-111
REMOVE EXISTING TRIP -O -LINK CUT-OUT
-INSTALL 1 - NEW LIB CIO ON CIO ARM, FUSE @ 15T
-INSTALL 1 - 50kVA 120/240V OH 1 B TRF
-INSTALL 1 - 3" SECONDARY RISER ON EXISTING SIO BRKT [3-6)
HH1 - NEW
-INSTALL 1 - 13" X 24" SECONDARY HAND HOLE (HH1 3350)
-INSTALL 3 - 4 POS #6 - 350KCMIL SECONDARY CONNECTION BLOCKS
DEVELOPER & CUSTOMER NOTES:
THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE 4'X 4' WORK PIT & 1 CUBIC YARD OF 5118" MINUS AT P01
-REQUIRED TO PROVIDE 5'X 5' WORK PIT & 1 CUBIC YARD OF 518" MINUS AT HH1
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL
TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS
COMPLETE
-L&1 INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
-RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING
TRANSFORMER INSTALLATION
Installed at site: Poll
Grid Number: 319339-166191
kVA Rating: 50kVA
Material ID#: 6211350
Foreman to redline the following information
Company ID#:
Primary phase connected to:
Tested Secondary Voltage 1
STANDARD EASEMENT PROVISION
An easement is hereby reserved for and conveyed to Puget Sound Energy,
Inc., Telephone Co., Television Cable Co., and their respective successors
and assigns under and upon the private street(s), if any, and the exterior
ten (10) feet of all lots, tracts and spaces with in the plat lying parallel with
and adjoining all street(s) in which to construct, operate, maintain, repair,
replace and enlarge underground or ground -mounted appurtenances
thereto for the purpose of serving this subdivision and other property with
electric, gas, telephone and other utility service, together with the right to
eater upon the streets, lots, tracts and spaces at all times for the purposes
herein stated.
.:.
TRANSFORMER REMOVAL
Removed at site: PO
Grid Number: 319339-166191
kVA Rating: 15kVA
Foreman to redline the following information
Company ID#:
Primary phase connected to:
Tested Secondary Voltage 1
EROSION & SEDIMENT CONTROL REQUIREMENTS
POWER GENERAL NOTES - PLAT PROJECT
1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
2. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE -LINE DIAGRAM.
3. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB -120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
4. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &.
CONDUIT TABLE.
5. AT SYMBOL: — — — — — — INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
6. AT SYMBOL: 0 INSTALL MINI -PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
7. AT SYMBOL: ® INSTALL SECONDARY PEDESTAUHANDHOLE W/ (3)
MULTI -CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: T SQ.)
8. AT SYMBOL: ❑J INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
9. AT SYMBOL: �� INSTALL SECONDARY CABLE & CONDUIT STUB -OUT.
10. AT SYMBOL: -* INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STAN DARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS.)
11. INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
A)Url V I HAZ.,..
[,.
)648
