HomeMy WebLinkAboutP_Design_V2_186049280_V1_180821V�
3
v
Z
g
EL0
00
N
rn
4-
0
t0
00
0
U
O
41
U')
O
Z
0
Z
w
ry
Y
Z
J
0
0
00
N
rn
0
c0
0D
i
0
cV
0
rn
v
L
a�
(n
1-11Z
LL
/
v
`o
s
I
1n
D-
0
41
C
0
0
0
X
E
0
12
1
00
0
cV
a
Q
317461465128
22RVA 27714MV
317460-165142
2WVA 12012AOv
I
317453 100T
P01 165141 X7466
op
'1200' KING COUNTY SOUTH
TREATMENT PLANT
317429 1 x15kVA 120/240v
PO2 165154 2x15kVA 120/208v
317426.165149
oto
317425 P03
165152
317428.165164 3
10kVA 120I240v
RJN
11
33177MI6517v �O,1,
2x1 11
'1215' 317402.165185 �Os�
SITE PLAN: P01 THROUGH P03
SCALE: 1:100
EROSION & SEDIMENT CONTROL REQUIREMENTS
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
SITE SPECIFIC NOTES
P01:317453-165141
- REMOVE TRANS. FRAMING
- REMOVE TRANS. DWN GUYS
- RAISE DIST. FRAMING 2'& TOP POLES & INSTALL POLE WRAP
- EXTEND PRI 1/0 WIRE & 2 RISERS TO NEUTRAL HEIGHT
- EXTEND UG SEC WIRE & SEC RISER
- EXTEND & RAISE DIST. DWN GUYS
- REMOVE TRANS. ANCHOR NORTH
P02: 317429-165154
- REMOVE TRANS. FRAMING
- REMOVE TRANS. SPAN GUY
- RAISE DIST. FRAMING 4'& TOP POLES & INSTALL POLE WRAP
- EXTEND & RAISE DIST. SPAN GUY
- ADD NEUTRAL SPAN GUY
P03:317425-165152
- ADJUST EXIST DOWN GUY WIRE FOR PRIMARY SPAN GUY
SPAN NOTES
P01 TO P02
- WRECKOUT 1 SPAN TRANSMISSION WIRES (tom
P01 317453 100T
165141 X7466
UNDERGROUND CIRCUIT MAP
SCALE: 1:100
POWER GENERAL NOTES
1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this
work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three
(3) working days in advance.
3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work
to get the underground facilities located.
4. All work is to be done in accordance with local municipal and county permit requirements as applicable.
5. Inclement weather conditions may cause delays in construction times and dates.
5T O t
ST 30;
%r •*.SK00782
S h: .30 � 303(6: :
30
•
WN
O
:C\
C. ;C U1#
6S3
3
ti
G1ElVr :..
30
Z ; PARK
�;30
lklif.4.
',C .A
0
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
30
e
:y
30A
X7261 �N
RJN `
11
UgKE? •ALE-•''•••., •• •.
U274
30 4�
:•e3
W
JOB SITES
301% U 30
.6 U
X5713
,s S
X0734 X57121ooT .,.•••
of 0410 X7243
•30
U0445
'I-00'
• 3 r X566
I e 3;�46T
&qa° .306
30 SW *..... S ..... c
\U2270 E 3R U22 co
�\ LO
634
3
30 N�
•• ^o
_X_
(00
30, Loo
ENGR-1: #110715
FOREMAN (CHECK BOX WHEN COMPLETED)
❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
❑ Field Changes RED -LIN ED on As -built.
❑ Material VERIFIED and CHANGES noted on Paperwork.
❑ Total PRIMARY Cable noted on As -built.
❑ Company ID#'s RECORDED in correct location on As -built.
❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE.
❑ Deviations noted on the As -built and their reason.
❑ I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
Foreman's Signature
Print Name Date
PROJECT PHASE
NOTIF#
ORDER#
PWR Superior
Transmission Removal
Expense
504757406
186049280
N/A
108104763
N/A
186050533
N/A
N/A
Vicinity Map
s_ N
.. ag
ey"
'� � ews� � Wiavar8'aywa;F � • �Ran
£c t JOB SITE
Renton '
DOWNTOWN
• �r.�=�ns�R�r« s.�r
Talo, e'
7
_ Franr�rtut8 .
v
' »e
m
For contacts below dial 1 -888 -CALL PSE (225-5773)
CALL (800) 424-5555
Developer Yes
"Locates Required" No X
"Outages Required" Yes x
"Flagging Required" Yes x
Yes x PSE 2 BUSINESS DAYS BEFORE YUU UlU
No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
No REAL ESTATE/EASEMENT PERMIT
No N/A CITY OF RENTON
3
FUNCTION CONTACT
PHONE NO DATE
2
PROJECT MGR S.VEGA
253-327-3162 12/12/17
1
ENGR -POWER V.EDER
253-234-6129 12/12/17
REV# DATE
BY DESCRIPTION
ENGR - GAS N/A
N/A N/A
COUNTY
KING
Emer Sect Gas Wk Ctr
WA N/A
POWER WK CTR
QCSOKE
DRAWN BY V.EDER
253-234-6129 12/12/17
CHECKED BY
1/4 SEC
T23 R04E NW24
OP MAP
WA
PLAT MAP
N/A
APPROVED BY
tY'
FOREMAN #1
U -MAP NO (POWER)
2304EO94
OH CKT MAP
2305EO76
UG CKT MAP
2304EO94
CIRCUIT NO
RJN-11
FOREMAN #2
MAPPING
JOINT FACILITIES ARRANGEMENTS
UTILITIES
CONTACT
PHONE#
N/A
N/A N/A
N/A
N/A N/A N/A
N/A
N/A N/A N/A
N/A
PUGET 2404EO94 RJN-11 CLINK RENTON TK#110715
SOUNDGas
WRECKOUT 1 SPAN TRANS, RAISE DIST & 2 TOP POLES
ENERGY 1201 MONSTER AVE SW RENTON WA 98057
DESIGNED BY POTELCO
INCIDENT MAOP
N/A N/A
Order Elect Order
N/A 186049280
SCALE PAGE
1:100 1/1