Loading...
HomeMy WebLinkAboutP_Design_101112247_V1_183105318 310 304 300 1304 248 240 238 230 235 238 326 247 1211 1207 1201250 248 240 236 232235 247 301 315 249 J J J318061-166207 37.5 kVA 120/240V (C) 318061-166191 50 kVA 120/240V (C) 318061-166203 50 kVA 120/240V (C) 318061-166217 37.5 kVA 120/240V (C) N 3RD STPARK AVE NGARDEN AVE N318057-166223 318061-166233 50 kVA 120/240V (C) 318064-166224 X3470 X3470 SLAG7883 318073-166224 10 kVA 120/240V (A) SLAG7884 SLAG7885 318044-166223 UNK SLAG7882 318049-166178 UNK 318069-166179 25 kVA 120/240V (C) 318074-166174 318049-166178 UNK 318073-166214 500 kVA 120/208V 60'PCR 14 PCR 14 PCR 14 318064-166224 X3470 X3470 SLAG7883 J J J PROPOSED 10' EASEMENT PROPOSED 10' EASEMENT (3) 750KCMIL(1) 1/0 AL SOL 336.4KCMIL ACSRABC336.4KCMIL ACSRABC 00 1"2" 00 50'100' SITE PLAN N Vicinity Map N/A Owner / Developer Contact Info officeATTN: Renton School District #409 7812 S 124th ST Seattle, wA 98178 Matt Feldmeyer (425) 204-4475 SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 108106462 584043027 594120879 PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X E-Mail: Cell Phone: Project Manager Contact Information: Manager:Marc Bayley (253) 259-4494 Marcus.Bayley@PSE.com SCALE: 1" = 50' Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V01 318061-166217 37.5kVA 6247050 101112247THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Marc Bayley (253) 234-6432 5/4/18 Nate Linville (253) 970-7284 5/4/18 Nate Linville (253) 970-7284 Required City of Renton Sartori Elementary Relocation Remove (2) TUT, Install (2) PM Transformers 332 Park AVE N, Renton, WA 98056 101112247 As Noted 1 of 3 King CSPSKEPM NW-17-23N-05E 2305E066 2305E088 2305E066 GRA-17 101112247505910446 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: V03 318061-166203 50kVA 6247100 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V02 318061-166207 37.5kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage V04 318061-166191 50kVA AT J01: EXISTING 318057-166223 EXISTING VAULT TO REMAIN REMOVE EXISTING B/O 4POS JBUS ON (S) WALL [594120879 2-45] -INSTALL (1) NEW 4POS JBUS ON (S) WALL AT V01: NEW 318061-166217 - 101112242 -INSTALL (1) 36" X 42" X 38" UNI-STRUT MINI-PAD HAND HOLE PER STD 6045.1010 (MINU15S) [2-60] -INSTALL (1) 37.5kVA 120/240V 1Ø PM TRANSFORMER (MID: 6247050) [2-45] -INSTALL (2) LB ELBOWS PER STD 6041.1000 (ELB10J) [2-57 X2] -INSTALL (3) 5/8" STUD #6-350KCMIL 6POS SECONDARY CONNECTION BARS (MID: 4842001) -INSTALL GRID 318061-166217 TRANSFER CABLE #CØ-10159 FROM V02 -INSTALL CABLE #CØ-EHX807 AT HH1: NEW -INSTALL (1) 2'6" X 2'6" X 2' CONCRETE SECONDARY HAND HOLE W/ ANTI-SKID DOOR PER STD 6050.2000 (HH14350AS) [2-34] -INSTALL (3) #10-350KCMIL SECONDARY CONNECTION BLOCKS TRANSFER CABLE #CØ-10159 TO V01 AT V02: REMOVE 318061-166207 REMOVE EXISTING 37.5kVA 120/240V TUT AND RETURN TO PSE YARD [2-45] REMOVE