HomeMy WebLinkAboutMFP18003203DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18003203
IVR Number: 18003203
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :06/12/2018Application Date:2423049123Parcel Number:1201 MONSTER RD SW
Permit Type:09/27/2018Issue Date:Franchise
Permit Work Class:09/27/2019Expiration Date:Minor Utility
Job Number:186049280Franchise Type:Electric
Description:Crew to wreck out 1 span of transmission, raise distribution and top 2 poles. Crew requesting City allow for 2 ten hour
workdays. Reader Board required 2 weeks prior to start of work. Restoration per City of Renton standards.
PRE CONSTRUCTION MEETING AT CITY HALL REQUIRED
APPROVED WITH COMMENTS OR REDLINES
ANY AFTER HOURS INSPECTIONS WILL BE BILLED AT $75/HR
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
186049280
Anish Kumar
253-208-2183
anish.kumar@pse.com
1201 Monster Ave SW 98057 186049280
Crew to wreck out 1 span of transmission, raise distribution and top 2 poles.
Crew requesting City allow (2) ten hour workdays. No pavement cuts anticipated. Restoration
per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
8/21/2018
Scott Warlick 9/5/2018
MFP18003203
Justin Johnson 9-10-2018
pre-construction meeting at city hall required. applicant will notify all affected
property owners prior to construction.
Reader Board required 2 weeks Prior
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
186049280
PSE/Potelco Inc.
Sierra Vega 253-327-3162
6905 S 228th St, Kent, WA 98032
sierra.vega@pse.com
1201 Monster Ave SW
TBD
10/8/18
Anish Kumar 8/21/2018
MFP18003203
Justin Johnson
9-24-2018
8:00 am to 6:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
1111M
O
N
S
T
E
R
R
D
S
W
PV
T
R
D
PO1
PO2
PO3
OA
K
E
S
D
A
L
E
A
V
E
S
W
MONSTER RD SWLONGA
C
R
E
S
D
R
S
W
J
A
C
K
S
O
N
P
L
S
W
11
11MONSTER RD SWSTREE
T
CLOSE
D
R11-2
BARRICADE
R11-2
STREET
CLOSED
R11-2
BARRICADE
R11-2
R11-4R5-133ROAD CLOSEDTOTHRU TRAFFICLOCALACCESSONLYR11-4R5-133ROAD CLOSEDTOTHRU TRAFFICLOCALACCESSONLYSTOP
FLAGGER
ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7A1
0
0
'
1
0
0
'
1
0
0
'
DET
O
U
R
AH
E
A
D
W20-2RO
A
D
CLO
S
E
D
AHE
A
D
W20-3100'100'DETOURAHEADW20-2ROADCLOSEDAHEADW20-3100'100'DETOURAHEADW2
0
-
2ROADCLOSEDAHEADW2
0
-
3
100
'
100
'DETOURAHEADW20-2ROADCLOSEDAHEADW20-3100
'
100
'DETOURM4-
9
D
E
T
O
U
R
M4-9WORKING
AREA DETOURM4-
9
DETOURDETOURM9-4RDETOURM9-4RD
E
T
O
U
R
M4-9M9-4R
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Job#186049280
1201 MONSTER AVE SW, RENTON, WA
1/30/2018
Sheet 1 of 1 Eduard.Volianskiy@pse.com
(425) 4246428
N
PSE PUGET
SOUND
ENERGY
PRINT ON
11X17" SHEETS ONLY
BORE PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Tacoma standards.
2. All sidewalks, driveways, exits and egresses shall be
completely clear unless otherwise indicated.
3. Contact Pierce County Transit @ 253-581-8130 for other
restrictions.
4. Channelizing devices are 28" traffic cones unless
otherwise specified.
5. Sign size can be a minimum of 48" x 48" and shall not
obstruct pedestrian access.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
8. All pavement restoration to be executed to City of Tacoma
Standards.
PSE
Traffic Control Supervisor:
Eduard Volianskyi
Card No. 010041
Card Exp. 11/30/2019
Eduard.Volianskyi@pse.com
(425) 4246428
DETOUR MAP
MFP18003203
Reader
Board
required 2
weeks Prior
Reader
Board
required 2
weeks Prior
MFP18003203
08/15/2018
Renton City Hall
1055 S. Grady Way
Renton, WA 98057
PSE WO# 186049280
To Whom It May Concern,
The scope of work relating to the permitting application for WO #186049280 is to remove overhead
transmission wires and to raise existing distribution wires between two existing PSE poles. This will
allow the PSE overhead conductors between P01 and P02 to cross over the driveway and roadway safely.
Please contact me if you have any questions or need additional information.
Sincerely,
Sierra Vega
Project Manager
Ph: 253-234-6130
Em: Sierra.vega@pse.com
MFP18003203