HomeMy WebLinkAboutP_Design_101112247_V1_183105318
310
304
300
1304
248
240
238
230
235
238 326
247
1211
1207
1201250
248
240
236
232235
247
301
315
249
J
J
J318061-166207
37.5 kVA 120/240V (C)
318061-166191
50 kVA 120/240V (C)
318061-166203
50 kVA 120/240V (C)
318061-166217
37.5 kVA 120/240V (C)
N 3RD STPARK AVE NGARDEN AVE N318057-166223 318061-166233
50 kVA 120/240V (C)
318064-166224
X3470
X3470
SLAG7883
318073-166224
10 kVA 120/240V (A)
SLAG7884
SLAG7885
318044-166223
UNK
SLAG7882
318049-166178
UNK
318069-166179
25 kVA 120/240V (C)
318074-166174
318049-166178
UNK
318073-166214
500 kVA 120/208V
60'PCR
14
PCR
14
PCR
14
318064-166224
X3470
X3470
SLAG7883
J
J
J PROPOSED
10' EASEMENT
PROPOSED
10' EASEMENT
(3) 750KCMIL(1) 1/0 AL SOL 336.4KCMIL ACSRABC336.4KCMIL ACSRABC
00 1"2"
00 50'100'
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Renton School District #409
7812 S 124th ST
Seattle, wA 98178
Matt Feldmeyer (425) 204-4475
SITE SPECIFIC NOTES
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
108106462
584043027
594120879
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Marc Bayley
(253) 259-4494
Marcus.Bayley@PSE.com
SCALE: 1" = 50'
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
318061-166217
37.5kVA
6247050
101112247THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Marc Bayley (253) 234-6432 5/4/18
Nate Linville (253) 970-7284 5/4/18
Nate Linville (253) 970-7284
Required City of Renton
Sartori Elementary Relocation
Remove (2) TUT, Install (2) PM Transformers
332 Park AVE N, Renton, WA 98056
101112247
As Noted 1 of 3
King CSPSKEPM
NW-17-23N-05E
2305E066 2305E088 2305E066 GRA-17
101112247505910446
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V03
318061-166203
50kVA
6247100
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V02
318061-166207
37.5kVA
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
V04
318061-166191
50kVA
AT J01: EXISTING 318057-166223
EXISTING VAULT TO REMAIN
REMOVE EXISTING B/O 4POS JBUS ON (S) WALL [594120879 2-45]
-INSTALL (1) NEW 4POS JBUS ON (S) WALL
AT V01: NEW 318061-166217 - 101112242
-INSTALL (1) 36" X 42" X 38" UNI-STRUT MINI-PAD HAND HOLE PER STD 6045.1010 (MINU15S) [2-60]
-INSTALL (1) 37.5kVA 120/240V 1Ø PM TRANSFORMER (MID: 6247050) [2-45]
-INSTALL (2) LB ELBOWS PER STD 6041.1000 (ELB10J) [2-57 X2]
-INSTALL (3) 5/8" STUD #6-350KCMIL 6POS SECONDARY CONNECTION BARS (MID: 4842001)
-INSTALL GRID 318061-166217
TRANSFER CABLE #CØ-10159 FROM V02
-INSTALL CABLE #CØ-EHX807
AT HH1: NEW
-INSTALL (1) 2'6" X 2'6" X 2' CONCRETE SECONDARY HAND HOLE W/ ANTI-SKID DOOR PER STD 6050.2000 (HH14350AS) [2-34]
-INSTALL (3) #10-350KCMIL SECONDARY CONNECTION BLOCKS
TRANSFER CABLE #CØ-10159 TO V01
AT V02: REMOVE 318061-166207
REMOVE EXISTING 37.5kVA 120/240V TUT AND RETURN TO PSE YARD [2-45]
REMOVE EXISTING 4'8" X 4'8" X 6' VAULT [2-60]
AT V03: NEW 318061-166203
-INSTALL (1) 36" X 42" X 38" UNI-STRUT MINI-PAD HAND HOLE PER STD 6045.1010 (MINU15S) [2-60]
-INSTALL (1) 50kVA 120/240V 1Ø PM TRANSFORMER (MID: 6247100) [2-45]
-INSTALL (1) LB ELBOW & (1) DUST CAP PER STD 6041.1000 (ELB10J) [2-57]
-INSTALL (3) 5/8" STUD #6-350KCMIL 6POS SECONDARY CONNECTION BARS (MID: 4842001)
-INSTALL GRID 318061-166203
