Loading...
HomeMy WebLinkAboutP_Design_101112200_V1_180531NE 21ST ST UNION AVE NEROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROW318892-167114 100T T80382 ROWROWROWROWROWROWROWWORK SITE GAS PHONE CABLE TV N/A N/A N/A 593195794 N/A 108106380 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service OH Expense Removal Temporary Job Order Distribution HP Main HP Svc/MSA PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101112200N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP V. RABON 425-449-7422 05/04/18 S. FOX 714-893-2405 05/04/18 D. FIELDS 714-893-2405 05/04/18 N/A RENTON PRE-14 CREW2, 4014 NE 21ST ST REPLACE B/O POLE 4014 NE 21ST ST, RENTON, WA 98056 ASPLUNDH CONSTRUCTION CORP. O-439287 101112200 AS NOTED 1/1 KING COUNTY FAC-SVC NE 4-23N-05E 2305E013 2305E040 PRE-142305E013 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#: 2305E040 11420547 101112200 SITE MAP SCALE: 1" = 50' CIRCUIT FEET ADDED: NONE Owner / Developer Contact Info officeATTN: 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES SITE SPECIFIC NOTES P01 (318892-167114) -REPLACE B/O 1957 40' LEANING POLE W/ 50' CL1 OR BETTER POLE (6010.1000) PD501 AND DEEP SET. -INSTALL 12kV 3Ø TERM, LI, UG FEED, (UTSU3L1) PER STD. 6043.1001 -REPLACE ANCHOR W/ SINGLE HELIX 10"(ANDH1) AND SET NEW ANCHOR 2' EAST OF EXISTING ANCHOR PER STD. 6012.1000 -INSTALL DOWNGUYS 3/8" PRI (GYD3SA) & 3/8" NEUT. (GYD3SAN) PER STD. 6013.0100 -TRANSFER ALL OTHER PSE EQUIPMENT TO NEW POLE AND TOP AT LEVEL OF COMMUNICATIONS -(JFN)TICKET FOR COMM TO TRANSFER THEIR FACILITIES -INSTALL SW#T80382 THOMAS GUIDE 626 F5 E-Mail: Cell Phone: Project Manager Contact Information: Manager:VINCENT RABON 425-457-4055 VINCENT.RABON@PSE.COM UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 318895-167114 50 1 2018 PSE Equip # POLE TABLE (REMOVAL) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 318892-167114 40 1 1957 PSE Equip # 9.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 2004 TERMINAL POLE UG-OH FEED SCALE: NONE PER STD. 6043.1001