Franchise Permit: MFP18002841
IVR Number: 18002841
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :05/25/2018Application Date:9476200566Parcel Number:563 EDMONDS AVE NE
Permit Type:07/05/2018Issue Date:Franchise
Permit Work Class:07/05/2019Expiration Date:Minor Utility
Job Number:101111749Franchise Type:Electric
Description:Install new UG service to customer site. Removing OH service from P01. Customer is doing underground conversion
from V01 to M02. The new service for the home is coming from V01 to M01. Trench from the work pit to the vault and
trench across dirt ROW, south and approximately 40' across the road to the customers property. They will run two
lines of SCH 40 conduit to meter base. Pothole all existing utilities. Pavement cuts anticipated. Restoration per City of
Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101111749
Anish Kumar
253-208-2183
anish.kumar@pse.com
563 Edmonds Ave NE 98056 101111749
Project Scope includes install new UG service to customer site. We are removing
overhead service from P01 - grid number 318248-166598 as the lot subdivided and the customer
is doing underground conversion from V01 to M02 - Vault 318252-166597. Continued below***
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
5/23/2018
POTHOLE ALL EXISTING UTILITIES
Scott Warlick 5/30/2018
MFP18002841
Justin Johnson 7-5-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101111749
PSE/Potelco Inc.
Fabian Gomez 206-573-0031
6905 S 228th St, Kent, WA 98032
fabian.gomez@pse.com
563 Edmonds Ave NE
TBD
TBD
Anish Kumar 5/23/2018
MFP18002841
8:00 am to 3:00 pm
Monday through Friday
Justin Johnson
7-5-2018
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
The new service for the new home is also coming from V01 to M01. Crew will
trench from the 4'x4' workpit from the vault and will trench across the dirt Right of
Way, South and approximately 40 feet across the road to the customer's property.
They will run two lines of SCH 40 conduit to the meter bases. Pavement cuts anticipated.
Restoration per City of Renton standards.
1616100'100'100'100'1616MATCHLINESEE RIGHT100'100'100'
100'
100'16167 7
100'MATCHLINESEE LEFTJob#104300308563 Edmonds Ave NE, Renton, WAMay 2, 2018Sheet 1 of 1 gregory.harwood@pse.com(425) 424-6425www.trafficmanagement.com800.763.3999Traffic Control Services - Sales & RentalsPermits & Consulting - Engineering - TrainingPLAN PREPARED BY:DATE: 5/2/18PLAN ORDER: 36381TMI CONTACT PERSON: Michael FlanaganTCS CERT #: 301872CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040LANEWIDTHSPOSTED SPEED LIMITS20253035404510111255 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MFP18002841
318249-166577
25 kVA 120/240V (C)
318268-166599
SLAP1872
318248-166598
WINDSOR PL NE EDMONDS AVE NE566
563
HIG
16
318252-166597
25 kVA 120/240V (C)
PARCEL #
9476200565
PARCEL #
9476200566
2505
2502
568
572
578
609
605 601
605
574
570
566
562
CUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
4' X 4' WORK PIT
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
CUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
4' X 4' WORK PIT
INST. 1-RUN 1/0 UG TPX ± 100'
CUSTOMER SUPPLIED
1-3" SCH'L 40 PVC CONDUIT ± 90'
INST. 1-RUN 4/0 UG TPX ± 100'
CUSTOMER SUPPLIED
1-3" SCH'L 40 PVC CONDUIT ± 90'
INST. 1-RUN 1/0 UG TPX ± 220'
CUSTOMER SUPPLIED
1-3" SCH'L 40 PVC CONDUIT ± 210'
SITE PLAN
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE SPECIFIC NOTES
AT P01: 318248-166598
-EXISTING POLE TO REMAIN
AT V01: 318252-166597
-EXISTING PAD TO REMAIN
M01 AT "563": NEW TEMP METER
-INSTALL 200A METER
M01 AT "563": NEW METER BASE
-INSTALL 200A METER
M01 AT "566": NEW METER BASE
-INSTALL 200A METER
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
5(48,5('723529,'( ,167$//´',6&217,182866&+('8/(39&&21'8,7)520P01-M01 +/-__'
5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
-REQUIRED TO PROVIDE 6' X 6' WORK PIT &8%,&<$5'62)´&586+('52&. AT V01
-REQUIRED TO PROVIDE _' X _' WORK PIT AT HH1
5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-_________ INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION
-CUSTOMER TO CONTACT CUSTOMER CARE SERVICE (1-888-321-7779) WHEN READY FOR PERMANENT SERVICE
SPAN SPECIFIC NOTES
P01 TO "566":
-REMOVE EXISTING OH TPX SVC ¶
V01 TO M01:
&86720(572,167$//',6&217,18286*5(<6&+
/&21'8,7
,167$//5818*73;¶
V01 TO M02:
&86720(572,167$//',6&217,18286*5(<6&+
/&21'8,7
,167$//5818*73;¶
V01 TO M03:
&86720(572,167$//',6&217,18286*5(<6&+
/&21'8,7
,167$//5818*73;¶
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working
days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which
would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope
the trench to 1:1.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
00 1"2"
00 50'100'
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-16
6/2017
253.00 375.00 303.00
0.00 0.00 2.19
253.00 375.00 305.19
METER DETAIL @ M01, M03
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
REMOTE TEMPORARY METER DETAIL
SCALE: NONE
6' Maximum
5' Preferred
3' Minimum
Customer owned temporary
service conductors
Customer Post,
Meter Base,
and Panel
26"
4'4'
PSE Stubout
Stubout conduit covering the
temporary connection
NOTE:
required to allow working
room for the tools
necessary to connect
temporary service
4'x4' work pit
PSE Conductor
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
12" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
12" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
Will maintain 36" Min. depth while directional drilling
36" Min
Depth
Final Grade
TYPICAL BORE COVER
TYPICAL BORE NOTE
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2
BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT
DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY.
PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE
POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL
HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING
CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND
PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO
REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK
BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS
PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT
OF WAY
NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE
TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE
INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY
HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC
RIGHT OF WAY.
NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL
CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND
STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT
HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT
OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A
DIFFERENT MINIUM SEPARATION.
JOB SITE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
F. GOMEZ 206-573-0031 04/17/18
F. GOMEZ 206-573-0031 04/17/18
E. SCHOTT 714-893-2405 04/17/18
REQUIRED N/A
EDMONDS 563 LLC
(3) UG SVC
563 EDMONDS AVE NE RENTON, WA 98056
N/A N/A
N/A 10111749
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
SE 8-23N-05E N/A N/A
2305E032 2305E040 2305E032 HIG-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:FABIAN GOMEZ
206-573-0031
FABIAN.GOMEZ@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
504034734
505444206
104300308
108106148
10111749
Service
Superior 10111749SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2305E040
Owner / Developer Contact Info
officeATTN:
Edmonds 563 LLC
11206 SE 268th St
Kent, WA 98030
Scott Jepson 253-592-4299
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
0'
SQ FT
200A
15kW
80A
1.8%
3.0%
POTHOLE ALL EXISTING UTILITIES
MFP18002841