HomeMy WebLinkAboutMFP18006392DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18006392
IVR Number: 18006392
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :11/20/2018Application Date:7231502030Parcel Number:104 BURNETT AVE S
Permit Type:11/30/2018Issue Date:Franchise
Permit Work Class:11/30/2019Expiration Date:Minor Utility
Job Number:101113708Franchise Type:Electric
Description:Install J box in sidewalk @ J02. Install transformer at V02. Trench for new conduit and primary from J 02 V02, J02 IP1 &
J02 IP2. Crew will to work next to V01, V02, J01, J02, J03, & J04 as well as along trenchline between J02 & V02.
Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101113708
Anish Kumar
253-208-2183
anish.kumar@pse.com
104 Burnett Ave S 98057 101113708
Installation of J-box in sidewalk @ J02. Installation of transformer at V02. Trenching for new conduit
and primary from J02-V02, J02-IP1 & J02-IP2. Crews will need to work next to V01, V02, J01, J02, J03 & J04 as well
as along trenchline between J02 & V02. Pavement cuts anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
11/6/2018
MFP18006392
Scott Warlick 11/20/2018
Justin Johnson 11-28-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101113708
PSE/Potelco Inc.
Val Buzunov 253-395-6826
6905 S 228th St, Kent, WA 98032
val.buzunov@pse.com
104 Burnett Ave S
TBD
TBD
Anish Kumar 11/6/2018
MFP18006392
Justin Johnson
11-28-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
Williams AVE SWilliams AVE SS Tillicum St
S Tobin St Burnett AVE S STOP
STOPSTOP
STOPS
R
i
v
e
r
d
a
l
e
D
r
STOPSTOPSTOPSTOPSTOPSTOP
STOP
N
R
i
v
e
r
d
a
l
e
D
r
N
1
s
t
S
t
N
1
s
t
S
t
Williams AVE SWilliams AVE SN 2nd St
Parking lot
S
R
i
v
e
r
d
a
l
e
D
r
99
91
104
104
87
95
107
Williams AVE SWilliams AVE SBurnett AVE S Burnett AVE S S Tobin St
S Tillicum St
N
1
s
t
S
t
N
1
s
t
S
t
N
R
i
v
e
r
d
a
l
e
D
r
J01
J02
V01
IP1
IP2
V02
J03
J04
SIDEWALK
CLOSED
R9-9
SIDEWALK
CLOSEDR9-9
ROAD
WORK
AHEAD
W20-1
100'
ROAD
WORK
AHEAD
W20-1100'
RIGHT LANE
CLOSED
AHEAD
W20-5
W4-2
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
150'
150'
150'150'
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEADW20-1
ROAD
WORK
AHEAD W20-1
SIDEWALK
CLOSEDR9-9
SIDEWALK
CLOSEDR9-9
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
ROAD
WORK
AHEAD
W20-1
W4-2
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
R7-T39
J03 can be accessed by the parking lane.
No parking signs to be put up 48 prior
to work being preformed on Williams AVE S.
200'
100'
SIDEWALK
CLOSED R9-9
SIDEWALK
CLOSED R9-9
ROAD
WORK
AHEAD W20-1
100'
SCOPE OF WORK
Installation of Jbox in sidewalk at J02.
Installation of transformer at V02.
Trenching for new conduit and primary
from J02-V02, J02-IP1 and J02-IP2.
Crews will work next to V01, V02, J01,
J02, J03 and J04 as well as along the
trench between J02 and V02.
Spotter to assist pedestrians
cross Williams AVE S.
SPEED
LIMIT25
Designed By:
CUSTOMER:
CONTACT:
LOCATION:
DATE: WO#
Julianna Johnson
WATCS 010346
425-252-0906 EXT: 5860
PSE
Mitch Peterson
425-398-6071
10-29-18 101113708
104 Burnett AVE S
Renton WA
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT. 1
4 DAYS IN ADVANCE
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
Legend
Cone
NO PARKING
FROM
TO
TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
No Parking R7-T39
SIDEWALK
CLOSED Sidewalk Closed
Spotter
ROAD
WORK
AHEAD W20-1 Road Work Ahead
RIGHT LANE
CLOSED
AHEAD W20-5 right lane closed ahead
W4-2 road narrows
Work Area
Work Truck
INVENTORY
2-Spotter
11-No Parking
7-Road Work Ahead
1-Right Lane Closed Ahead
2-Merge Left
4-Sidewalk Closed
40-Cones
NOT TO SCALE
N
S
EW
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 11' lanes
3. Maintain local access
4. Notify Metro @ 477-1150
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
www.invarion.com
MFP18006392
MFP18006392
MFP18006392