Loading...
HomeMy WebLinkAboutP_Design_104303425_V1_180516#2 ACSR ABCCBA1/0 ACSRC#6 CU 317970-167507 25kVA 120/240V 317970-167507 25kVA 120/240V 165 153 160 5220 5214 5162 148 134 126 317953-167521 15kVA 120/240V 317937-167521 317970-167540 15kVA 120/240V 317970-167522 10T X9483 25kVA 120/240V 317970-167507 25kVA 120/240V 1/0 ACSRJERICHO AVE NE (144TH AVE SE)NE 2ND ST 153#CAMERACUSTOMER INSTALLED, OWNED, AND MAINTAINED TPLX SVC MAP 17 00 1"2" 00 50'100' PROJECT PHASE PWR NOTIF#ORDER# Superior Owner / Developer Contact Info officeATTN: Americal Traffic Solutions 1150 N Alma School RD Mesa, AZ 85201 Angel Puerto (602) 882-2698 N Vicinity Map N/A OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SITE SPECIFIC NOTES SITE PLAN FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES - COMMERCIAL PROJECT 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Marc Bayley (253) 259-4494 Marcus.Bayley@PSE.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X SCALE: 1" = 50'104303425THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Marc Bayley (253) 234-6432 4/23/18 Nate Linville (253) 970-7284 4/23/18 Nate Linville (253) 970-7284 N/A Renton Jerico Ave Red Light Camera Svc Connect 1Ø Commercial Service, Set Meter 153 Jerico AVE NE #Camera, Renton, WA 98059 104303425 As Noted 1 of 1 King CSPSKEPM NE-15-23N-05E 2305E057 2305E088 2305E057 MAP-17 104303425505068246 CIRCUIT FEET ADDED: 0 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 0SQ. 60AMPS NONE 0.2 KW 65A 2.2% 2.5% AT P01: EXISTING 317953-167521 EXISTING DISTRIBUTION POLE TO REMAIN COMPLETE CUSTOMER OWNED RISER ON EXISTING STANDOFF BRACKETS CONNECT AD TAG CUSTOMER OWNED CONDUCTOR AT TRANSFORMER LEADS AT M01: NEW PSE METER DEPARTMENT TO INSTALL 200A METER ON CUSTOMER OWNED METER BASE SPAN NOTES P01 TO M01 CUSTOMER TO PROVIDE AND INSTALL TPLX SERVICE FROM M01 TO P01 AND BUILD RISER UP FIRST 10' ON EXISTING STANDOFF BRACKETS, CUSTOMER TO PROVIDE MATERIALS TO COMPLETE RISER UP POLE WITH WEATHER HEAD, CUSTOMER TO PROVIDE ENOUGH CABLE TO MAKE CONNECTIONS AT SECONDARY LEADS OF THE TRANSFORMER JOB SITE JOB SITE