1 10 T X66;14 % C__; 3
10OT„
100T
1; A,
401' `I !e
C � 002773 I t
kp A N
40T t
<.
%
S
X1178930
1 00T
«®MNf px .® l -wrxxc.asa1°ma4 N C 25TA m !4?T @` ♦« �mY . _ " °
A ♦ ti , X1178 527 6 30 zi� m
® kX4157 !0C «°�♦� «`;
°
N�
°e sl�s m♦P N♦♦•♦♦♦ R @, m
3 65T °40 "' I3 . " r 30
P 1sT X9"i'2 r r ,«� ,� °♦°"�..»°.«"....."« , »
CK58tl rK5 2 EAZ S>z ii' m:
%. %N� X127 65T 25T w♦Q ;""" *^.A.n s •.. .°°
tC A 34 00 h X5487 ' -„ '; 16
• rA
X11787 I 25T i e : C® « ,� �B X2� "•a° ,♦m°A�.tl.mm.<.«.♦«°« N°&
.a a
,.d 65T 6 .. , 2� T N .ma:ta•.>..°�3� °
a % I X669T _ z®,°•> I4(aTa� �.:N `R N.t.: ♦ A «g
% B.•°X 027 I �y7 m�`,......... — N.. L X1 01 9 «a ���� ,,a,l gab �" "xR '�-°@ ��'� »�. .^y t pyN�«�.y0�°ems«y%//y � :,""°"` A
FNT '".° �'4P3 E p°r♦♦ �Y " mfim"mo»s, a ai' I.MR.f4il
30 a`�. t " N �' 0: «« C® ° 13A i K35 I :• 6" m " a � « « .° "-- U074 ff
15T " 65T P " �d° °.: %/ »aa� Nm«3
%.N � ' 6 • ..w Y • i 1�... . e is"Ra«N !° d ® E.a.S E
< r+° m «0a a
X 78 ..-2 .251 l.�B ..IT75703 I 9 xu. QTY®%%« 1t3C�T YN � " ♦<.♦s � e' 4I5T � � ,NN'A "•a♦.m«
1 d %` tlPo °� 3N
1 P
X1 155 .5.. 1 !s I 1 40T<325T "P ' T77543 401 �- 10T 125T °°"mA C A '�`' C t"e°a" 3t R I CA TIE m N ` ;N, %.•° •"°
/r i7DT�5T25T 1 25T 1 1 B •"' - X196 15T ""p t..N%«.%.... 4{jT t ". q °'area' g �� °a a �M m2T m.;;.•° `10 10
11
a5T C .. I I %,"P 40T .... A —457- �, � 4-01' rears � . �> ��• �`.�R��. - ` � � 25T
«w..4. I ` ; .,'`' r . :".. e m ii iv. ♦"s`
U l 40T I _ U 25T :"" 125T • gay
X9617 — _ rVol
� €I A 100T I ..%...30
p�. �" [b a a %� g ...%N.° °
!sa••! —""' 7Kl 1 25T I aa«l a,: s� mr"° �"° "�' 4w„ 1 it N x®" ALF gy✓<"« m a e %se° °°mm."�
CO2377@', / r,.p'1� B 40T •`" 1 � � ,.a 4E3T""'..• C4�3 2 G aC 1f?OT m.. %.` _ A Qr
4taT � . gym" '� 3 a a At
L..r `3A7 . ,�" °N CB a
_ _ _: - «.
X71' %...•• - . 0 B
2 TOTS Sr
`� �t'1 9.s.°ass. �a ...N �"' °^ C7 C(O a,7l ri9l�ti to X972S aam 'b aeamcoa rr�a� c %ed°!M !_> T
100TX 9 '€ a'• 18
C 25T g , 65T 6 d C3pT A� X01 11T " • " t <
m - °<, A a :N `Am 651 40T � 1._ �� slc � �4 .......
� « B
X111 c ittt N % 7 1 0r0' `� � 14u . 1 • «° ma» a' 40T 1 1000 �� QT � T :,� l � ,�"!� I A2
X1 53 E35T r
C(HAZ « " .>»
Q1 � a ,i`�G03a92 d4d � i.�«.�,.."..� I r � .,.. .,� .... ,.... _ ,,,, .
R352 _A _ t 4 . :�.":.a X1 57- t� X11358
gg$$�� ,gy t 1 40" � H ,�B I `-" -"'Y ,�, ..,: 40T
Y9 Y •• xh✓T 4SI4 "°II. RN»f im�R8A 4N 40
65T I _ 40 _ _A C04. � B SITE I 4Ci5 C .. .,,y . 40"� _ t .a ....... °e a
t`N 3.3 5r «
t�+i� 4iiT 40T t ., « 65T ifi � � °,� •�" m ��%N ,B � �
I X08281 14 _ _C _ �a
♦ �;"; �2 V
2e405E I tV Z2 S'r j : •. ♦ ` I "•. St a♦ r m am A? LY 00230t3iG °
40T 240SE124 :
At �_/ y{A ._g _ y3_� ({y �j y/ p ( 25 y N2C # 5 5 j •«"«.:a 1275 cel:
I .:ux. !�r1l 1 W—Nie .:.,.. `6. B, J\Li Yr t,%J °d' �' 6'" Y q .YS 3P�3 a ii.1 L1i j4a m6mr p @
$# ` m«%m N
o_
1 ,»
I XCi 62 : �rN 29
4: UO3 °PNS. a; - X 721 s ° c' . �
m,a>
X 131 T 3 7 40T r ".�
a °
Cr
�
DEAD t-tln 4C�T s� �$� &« m•C HIC G ±� ..��..... T71
«. . -, —� X1 3�- ®3 "« 65T 513 PR X722 » !%N�, B�
% 15 1N
