HomeMy WebLinkAboutP_Design_186051620_V1_180531Z
W
I Q I
Z
Q
Ur 318261-166056
r is O l6kVA 24
It�J/ J 15kVA 1201240v
(186041909)
111022039
24 ( ) 318261-166072
t5kVA 1201240v 100T
318260 166044 v' 318261-166067 Z X739 z 318260-166101
3975 MCMAAC m „ 318261.166083 78021122
-16603 S4/19W .... -'......
_._._._._......................` +roAcsR
R x97.5 MCMAAC I ._ _ _._._._._._._._._._._._._._._._
31826J66049 veo
®IN 6TH ST
N 6TH ST
"TREE T7MMING REQUIRED
I i �
31825516605 Qp
31 255;-166057
3162ss 16so 318250
I
P01
I 166069
'546' z
Z Z 53911 W a
W W >
Ia
I<C, i Q W " 536 537 Q
O z
J
J
� 532 a
I m 3182 6 100kVA
1�P02 166068 120/240v
530 529
PCR
24
6
I _ 0 527
0 1.
524 - -0 318226-166084
50kVA 120/240v
520 ( (101082336)
523
�15WA
221-166070 %
12120/240v iSITE PLAN 5'6 519
SCALE: 1:100
SITE SPECIFIC NOTES
P01: 318250-166069(TREE TRIMMING)
- EXTEND 3" SEC RISER TO NEUTRAL HEIGHT (APPROX. 2')
- REMOVE SPOOL RACK AND REPLACE WITH RIGID CLEVIS, 6015.1000 (INDNRC)
- INSTALL STREET LIGHT SERVICE MOLDING
P02: 318236-166068 (POLE IN SIDEWALK)
- INSTALL 45'
CL -2 OR BETTER POLE W/
GROUNDS, 6010.1000 (PD453)
- INSTALL 30 TANGENT PTP #2ACSR, 6033.1010 (TAN312)
- INSTALL NEW 3" SECONDARY RISER, 6042.1000 (RIS3CSS)
- TRANSFER 100kVA 120/240v OH XFMR & CUTOUT
- TRANSFER OH TRIPLEX
- TRANSFER & EXTEND UG SEC WIRES IN NEW 3" RISER
- REMOVE SPOOL RACK
- COMMS TO TRANSFER THEIR OWN WIRES
- REMOVE & RETIRE 40' CL -1 1959 POLE
POLE TABLE (NEW)
Site
Pole Data
#
Grid #
Height
Class
Year
Remarks / Location Ref.
P02
318236-166068
45
2
GRID #
HEIGHT
POLE RETIREMENT TABLE
TEMP TRANSFERS
ST. LIGHT TRANSFERS
SITE
#
POLE DATA
POLE
TEL
TV
FIBER
TRAN
RMVD
ID NUMBER
GRID #
HEIGHT
CLASS
YEAR
TOPPED
RMVD
P02
318236-166068
40
1
1959
1:1
E:1
D
E
E]
1:1
E]
100T
May L4, LU1 b — b:SUam X:\#Quanta_ _ are terra Vega
ULOI,aa \ 5
Wg
TRANSFORMER TRANSFER
New pole at site: P02
Grid Number: 318236-166068
kVA Rating: 100kVA 120/240v
Foreman to redline the following information
Company ID#:
Primary phase connected to:
Tested Secondary Voltage /
POWER GENERAL NOTES
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work
sketch must be AUTHORIZED
b Pot
y elco's Project Manager and NOTED on the Foremans Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three
1 9
(3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work
to get the underground facilities located.
4. All work is to be done in accordance with local municipal and county permit requirements as applicable.
5. Inclement weather conditions may cause delays in construction times and dates.
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
lb
CSD JOB SITE
Pill
1�
t �25 05
CK00422 CK0 42 LW
NEST
CK00421
Q
3 = 257 BIIJUI" 4� C
0
' .3�, NE 10 ST • S X0584 PCR X5825 B C•• • CD I� ,"NE 9 PL1
U3283 657 A I wN�
3� U3284� •B ........ _NE 9 ST 25T C
'3� 30•' B:' X9673 —;"-
U3286 OOT X5824 405 N�
X30 30 U3285: , 3� 100T 407 407 ----i
S S a�;c 30,: 6� Y
'S . 2 B NE• e .6
• U3287 X9673 c`�" oa"� 125 ST 15TI B
• .B 100T
30 :30
L�
Ln
X X 9C1 I� c�iT
30 CD LnLO
C 9�>7, mss•
rn : -Ln CO U0127 s B
0
�'MxX 759 s�
cfl —
6
X739S
X541
ST
RENTGW
101112561
]33
STAD/UM/X401'
000
o
CITY OF RENTON
o
IN �1
•
U758
.30 r. •
X
B 100
- 5
- T
X1164
ST
'
N n �F-
IN�n1
F-�
00
3 = 257 BIIJUI" 4� C
0
' .3�, NE 10 ST • S X0584 PCR X5825 B C•• • CD I� ,"NE 9 PL1
U3283 657 A I wN�
3� U3284� •B ........ _NE 9 ST 25T C
'3� 30•' B:' X9673 —;"-
U3286 OOT X5824 405 N�
X30 30 U3285: , 3� 100T 407 407 ----i
S S a�;c 30,: 6� Y
'S . 2 B NE• e .6
• U3287 X9673 c`�" oa"� 125 ST 15TI B
• .B 100T
30 :30
L�
Ln
X X 9C1 I� c�iT
30 CD LnLO
C 9�>7, mss•
rn : -Ln CO U0127 s B
0
�'MxX 759 s�
cfl —
6
X739S
NOTIF# ORDER#
ST
1 00Ll I00
101112561
a'
14
IN •II �I
000
o
CITY OF RENTON
o
IN �1
•
U758
FUNCTION CONTACT
X
S
- 5
- T
rn
N
ST
'
N n �F-
IN�n1
F-�
00
4 30
�29cO f U, �I
C .I
...............