AT HH3: NEW
-INSTALL (1) 2'6" X 2'6" X 2' CONCRETE SECONDARY HAND HOLE W/ ANTI-SKID DOOR PER STD 6050.2000 (HH14350AS) [2-34]
-INSTALL (3) #10-350KCMIL SECONDARY CONNECTION BLOCKS
INTERCEPT EXISTING 3" CONDUIT, PLUMB FROM V03 TO NEW HAND HOLE
INTERCEPT EXISTING UG SECONDARY TRPLEX TO HH4
AT V04: REMOVE 318061-166191
REMOVE EXISTING 37.5kVA 120/240V TUT AND RETURN TO PSE YARD [2-45]
REMOVE EXISTING 4'8" X 4'8" X 6' VAULT [2-60]
AT J02: EXISTING 318049-166178
EXISTING JBOX TO REMAIN
REMOVE NEUTRAL TIE FROM V04 TO J02
SPAN NOTES
IP1 & IP2 TO V01
INTERCEPT EXISTING 2" CONDUIT, PLUMB INTO V01 [2-36]
STRIP BACK CABLE #CØ-10159 FROM V02 AND ROUTE TO V01
IP3 TO V01
INTERCEPT EXISTING 2" CONDUIT, PLUMB INTO V02 [2-36]
IP4 TO HH2
INTERCEPT EXISTING 3" SECONDARY CONDUIT [2-36]
REMOVE EXISTING 350KCMIL SECONDARY TPLX CABLE
V01 TO HH1
-INSTALL (1) RUN 350KCMIL SEC TPLX ±70' _____' ACTUAL [2-54A]
HH1 TO HH2
INSTALL (1) RUN 350KCMIL SEC TPLX ±80' _____' ACTUAL [2-54A]
V02 TO HH1
REMOVE EXISTING (1) 350KCMIL SEC TPLX ±10' [2-54A]
V03 TO HH2
-INSTALL (1) RUN 350KCMIL SEC TPLX ±50' _____' ACTUAL [2-54A]
V04 TO HH2
REMOVE EXISTING (1) 350KCMIL SEC TPLX ±10' [2-54A]
DEVELOPER & CUSTOMER NOTES:
THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE 6' X 6' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT V01 & V03
-REQUIRED TO PROVIDE 6' X 6' WORK PIT FOR IP1& IP2, IP3, AND IP4
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL
TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
-RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING
UNDERGROUND CIRCUIT MAP
SCALE: NONE
JOB
SITE
JOB
SITE
CIRCUIT FEET ADDED: 180
CIRCUIT FEET REMOVED: 200'
318061-166217
37.5kVA 120/240V
318061-166203
50kVA 120/240V
EXISTING
2" CONDUIT
EXISTING
2" CONDUIT
6' X 6' WORK PIT
CUSTOMER PROVIDED
9' X 10' WORK PIT
CUSTOMER PROVIDED
6' X 6' WORK PIT
CUSTOMER PROVIDED
6' X 6' WORK PIT
±20'90°
R=48"±20'90°
R=48"
90°
R=48"±20'318061-166217
37.5kVA 120/240V
318061-166203
50kVA 120/240V CØ-EHX803
318061-166217
37.5kVA 120/240V
318061-166203
50kVA 120/240V
PSE PROVIDED & INSTALLED
(1) NEW 1/0 AL SOL
CØ-EHX803
EXISTING 1/0 AL SOL
CØ-10159
PRIMARY CABLE ONE-LINE DIAGRAM
SCALE: NONE
101112247UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Marc Bayley (253) 234-6432 5/4/18
Nate Linville (253) 970-7284 5/4/18
Nate Linville (253) 970-7284
Required City of Renton
Sartori Elementary Relocation
Remove (2) TUT, Install (2) PM Transformers
332 Park AVE N, Renton, WA 98056
101112247
As Noted 2 of 3
King CSPSKEPM
NW-17-23N-05E
2305E066 2305E088 2305E066 GRA-17
UNDERGROUND CIRCUIT MAP (AFTER)
SCALE: NONE
PRIMARY CONDUIT DIAGRAM
SCALE: NONE
UNDERGROUND CIRCUIT MAP (before)
SCALE: NONE
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT PRIMARY CABLE
ASBUILT INFORMATION
SIZE Qty LENGTH
Design
(ft)
BENDS PULL PULL Cable LENGTH
Design
(ft)
Cable Numbers Foreman Please Record Foreman - Complete
FROM TO (in)90°45°22°11°(lbs)
Rev
(lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable)
J01 V01 2 1 EX 130
NEW 30 2 0 0 0 48 46 PRI 12KV
1/0 UG 160
10159
V01 V03 2 1
30
EXISTING
140'
2 0 0 0 33 33 PRI 12KV
1/0 UG 160
EHX807
ABANDONED / REMOVE / REPLACED CABLE SCHEDULE
CABLE
NO.