1000 . .a 4C1T 2 T X � °' 1
40T A x� g� ,• �
' �'�' X76781 �N ffi»,; 25T %•_` 0 w� a 251 13�C LY I�
®. � Y 85° " C ®1 1 x. i 6 I
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
CIRCUIT LOADING TABLE
CIRCUIT: HAZ-15
AS OF 6113117 A PHASE
B PHASE C PHASE
ORDER#
EXIST. PEAK LOAD 201
261 240
105086000
NIA
EST. NEW LOAD -
- 3.07
NIA
TOTAL 201
261 243.07
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition
Grid Cable and Switch umbers
❑ n INSTALLED &VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Deviations noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name
PROJECT PHASE
NOTIF#
ORDER#
PWR Superior
TRF Removal
Relocation
Removal
Temporary
Job Order
504669671
105086000
NIA
583057532
NIA
NIA
NIA
NIA
NIA
NIA
NIA
NIA
GAS Distribution
Service Stubs
HP SvcIMSA
NIA
NIA
NIA
NIA
NIA
NIA
CABLE TV
ENGR - GAS NIA
NIA NI
PHONE
Emer Sect
Eb i.'I�iT[P�i3�
Vicinity Map
NIA
O
Project Manager Contact Information: INTOLIGHT Contact Information: 9675 SE 36th ST #105
Manager. Marc Bayley N/A Mercer Island, WA 98040
Dmitry zlin 206
ATTN: Dmit Ma office
Cell Phone: (253) 259-4484 NIA Phoney ( } 558-1147 Ext 114 o
E-Mail: MARCUS.BAYLEY@PSE.COM For contacts below dial 1 -888 -CALL PSE (225-5773)
rA! ! Q7i TAlA QIICl111CCC HANG eccnoc vn!! n!r
Developer Yes x Yes
"Locates Required" _ No No
"Outages Required" Yes x No
"Flagging Required" Yes x No
PSE
X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
REAL ESTATEIEASEMENT PERMIT
Required City of Renton
N
NIA
..,,
FUNCTION CONTACT
PHONE NO DATE
2 NIA
NIA
NIA
PROJECT MGR Marc Bayley
(253) 259-4494 218118
1 NIA
NIA
NIA
ENGR - POWER Nate Linville
(253) 970-7284 218118
REV# DATE
BY
DESCRIPTION
ENGR - GAS NIA
NIA NI
F Nil§1 rM
Emer Sect
Eb i.'I�iT[P�i3�
POWER WK CTR
CSPSKEPM
DRAWN BY J44eyinville
(253) 970-7284 TM
CHECKED BY
114 SEC
SW -07 -24N -05E
0
101111
JOB,
-/
01:
SITE
i5tiijii
UG CKT MAP
2405E127
CIRCUIT NO
HAZ-15
FOREMAN #2
MAPPING
V
j
r
JOINT FACILITIES ARRANGEMENTS
[}�Cp')
e d E ti@a.,i
Comcast
0
O
Project Manager Contact Information: INTOLIGHT Contact Information: 9675 SE 36th ST #105
Manager. Marc Bayley N/A Mercer Island, WA 98040
Dmitry zlin 206
ATTN: Dmit Ma office
Cell Phone: (253) 259-4484 NIA Phoney ( } 558-1147 Ext 114 o
E-Mail: MARCUS.BAYLEY@PSE.COM For contacts below dial 1 -888 -CALL PSE (225-5773)
rA! ! Q7i TAlA QIICl111CCC HANG eccnoc vn!! n!r
Developer Yes x Yes
"Locates Required" _ No No
"Outages Required" Yes x No
"Flagging Required" Yes x No
PSE
X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
REAL ESTATEIEASEMENT PERMIT
Required City of Renton
3 NIA
NIA
NIA
FUNCTION CONTACT
PHONE NO DATE
2 NIA
NIA
NIA
PROJECT MGR Marc Bayley
(253) 259-4494 218118
1 NIA
NIA
NIA
ENGR - POWER Nate Linville
(253) 970-7284 218118
REV# DATE
BY
DESCRIPTION
ENGR - GAS NIA
NIA NI
COUNTY
King
Emer Sect
Gas Wk Ctr
POWER WK CTR
CSPSKEPM
DRAWN BY J44eyinville
(253) 970-7284 TM
CHECKED BY
114 SEC
SW -07 -24N -05E
OP MAP
PLAT MAP
APPROVED BY
-/
FOREMAN #1
U -MAP NO (POWER)
