HomeMy WebLinkAboutP_Design_104303426_V1_180516317890-167520
25kVA 120/240V
317872-167520
25kVA 120/240V
317858-167519
25kVA 120/240VCBA1/0 ACSR1/0 ACSRCUSTOMER INSTALLED,
OWNED, AND MAINTAINED
TPLX SVCJERICHO AVE NE (144TH AVE SE)SE 136TH ST MAPLEWOOD HEIGHTSELEMENTARY110
116
122
128
134
202
208 13466#CAMERA00 1"2"
00 50'100'
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Owner / Developer Contact Info
officeATTN:
Americal Traffic Solutions
1150 N Alma School RD
Mesa, AZ 85201
Angel Puerto (602) 882-2698
N
Vicinity Map
N/A
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SITE SPECIFIC NOTES
SITE PLAN
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES - COMMERCIAL PROJECT
9.
10.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Marc Bayley
(253) 259-4494
Marcus.Bayley@PSE.com
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
SCALE: 1" = 50'104303426THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Marc Bayley (253) 234-6432 4/23/18
Nate Linville (253) 970-7284 4/23/18
Nate Linville (253) 970-7284
N/A Renton
Jerico Ave Red Light Camera Svc
Connect 1Ø Commercial Service, Set Meter
13466 144TH AVE SE #Camera, Renton, WA 98059
104303426
As Noted 1 of 1
King CSPSKEPM
NE-15-23N-05E
2305E057 2305E088 2305E057 MAP-17
10430342650503110
CIRCUIT FEET ADDED: 0
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
0SQ.
60AMPS
NONE
0.2 KW
65A
0.0%
1.5%
AT P01: EXISTING 317953-167521
EXISTING DISTRIBUTION POLE TO REMAIN
COMPLETE CUSTOMER OWNED RISER ON NEW CUSTOMER SUPPLIED STANDOFF BRACKETS
CONNECT AD TAG CUSTOMER OWNED CONDUCTOR AT TRANSFORMER LEADS
AT M01: NEW
PSE METER DEPARTMENT TO INSTALL 200A METER ON CUSTOMER OWNED METER BASE
SPAN NOTES
P01 TO M01
CUSTOMER TO PROVIDE AND INSTALL TPLX SERVICE FROM M01 TO P01 AND BUILD RISER UP FIRST 10' , CUSTOMER
TO PROVIDE STANDOFF BRACKETS, CABLE AND CONDUIT MATERIALS TO COMPLETE RISER UP POLE WITH
WEATHER HEAD, CUSTOMER TO PROVIDE ENOUGH CABLE TO MAKE CONNECTIONS AT SECONDARY LEADS OF THE
TRANSFORMER
JOB
SITE
JOB
SITE