SAP
EQUIP
LOCATIONS CABLE
(LF) EST
EXISTING CABLE
MFG. NAME
EXISTING CABLE
MFG. DATE
CABLE
REPLACED?FROM TO
10159 10502898 IP1 V02 30'
10158 10502887 V02 V04 180
TOTAL 180'
GUARD POSTS FOR PADMOUNT EQUIP.
TYPICAL
TRANSFORMER
0700.1600Not to scale
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
5'
MAX
3'
MIN
8' x 8' OR 10' x 10'
CONCRETE PAD
GUARD POSTS
ACCESS DOOR SWING
4'
MIN
18'
MIN
3'
MIN
CL
CL
18'
MIN
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
6775.0035 Not to scale
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200 MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
318061-166217
37.5kVA 120/240V
318061-166203
50kVA 120/240V
EXISTING
(1) 3" CONDUIT
CUSTOMER PROVIDED
6' X 6' WORK PIT
CUSTOMER PROVIDED
6' X 6' WORK PIT
CUSTOMER PROVIDED
6' X 6' WORK PIT
90°
R=36"
45°
R=36"±20'±70'±70'EXISTING
(1) 3" CONDUIT
PSE PROVIED
(1) 3" SCH80 PVC CONDUIT
PSE PROVIED
(1) 3" SCH80 PVC CONDUIT
CUSTOMER PROVIDED
6' X 6' WORK PIT
±50'±20'±40'90°
R=36"
318061-166217
37.5kVA 120/240V
318061-166203
50kVA 120/240V
±20'90°
R=36"45°
R=36"±20'±70'±70'EXISTING
(1) 350KCMIL SEC TPLX
NEW
(1) 350KCMIL SEC TPLX
IN EXISTING 3" CONDUIT
±40'
±50'
PSE PROVIDED
(1) 350KCMIL SEC TPLX
PSE PROVIDED NEW
(1) 350KCMIL SEC TPLX
90°
R=36"
SECONDARY CONDUIT DIAGRAM
SCALE: 1" = 50'101112247UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Marc Bayley (253) 234-6432 5/4/18
Nate Linville (253) 970-7284 5/4/18
Nate Linville (253) 970-7284
Required City of Renton
Sartori Elementary Relocation
Remove (2) TUT, Install (2) PM Transformers
332 Park AVE N, Renton, WA 98056
101112247
As Noted 3 of 3
King CSPSKEPM
NW-17-23N-05E
2305E066 2305E088 2305E066 GRA-17
SECONDARY CABLE DIAGRAM
SCALE: NONE
TOP VIEW
SIDE VIEW
EXCAVATION: 4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
VAULT & EXCAVATION DETAIL AT V01 & V03
Not to scale 6045.1000
1950 lbs
PROPOSED UG PRIMARY
EXISTING UG PRIMARY
PRIMARY SPLICES
SPLICE PIT DETAIL IP1 & IP2
SCALE: NONE
TO V03FROM J01
TO V01
SINGLE PHASE SECONDARY CONCRETE HANDHOLE AT HH1 & HH3
Not to scale 6050.2020-1
TOP VIEW
SIDE VIEW
2'-4"
EXCAVATION: 5-1/3 CUBIC YARDS
6'-0"
6'-0"
6" Crushed rock
2"
2'-6"
Install PVC bell ends
and grout into wall
2'-6"
Handhole
820 lbs
Conduits and conductors shall enter from
ends of handhole through knockouts provided
Typical customer run
service conductors in duct
Steel Door
Seal conduit
with foam
Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on
the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be
removed by customer or cut off at the vault wall.
PROPOSED UG PRIMARY
EXISTING UG PRIMARY
PRIMARY SPLICES
SPLICE PIT DETAIL IP3
SCALE: NONE
FROM V01
TO V03