HomeMy WebLinkAboutP_Design_101112584_V1_180605954953957
961
903
909
915
921
4905
4911
5002 5008
5007
5001
5000
5006
5013
5014
318448-167419
25 kVA 120/240V (B)
37.5 kVA 120/240V (A)
X6696
X6696
X6696
318454-167435
25 kVA 120/240V (B)
927
JOB SITE
-CUSTOMER TO PROVIDE 4'X4'
WORK PIT & 3/4 YARD OF SAND
-CUSTOMER TO PROVIDE 4'X4'
WORK PIT & 3/4 YARD OF SAND
-CUSTOMER TO BORE AND
INSTALL 1-3" SCH'L 80
DISCONTINUOUS CONDUIT, ±160'
-PSE TO INSTALL 1-RUN OF
350KCMIL UG TPX, ±170'
-CUSTOMER TO INSTALL 1-3"
SCH'L 80 DISCONTINUOUS
CONDUIT, ±10'
-PSE TO INSTALL 1-RUN OF
350KCMIL UG TPX, ±45'
±90'
±40'
±30'90°
R=48"
90°
R=48"
JOB SITE
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
Owner / Developer Contact Info
officeATTN:
GRACE LIAO
921 GRAHAM AVE NE
RENTON WA 98059
GRACE LIAO 425-395-6639
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILESCALE: NONE
CABLE & CONDUIT ONE-LINE DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
2018
342 370 353
-2.34 -
3.42 372.34 353
Removal
Perm. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
104304592505807137
583059509
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:FABIAN GOMEZ
206-573-0031
FABIAN.GOMEZ@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
318448-167419
37.5KVA
6211300
SCALE: 1" = 50'101112584THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101112584
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
FABIAN GOMEZ 206-573-0031 5/18/18
FABIAN GOMEZ 206-573-0031 5/18/18
N/A N/A N/A
TIN NGUYEN 253-244-4303 5/18/18
REQUIRED RENTON
927 GRAHAM AVE NE
UG SVC W/ OH TRF UPGRADE & HH INST
927 GRAHAM AVE NE, RENTON WA 98059
N/A N/A
N/A 101112584
AS NOTED 1/1
KING N/A N/A CSPSKEIN
NE 10-23N-05E N/A N/A
2305E037 2305E040 2305E037 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
11423305
SITE SPECIFIC NOTES
P01 (318448-167419):
-EXISTING DISTRIBUTION POLE TO REMAIN.
-REMOVE EXISTING 25KVA 120/240V OH TRF
-INSTALL 37.5KVA 120/240V OH TRF W/ L/B & C/O FUSE @15T
-USE EXISTING 3" CONDUIT RISER TO INSTALL 350KCMIL UG CABLE TO HH1
-REMOVE EXISTING 2" SECONDARY CONDUIT RISER
HH1:
-INSTALL 17"X30" SECONDARY HAND HOLE STD 6050.2000(HH16350)
-INSTALL 3-6 POS #10-350 KCMIL CONNECTION BARS (7651006)
-TRANSFER EXISTING UG SVC TO HAND HOLE, "903", "909"
M01:
-INSTALL 200A METER
Customer's
service
conductors
Captive L-Bolt
27-1/4"
2"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"
Conductors enter from
beneath and shall be
folded back with handhole
SIDE VIEW
Lock Cover
30"
Approx
Approx
17"
Set handhole flush
to final grade
SINGLE PHASE SECONDARY HANDHOLE
Not to scale 6050.2000
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
-BORE FROM HH1 TO PROPERTY LINE
VAULTS & WORK PITS.
-PROVIDE A 6' X 6' WORK PIT AT HH1.
-PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M01.
TRENCHING & CONDUIT.
-INSTALL ±170' OF 1-3" SCH'L 80 GREY PVC DISCONTINUOUS CONDUIT FROM HH1 TO M01 .
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
CONDUIT VOLTAGE
DROP
VOLTAGE
FLICKER ASBUILT INFORMATION
SIZE LENGTH
Design
(ft)
SIZE LENGTH
Design
(ft)
BENDS
Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
P01 HH1 350 45
3" SCH'L
80 10 1.9 2.5
HH1 M01 350 170
3" SCH'L
80 160 2 2.6 3.9
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
318448-167419
25KVA
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Conduit
EndsClosed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
Field Face
Quadrant
Road Face
Quadrant
Climbing
Space
5" Min
CL Direction of Vehicular TrafficCL
TOP VIEW
CONDUIT RISER PLACEMENT DETAIL (P01)
SCALE: NONE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
4000 SQ.
200 AMPS
ELECTRIC
16 KW
140 A
1.6%
3.9%
CIRCUIT FEET ADDED: 0'
SCHEDULE: 17