�.
X806
...
,x4o10 N A,; )6239
100
>i IB 1 NN 1
:�•�••A�yc
100T
L_�
J7A
COUNTY
Emer Sect Gas Wk Ctr POWER WK CTR
T
0
30:"
UH ISI KI I IM AF': 23U5EU40
SCALE 6" = 1 MILE
0318
:30
- PCR
13
IU756
100T:
T76249:
LO •3
X9973 XC'78 /I/E s5 OX8
X5435 a 25
251 '--4— 2571
HIG c 25Tj�a,�•, Bye
16'40T
6 "I 5T ` — — I
l
c _ 407 157
65T V 25T
405 loo X103591
1 1�
c
C)
�'40T l i 3
rn
A -IJ x *4 25i 1,
N }h0k
u I UUL 157
ST :X9� L
BiX5 7 ��. •7pot 30. � qs
••..:
:C� o� 65 A'B':B 30 : Z
ENGR-1: # 119230
PROJECT PHASE
NOTIF# ORDER#
PWR Superior
Install
Removal
ExDense
505885152 186051620
101112561
108106693
Developer Yes Yes x PSE
"Locates Required" No x No
"Outariaq Rannirari" V„_
VICINITY MAP
Yes X No
KEAL ESTATE/EASEMENT
PERMIT
N/A
CITY OF RENTON
W
FUNCTION CONTACT
PHONE NO
DATE
2
PROJECT MGR S. VEGA
253-234-6130
05/14/18
1
ENGR - POWER S. VEGA
D
05/14/18
REV# DATE
BY
DESCRIPTION
ENGR - GAS N/A
-`4
N/A
COUNTY
Emer Sect Gas Wk Ctr POWER WK CTR
DRAWN BY V. ALFARO
JOB SITE;
s`
_545 - ? 2
Q
N/A
N/A QCSOKE
CHECKED BY
_,_-
1/4 SEC
OP MAP
PLAT MAP
APPROVED BY -
5 2 48
T23, R05E, SW 08
N/A
N/A
FOREMAN #1
U -MAP NO (POWER)
OH CKT MAP
I UG CKT MAP
CIRCUIT NO
FOREMAN #2
2305EO31
2305E040
2305EO31
I PCR -24 IMAPPING
546Burnett'
4: T ':E"
JOINT FACILITIES ARRANGEMENTS
venue Nontt_
W
N,/A N/A
N/A
N/A
CONTACT
NIA N/A
N/A
N/A
O
NIA N/A
N/A
N/A
PUGETBURNETT
SOUND
AVE N
RENTON
INCIDENT
NIA
MA
N/A
REPLACE DISTRIBUTION POLE,
Gas Order Elect
Order
ENERGY
SECONDARY WORK
R
546 BURNETT AVE N RENTON, WA 98057
DESIGNED BY POTELCO
SCALE
PAGE
AS NOTED
1/1
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LINED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location, on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Deviations noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name Date
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
"Flagging Required"
Yes X No
KEAL ESTATE/EASEMENT
PERMIT
N/A
CITY OF RENTON
3
FUNCTION CONTACT
PHONE NO
DATE
2
PROJECT MGR S. VEGA
253-234-6130
05/14/18
1
ENGR - POWER S. VEGA
253-234-6130
05/14/18
REV# DATE
BY
DESCRIPTION
ENGR - GAS N/A
N/A
N/A
COUNTY
Emer Sect Gas Wk Ctr POWER WK CTR
DRAWN BY V. ALFARO
253-841-6252
05/14/18
KING
N/A
N/A QCSOKE
CHECKED BY
1/4 SEC
OP MAP
PLAT MAP
APPROVED BY -
5 2 48
T23, R05E, SW 08
N/A
N/A
FOREMAN #1
U -MAP NO (POWER)
OH CKT MAP
I UG CKT MAP
CIRCUIT NO
FOREMAN #2
2305EO31
2305E040
2305EO31
I PCR -24 IMAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
N,/A N/A
N/A
N/A
CONTACT
NIA N/A
N/A
N/A
PHONE#
NIA N/A
N/A
N/A
PUGETBURNETT
SOUND
AVE N
RENTON
INCIDENT
NIA
MA
N/A
REPLACE DISTRIBUTION POLE,
Gas Order Elect
Order
ENERGY
SECONDARY WORK
N/A 186051620
546 BURNETT AVE N RENTON, WA 98057
DESIGNED BY POTELCO
SCALE
PAGE
AS NOTED
1/1