EXISTING 4'8" X 4'8" X 6' VAULT [2-60] AT V03: NEW 318061-166203 -INSTALL (1) 36" X 42" X 38" UNI-STRUT MINI-PAD HAND HOLE PER STD 6045.1010 (MINU15S) [2-60] -INSTALL (1) 50kVA 120/240V 1Ø PM TRANSFORMER (MID: 6247100) [2-45] -INSTALL (1) LB ELBOW & (1) DUST CAP PER STD 6041.1000 (ELB10J) [2-57] -INSTALL (3) 5/8" STUD #6-350KCMIL 6POS SECONDARY CONNECTION BARS (MID: 4842001) -INSTALL GRID 318061-166203 AT HH3: NEW -INSTALL (1) 2'6" X 2'6" X 2' CONCRETE SECONDARY HAND HOLE W/ ANTI-SKID DOOR PER STD 6050.2000 (HH14350AS) [2-34] -INSTALL (3) #10-350KCMIL SECONDARY CONNECTION BLOCKS INTERCEPT EXISTING 3" CONDUIT, PLUMB FROM V03 TO NEW HAND HOLE INTERCEPT EXISTING UG SECONDARY TRPLEX TO HH4 AT V04: REMOVE 318061-166191 REMOVE EXISTING 37.5kVA 120/240V TUT AND RETURN TO PSE YARD [2-45] REMOVE EXISTING 4'8" X 4'8" X 6' VAULT [2-60] AT J02: EXISTING 318049-166178 EXISTING JBOX TO REMAIN REMOVE NEUTRAL TIE FROM V04 TO J02 SPAN NOTES IP1 & IP2 TO V01 INTERCEPT EXISTING 2" CONDUIT, PLUMB INTO V01 [2-36] STRIP BACK CABLE #CØ-10159 FROM V02 AND ROUTE TO V01 IP3 TO V01 INTERCEPT EXISTING 2" CONDUIT, PLUMB INTO V02 [2-36] IP4 TO HH2 INTERCEPT EXISTING 3" SECONDARY CONDUIT [2-36] REMOVE EXISTING 350KCMIL SECONDARY TPLX CABLE V01 TO HH1 -INSTALL (1) RUN 350KCMIL SEC TPLX ±70' _____' ACTUAL [2-54A] HH1 TO HH2 INSTALL (1) RUN 350KCMIL SEC TPLX ±80' _____' ACTUAL [2-54A] V02 TO HH1 REMOVE EXISTING (1) 350KCMIL SEC TPLX ±10' [2-54A] V03 TO HH2 -INSTALL (1) RUN 350KCMIL SEC TPLX ±50' _____' ACTUAL [2-54A] V04 TO HH2 REMOVE EXISTING (1) 350KCMIL SEC TPLX ±10' [2-54A] DEVELOPER & CUSTOMER NOTES: THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE 6' X 6' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT V01 & V03 -REQUIRED TO PROVIDE 6' X 6' WORK PIT FOR IP1& IP2, IP3, AND IP4 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION -RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING UNDERGROUND CIRCUIT MAP SCALE: NONE JOB SITE JOB SITE CIRCUIT FEET ADDED: 180 CIRCUIT FEET REMOVED: 200' 318061-166217 37.5kVA 120/240V 318061-166203 50kVA 120/240V EXISTING 2" CONDUIT EXISTING 2" CONDUIT 6' X 6' WORK PIT CUSTOMER PROVIDED 9' X 10' WORK PIT CUSTOMER PROVIDED 6' X 6' WORK PIT CUSTOMER PROVIDED 6' X 6' WORK PIT ±20'90° R=48"±20'90° R=48" 90° R=48"±20'318061-166217 37.5kVA 120/240V 318061-166203 50kVA 120/240V CØ-EHX803 318061-166217 37.5kVA 120/240V 318061-166203 50kVA 120/240V PSE PROVIDED & INSTALLED (1) NEW 1/0 AL SOL CØ-EHX803 EXISTING 1/0 AL SOL CØ-10159 PRIMARY CABLE ONE-LINE DIAGRAM SCALE: NONE 101112247UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Marc Bayley (253) 234-6432 5/4/18 Nate Linville (253) 970-7284 5/4/18 Nate Linville (253) 970-7284 Required City of Renton Sartori Elementary Relocation Remove (2) TUT, Install (2) PM Transformers 332 Park AVE N, Renton, WA 98056 101112247 As Noted 2 of 3 King CSPSKEPM