2405E127
OH CKT MAP
2405E136
UG CKT MAP
2405E127
CIRCUIT NO
HAZ-15
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
Comcast
CenturyLink PSE - Gas
NIA
CONTACT
PHONE#
Bill Walker
Amy Alliston Kevin Haibeck
NIA
(253) 288-7538 (206) 794-8534 (206) 604-5448
NIA
PUGET
SOUND
ENERGY
Kennydale Short Plat
OH to UG Sec LE, 3 Lots
1203 N 33rd PL, Renton, WA 98056 JSGAL�E
INCIDENT
MAOP
Gas Order
Elect Order
105086000
rPAGE
oted of 2
3
M0
W
0
cV
O
I
D
0
0
0
m
0
L0
0
U
I
Q
0
c
a�
Y
I
rn
0
0
v
C
as
a
a�
U
U
Z
D
N
iv
a
m
U
O
Oti
C
s
Z3
0
I
U
U
a�
LU
E
�i
I
ao
0
N
D
L
CL
P01 , 319339-166191
4 X 4 WORK PfT �.
50 kVA 120/240V
I
PSE PROVIDED I X
1 — 3" GRAY SCH80 CONDUIT
IN CUSTOMER TRENCH o I
5' X 5- WORK PIT
II
I
I
900 H H 1
36'
LOT 50'
PSE PROVIDED -
1 — 2" DB120 CONDUIT
IN CUSTOMER TRENCH
UL)IVUUII UTAUKAIVI
SCALE: NONE
I�
PSE PROVIDED
1 — 2 DB120 CONDUIT
IN CUSTOMER TRENCH
100
319339-166191
50 kVA 1201240V
I
X
PSE PROVIDED
1 — 350KCMIL AL SEC TPLX p I
I PSE PROVIDED
I 1 -- 4/0 AL SEC TPLX
I HH1 .
900 100'
R=36'k— 7--
LOT1 54'
OT OT3
PSE PROVIDED
1 — 4/0 AL SEC TPLX
Jt=IrUINUf'1KT Wkbl-t UTAUKAIVI
SCALE: NONE
Backfill forin Conduit- The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
Excavated Dirt Pile
32" Typical
(Power, Gas, 24" Min'��/��/�C
Final Grade Phone & Cable) To Excavated Dirt Pile
j\\
%,��.� X
24" Min �\�.- 12" Min 12" Min �:
to Separation Separation Backfill for Conduit
36" Max Free of rocks
Cover > larger than 8"
12" Min % in diameter
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
Gas Service Line TV & TEL Electric Service Cable in Conduit
in Conduit 3" Schedule 40 Grey PVC
Schedule 40 Yellow PVC
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
L71' 1--,— 42"
450 I 450 42"
I
v
c
J
a)
CL
0
Ia
Road Side
Top View of Mainline Trench for
Single Stubout Location
3' 3'
450 45" 42"
a�
`m
CL
2
lCL
Road Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
STUBOUT EXCAVATION DIMENSIONS
Not to scale
1'
LINE
TRANSFORMER
P (WHEN PRESENT)
L
TYPICAL NOTCH -OUT FOR TRANSFORMER,
& SECONDARY PEDESTAUHANDHOLE AT HH1
NOT TO SCALE
Conductors enter from —
beneath and shall be
folded back with handhole
X
Set handhole flush
to final grade
Captive L -Bolt
Lock Cover
SIDE VIEW
KNOCKOUT IN 2 PLACES
SINGLE PHASE SECONDARY HANDHOLE
Not to scale 6050.2000
Customer's
service
conductors
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
SIZE LENGTH
Design
(ft)
FROM TO
(1/0,4/0,350)
to Meteli
450
220
SEC 350 UG
3
P01
HH1
TPX
50 0
0
2
4/0 AL SEC
0
HH1
LOT1
TPLX
10 50
60
0
410 AL SEC
0
HH1
LOT2
TPLX
50 50
0
0
410 AL SEC
HH1
LOTS
TPLX
100 50
DEDICATED FACILITIES (105086000) for Preferred Stub Location
SITE
SPANE250
NAL
REMARKS
#
FROM
TOGE
-
LOT 1
LOT
DED. CONDUIT & CABLE
-
LOT 2
LOT 3
50
DED. CONDUIT & CABLE
TOTAL
FT=
100
Climbing
Space
_U
�/� Conduit
5" Min\/ -i