HomeMy WebLinkAboutP_Design_101112200_V1_180531NE 21ST ST UNION AVE NEROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROW318892-167114
100T
T80382 ROWROWROWROWROWROWROWWORK SITE
GAS
PHONE
CABLE TV
N/A N/A
N/A 593195794
N/A 108106380
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
OH Expense
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101112200N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
V. RABON 425-449-7422 05/04/18
S. FOX 714-893-2405 05/04/18
D. FIELDS 714-893-2405 05/04/18
N/A RENTON
PRE-14 CREW2, 4014 NE 21ST ST
REPLACE B/O POLE
4014 NE 21ST ST, RENTON, WA 98056
ASPLUNDH CONSTRUCTION CORP.
O-439287
101112200
AS NOTED 1/1
KING COUNTY FAC-SVC
NE 4-23N-05E
2305E013 2305E040 PRE-142305E013
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2305E040
11420547 101112200
SITE MAP
SCALE: 1" = 50'
CIRCUIT FEET ADDED: NONE
Owner / Developer Contact Info
officeATTN:
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES SITE SPECIFIC NOTES
P01 (318892-167114)
-REPLACE B/O 1957 40' LEANING POLE W/ 50' CL1 OR BETTER POLE
(6010.1000) PD501 AND DEEP SET.
-INSTALL 12kV 3Ø TERM, LI, UG FEED, (UTSU3L1) PER STD. 6043.1001
-REPLACE ANCHOR W/ SINGLE HELIX 10"(ANDH1) AND SET NEW
ANCHOR 2' EAST OF EXISTING ANCHOR PER STD. 6012.1000
-INSTALL DOWNGUYS 3/8" PRI (GYD3SA) & 3/8" NEUT. (GYD3SAN) PER
STD. 6013.0100
-TRANSFER ALL OTHER PSE EQUIPMENT TO NEW POLE AND TOP AT
LEVEL OF COMMUNICATIONS
-(JFN)TICKET FOR COMM TO TRANSFER THEIR FACILITIES
-INSTALL SW#T80382
THOMAS GUIDE
626 F5
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:VINCENT RABON
425-457-4055
VINCENT.RABON@PSE.COM
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
POLE TABLE (NEW)
Site #
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 318895-167114 50 1 2018 PSE Equip #
POLE TABLE (REMOVAL)
Site #
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 318892-167114 40 1 1957 PSE Equip #
9.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations,
compaction and restoration per this sketch and per PSE standards. A minimum protective
cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's
secondary voltage equipment. The customer will provide any and all shoring or they will side
slope the trench to 1:1.
2004 TERMINAL POLE UG-OH FEED
SCALE: NONE PER STD. 6043.1001