Loading...
HomeMy WebLinkAboutP_Design_101112584_V1_180605954953957 961 903 909 915 921 4905 4911 5002 5008 5007 5001 5000 5006 5013 5014 318448-167419 25 kVA 120/240V (B) 37.5 kVA 120/240V (A) X6696 X6696 X6696 318454-167435 25 kVA 120/240V (B) 927 JOB SITE -CUSTOMER TO PROVIDE 4'X4' WORK PIT & 3/4 YARD OF SAND -CUSTOMER TO PROVIDE 4'X4' WORK PIT & 3/4 YARD OF SAND -CUSTOMER TO BORE AND INSTALL 1-3" SCH'L 80 DISCONTINUOUS CONDUIT, ±160' -PSE TO INSTALL 1-RUN OF 350KCMIL UG TPX, ±170' -CUSTOMER TO INSTALL 1-3" SCH'L 80 DISCONTINUOUS CONDUIT, ±10' -PSE TO INSTALL 1-RUN OF 350KCMIL UG TPX, ±45' ±90' ±40' ±30'90° R=48" 90° R=48" JOB SITE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map Owner / Developer Contact Info officeATTN: GRACE LIAO 921 GRAHAM AVE NE RENTON WA 98059 GRACE LIAO 425-395-6639 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILESCALE: NONE CABLE & CONDUIT ONE-LINE DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 2018 342 370 353 -2.34 - 3.42 372.34 353 Removal Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE 104304592505807137 583059509 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:FABIAN GOMEZ 206-573-0031 FABIAN.GOMEZ@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P01 318448-167419 37.5KVA 6211300 SCALE: 1" = 50'101112584THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101112584 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP FABIAN GOMEZ 206-573-0031 5/18/18 FABIAN GOMEZ 206-573-0031 5/18/18 N/A N/A N/A TIN NGUYEN 253-244-4303 5/18/18 REQUIRED RENTON 927 GRAHAM AVE NE UG SVC W/ OH TRF UPGRADE & HH INST 927 GRAHAM AVE NE, RENTON WA 98059 N/A N/A N/A 101112584 AS NOTED 1/1 KING N/A N/A CSPSKEIN NE 10-23N-05E N/A N/A 2305E037 2305E040 2305E037 PRE-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 11423305 SITE SPECIFIC NOTES P01 (318448-167419): -EXISTING DISTRIBUTION POLE TO REMAIN. -REMOVE EXISTING 25KVA 120/240V OH TRF -INSTALL 37.5KVA 120/240V OH TRF W/ L/B & C/O FUSE @15T -USE EXISTING 3" CONDUIT RISER TO INSTALL 350KCMIL UG CABLE TO HH1 -REMOVE EXISTING 2" SECONDARY CONDUIT RISER HH1: -INSTALL 17"X30" SECONDARY HAND HOLE STD 6050.2000(HH16350) -INSTALL 3-6 POS #10-350 KCMIL CONNECTION BARS (7651006) -TRANSFER EXISTING UG SVC TO HAND HOLE, "903", "909" M01: -INSTALL 200A METER Customer's service conductors Captive L-Bolt 27-1/4" 2" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2" Conductors enter from beneath and shall be folded back with handhole SIDE VIEW Lock Cover 30" Approx Approx 17" Set handhole flush to final grade SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. -BORE FROM HH1 TO PROPERTY LINE VAULTS & WORK PITS. -PROVIDE A 6' X 6' WORK PIT AT HH1. -PROVIDE A 4' X 4' WORK PIT & 3/4 YARD OF SAND AT M01. TRENCHING & CONDUIT. -INSTALL ±170' OF 1-3" SCH'L 80 GREY PVC DISCONTINUOUS CONDUIT FROM HH1 TO M01 . -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed Lot Corner CONDUIT VOLTAGE DROP VOLTAGE FLICKER ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) P01 HH1 350 45 3" SCH'L 80 10 1.9 2.5 HH1 M01 350 170 3" SCH'L 80 160 2 2.6 3.9 Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 318448-167419 25KVA FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 METER DETAIL @ M01 SCALE: NONE 32" Typical 24" Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36" Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas Meter Assembly 48" 4'8" Service (Permanent Detail:) Not to Scale Conduit EndsClosed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CL Direction of Vehicular TrafficCL TOP VIEW CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 4000 SQ. 200 AMPS ELECTRIC 16 KW 140 A 1.6% 3.9% CIRCUIT FEET ADDED: 0' SCHEDULE: 17