HomeMy WebLinkAboutMFP18006446DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18006446
IVR Number: 18006446
Permit Informaon
Permit Name:Puget Sound Energy Gas Permits
Address/Locaon :11/21/2018Application Date:6197800160Parcel Number:18652 116TH AVE SE
Permit Type:11/30/2018Issue Date:Franchise
Permit Work Class:11/30/2019Expiration Date:Minor Utility
Job Number:892046712Franchise Type:Natural Gas
Description:Investigate and repair gas leak on service. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - GAS -
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Stuart Bennett
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - GAS -
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
892046712
Anish Kumar
253-208-2183
anish.kumar@pse.com
18652 116th Ave SE 98058 892046712
One at a time occupying S & N bound lanes of 116th Ave SE for crew to
investigate and repair gas leak on service @ 447' N C/L of SE 188th St & 30' E C/L of 116th
Ave SE. 1 4'x5' pavement cut anticipated. Restoration per City of Renton standards.
PSE/Infrasource 253-208-2183
INFRASL871C2 BL.036742
11/12/2018
MFP18006446
Scott Warlick 11/26/2018
Holly Powers 11/30/2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
892046712
PSE/Infrasource
Courtney Isbell 253-293-0216
6905 S 228th St, Kent 98032
courtney.isbell@pse.com
18652 116th Ave SE
TBD
12/17/2018
Anish Kumar 11/12/2018
MFP18006446
Scott Warlick
11/26/2018Monday - Friday
9:00 - 2:30pm
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
91212100'100'100'100'
100'911Job#892046712
18652 116TH AVE SE, RENTON, WA
November 1, 2018
Sheet 1 of 2 gregory.harwood@pse.com
(425) 424-6425
www.trafficmanagement.com
800.763.3999
Traffic Control Services - Sales & Rentals
Permits & Consulting - Engineering - Training
PLAN PREPARED BY:
DATE: 11/1/18PLAN ORDER: 43487
TMI CONTACT PERSON: Michael Flanagan
TCS CERT #: 301872
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
LANE
WIDTHS
POSTED SPEED LIMITS
20 25 30 35 40 45
10
11
12
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
MFP18006446
100'100'100'100'121211Job#892046712
18652 116TH AVE SE, RENTON, WA
November 1, 2018
Sheet 2 of 2 gregory.harwood@pse.com
(425) 424-6425
www.trafficmanagement.com
800.763.3999
Traffic Control Services - Sales & Rentals
Permits & Consulting - Engineering - Training
PLAN PREPARED BY:
DATE: 11/1/18PLAN ORDER: 43487
TMI CONTACT PERSON: Michael Flanagan
TCS CERT #: 301872
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
LANE
WIDTHS
POSTED SPEED LIMITS
20 25 30 35 40 45
10
11
12
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
MFP18006446
MFP18006446
BENSON HILLS ELEMENTARY
TRINITY BAPTIST CHURCH
1151511509115031143711431
18624
18652
18670
18662
11618
18652
18626
11626 11642116TH AVE SESE 188TH ST11'N13'N
2" MPE IP 28'S 107048155-2014 JT
2" STW IP 13'W 887000700-2004 2" STW IP 12'W 5205-19632" STW IP 12'W 3528-19622" STW IP 14'S 6205-19632" STW IP 12'W 3528-19622" STW 14'S
5/8"253'S
1 1/8" MPEI2016-E 1 1/8" MPEI2016-E
1 1/8" MPEI2015-E1 1/8" MPEI2016-E
1 1/8" MPEI2017-E
1 1/8" MPEI2017-E
1 1/8" MPEI2017-E 1 1/8" MPEI2017-E
3/4" STW1963
1 1/4" STW1967
3/4" STW-U1969
3/4" STW1963
5/8" PE1981
5/8" MPE199512'WT
F
TF29'W15'S30'W16'W30'E90'W266'W274'W222'W214'W102'W98'W179'E77'E253'S
340'S
440'S
447'N
210'E262'E17'N
99'N
623'S
32"d
A
T
L
T
L
T332'W
18'W20'WT 15'N
T 8'N
S 14'N
S9'N
270'EB
B 25'S
B 626'S,12'W
DC No electric grid information availableS212080, Q215083
The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“
10-24-2018
Scale 1:1012
Lat\Long=47.4349, -122.1865
MFP18006446