Loading...
HomeMy WebLinkAboutP_Design_V2_186049280_V1_180821V� 3 v Z g EL0 00 N rn 4- 0 t0 00 0 U O 41 U') O Z 0 Z w ry Y Z J 0 0 00 N rn 0 c0 0D i 0 cV 0 rn v L a� (n 1-11Z LL / v `o s I 1n D- 0 41 C 0 0 0 X E 0 12 1 00 0 cV a Q 317461465128 22RVA 27714MV 317460-165142 2WVA 12012AOv I 317453 100T P01 165141 X7466 op '1200' KING COUNTY SOUTH TREATMENT PLANT 317429 1 x15kVA 120/240v PO2 165154 2x15kVA 120/208v 317426.165149 oto 317425 P03 165152 317428.165164 3 10kVA 120I240v RJN 11 33177MI6517v �O,1, 2x1 11 '1215' 317402.165185 �Os� SITE PLAN: P01 THROUGH P03 SCALE: 1:100 EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) SITE SPECIFIC NOTES P01:317453-165141 - REMOVE TRANS. FRAMING - REMOVE TRANS. DWN GUYS - RAISE DIST. FRAMING 2'& TOP POLES & INSTALL POLE WRAP - EXTEND PRI 1/0 WIRE & 2 RISERS TO NEUTRAL HEIGHT - EXTEND UG SEC WIRE & SEC RISER - EXTEND & RAISE DIST. DWN GUYS - REMOVE TRANS. ANCHOR NORTH P02: 317429-165154 - REMOVE TRANS. FRAMING - REMOVE TRANS. SPAN GUY - RAISE DIST. FRAMING 4'& TOP POLES & INSTALL POLE WRAP - EXTEND & RAISE DIST. SPAN GUY - ADD NEUTRAL SPAN GUY P03:317425-165152 - ADJUST EXIST DOWN GUY WIRE FOR PRIMARY SPAN GUY SPAN NOTES P01 TO P02 - WRECKOUT 1 SPAN TRANSMISSION WIRES (tom P01 317453 100T 165141 X7466 UNDERGROUND CIRCUIT MAP SCALE: 1:100 POWER GENERAL NOTES 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. All work is to be done in accordance with local municipal and county permit requirements as applicable. 5. Inclement weather conditions may cause delays in construction times and dates. 5T O t ST 30; %r •*.SK00782 S h: .30 � 303(6: : 30 • WN O :C\ C. ;C U1# 6S3 3 ti G1ElVr :.. 30 Z ; PARK �;30 lklif.4. ',C .A 0 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE 30 e :y 30A X7261 �N RJN ` 11 UgKE? •ALE-•''•••., •• •. U274 30 4� :•e3 W JOB SITES 301% U 30 .6 U X5713 ,s S X0734 X57121ooT .,.••• of 0410 X7243 •30 U0445 'I-00' • 3 r X566 I e 3;�46T &qa° .306 30 SW *..... S ..... c \U2270 E 3R U22 co �\ LO 634 3 30 N� •• ^o _X_ (00 30, Loo ENGR-1: #110715 FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LIN ED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As -built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Transmission Removal Expense 504757406 186049280 N/A 108104763 N/A 186050533 N/A N/A Vicinity Map s_ N .. ag ey" '� � ews� � Wiavar8'aywa;F � • �Ran £c t JOB SITE Renton ' DOWNTOWN • �r.�=�ns�R�r« s.�r Talo, e' 7 _ Franr�rtut8 . v ' »e m For contacts below dial 1 -888 -CALL PSE (225-5773) CALL (800) 424-5555 Developer Yes "Locates Required" No X "Outages Required" Yes x "Flagging Required" Yes x Yes x PSE 2 BUSINESS DAYS BEFORE YUU UlU No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES No REAL ESTATE/EASEMENT PERMIT No N/A CITY OF RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR S.VEGA 253-327-3162 12/12/17 1 ENGR -POWER V.EDER 253-234-6129 12/12/17 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr WA N/A POWER WK CTR QCSOKE DRAWN BY V.EDER 253-234-6129 12/12/17 CHECKED BY 1/4 SEC T23 R04E NW24 OP MAP WA PLAT MAP N/A APPROVED BY tY' FOREMAN #1 U -MAP NO (POWER) 2304EO94 OH CKT MAP 2305EO76 UG CKT MAP 2304EO94 CIRCUIT NO RJN-11 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES CONTACT PHONE# N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PUGET 2404EO94 RJN-11 CLINK RENTON TK#110715 SOUNDGas WRECKOUT 1 SPAN TRANS, RAISE DIST & 2 TOP POLES ENERGY 1201 MONSTER AVE SW RENTON WA 98057 DESIGNED BY POTELCO INCIDENT MAOP N/A N/A Order Elect Order N/A 186049280 SCALE PAGE 1:100 1/1