NW-17-23N-05E 2305E066 2305E088 2305E066 GRA-17 UNDERGROUND CIRCUIT MAP (AFTER) SCALE: NONE PRIMARY CONDUIT DIAGRAM SCALE: NONE UNDERGROUND CIRCUIT MAP (before) SCALE: NONE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Foreman Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) J01 V01 2 1 EX 130 NEW 30 2 0 0 0 48 46 PRI 12KV 1/0 UG 160 10159 V01 V03 2 1 30 EXISTING 140' 2 0 0 0 33 33 PRI 12KV 1/0 UG 160 EHX807 ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE (LF) EST EXISTING CABLE MFG. NAME EXISTING CABLE MFG. DATE CABLE REPLACED?FROM TO 10159 10502898 IP1 V02 30' 10158 10502887 V02 V04 180 TOTAL 180' GUARD POSTS FOR PADMOUNT EQUIP. TYPICAL TRANSFORMER 0700.1600Not to scale 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX 3' MIN 8' x 8' OR 10' x 10' CONCRETE PAD GUARD POSTS ACCESS DOOR SWING 4' MIN 18' MIN 3' MIN CL CL 18' MIN COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' 318061-166217 37.5kVA 120/240V 318061-166203 50kVA 120/240V EXISTING (1) 3" CONDUIT CUSTOMER PROVIDED 6' X 6' WORK PIT CUSTOMER PROVIDED 6' X 6' WORK PIT CUSTOMER PROVIDED 6' X 6' WORK PIT 90° R=36" 45° R=36"±20'±70'±70'EXISTING (1) 3" CONDUIT PSE PROVIED (1) 3" SCH80 PVC CONDUIT PSE PROVIED (1) 3" SCH80 PVC CONDUIT CUSTOMER PROVIDED 6' X 6' WORK PIT ±50'±20'±40'90° R=36" 318061-166217 37.5kVA 120/240V 318061-166203 50kVA 120/240V ±20'90° R=36"45° R=36"±20'±70'±70'EXISTING (1) 350KCMIL SEC TPLX NEW (1) 350KCMIL SEC TPLX IN EXISTING 3" CONDUIT ±40' ±50' PSE PROVIDED (1) 350KCMIL SEC TPLX PSE PROVIDED NEW (1) 350KCMIL SEC TPLX 90° R=36" SECONDARY CONDUIT DIAGRAM SCALE: 1" = 50'101112247UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Marc Bayley (253) 234-6432 5/4/18 Nate Linville (253) 970-7284 5/4/18 Nate Linville (253) 970-7284 Required City of Renton Sartori Elementary Relocation Remove (2) TUT, Install (2) PM Transformers 332 Park AVE N, Renton, WA 98056 101112247 As Noted 3 of 3 King CSPSKEPM NW-17-23N-05E 2305E066 2305E088 2305E066 GRA-17 SECONDARY CABLE DIAGRAM SCALE: NONE TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts VAULT & EXCAVATION DETAIL AT V01 & V03 Not to scale 6045.1000 1950 lbs PROPOSED UG PRIMARY EXISTING UG PRIMARY PRIMARY SPLICES SPLICE PIT DETAIL IP1 & IP2 SCALE: NONE TO V03FROM J01 TO V01 SINGLE PHASE SECONDARY CONCRETE HANDHOLE AT HH1 & HH3 Not to scale 6050.2020-1 TOP VIEW SIDE VIEW 2'-4" EXCAVATION: 5-1/3 CUBIC YARDS 6'-0" 6'-0" 6" Crushed rock 2" 2'-6" Install PVC bell ends and grout into wall 2'-6" Handhole 820 lbs Conduits and conductors shall enter from ends of handhole through knockouts provided Typical customer run service conductors in duct Steel Door Seal conduit with foam Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be removed by customer or cut off at the vault wall. PROPOSED UG PRIMARY EXISTING UG PRIMARY PRIMARY SPLICES SPLICE PIT DETAIL IP3 SCALE: NONE FROM V01 TO V03