Loading...
HomeMy WebLinkAboutP_Design_101113708_V1_181106cV CIRCUIT FEET REMOVED: 720' 317965-166061 J04 CIRCUIT FEET ADDED: 945' J Sq. Footage: 61,500 — — Panel Size: 2500AMPS Heat Type: ELEC j 317964-166060 Est. Demand: 226KW LRC: 616A % V. Drop: 1.8% % Flicker: 2.2% 720" I I I I I I S TOBIN ST li I 1 1 75 17911 iK I I I 1 I 317942-166061 V03 100kVA 120/240v O -� "81., "87" I tot — — 1 119111 91" 1 317 26-166036 I 1 119511 P I p L--- \ 9911 I � t � - I � I FL L "101" / I 317912 166036 — — --� X96 I I 1 / X9557 I "107" 1 I / 110' — — 4 P2 317903-166060 I IP3 500kVA 120/208V V02 T VO1 � DEVELOPER RESPONSIBLE FOR CONDUITNVIRE FROM M H H 1 I VAULT TO METER LOCATION Moll (TYPICAL) IP4 J02 31789 -1660 3 317897-166036 37.5kVA 120/240v 3179 -166067 225WV 120/208v ? I (10504312) 317901e a I 75kVA 1 3 893- 66062 \ "116" I I I ' 60 I I ROW I I I "124" I I I 317881-166065 3 X 50kVA 120/240v @ IL1023283 I I I I -� 317948-166066 "74" / "78" L I 317938-1 6063 "82" I "84„ I ( co a Q J O ` 317928-166066 I "94" 31791E-166062 j'gg" EROSION & SEDIMENT CONTROL REQUIREMENTS EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG. SPAN SOURCE # OF RUNS WIRE SIZE REMARKS TO METERS - - - UPGRADE TO 500kVA "104" 1 V02 9 350KCMIL 11358974 317902-16606 75kVA 120/24 DEMO/REBUILD "104" I / I I / / 317883-166035 / "71 0" 317877-166059 J01 SITE PLAN I SCALE: 1" = 50' DEDICATED FACILITIES (101113708) for LRC 17910-166066 J03 / J /� SITE # SPAN ADDITIONAL FOOTAGE REMARKS LABOR UNITS FROM TO V02 - - - UPGRADE TO 500kVA - ALL CUSTOMER -OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE � 6.. 51�1' 4'-8" 44" 20" 0 0 3'-6" 4'-8" �' 4'-8" VAULT DETAIL V02 SCALE: NONE SIDE VIEW Excavation - 10-1/3 cubic yards SITE SPECIFIC NOTES AT V01 (317902-166060) -REMOVE EXISTING 30 JBUS AT J02 (317898-166073) -INSTALL NEW 575 VAULT AND (4) J -BUSSES AT HH1 -REMOVE EXISTING CONCRETE HANDHOLE AT IPI -INTERCEPT EXISTING 2" CONDUIT AND RE-ROUTE TO J02 AT IP2 & IP3 -INTERCEPT EXISTING 4" CONDUIT AND RE-ROUTE TO J02 AT IN -INTERCEPT EXISTING 4" CONDUIT AND RE-ROUTE TO J02 -RE-ROUTE EXISTING 30 PRIMARY TO J02 TAGS: AOAC1696, BOACI697, COAC1698 CUSTOMER DEVELOPMENT NOTES A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -PROVIDE A 5'X 10' WORK PIT AT IP1, IP2. -PROVIDE A 9'X 11' WORK PIT & 5/8 MINUS CRUSHED ROCK AT J02 & V02. TRENCHING & CONDUIT. -PROVIDE ±150' OF TRENCHING FROM J02 TO V02. -PROVIDE ±10' OF TRENCHING FROM J02 TO IP1. -PROVIDE ±10' OF TRENCHING FROM J02 TO IP1. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. -IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE -CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS. LOW PROFILE SITE PLAN NOT TO SCALE y TOP VIEW SIDE VIEW .7 000 000 000 000 000 000 000 000 Excavation - 19-1/2 cubic yards 6„ Crushed 51-411 Rock THREE PH PRIMARY J -BOX DETAIL @ J02 Not to scale 6055.1030-01 POWER GENERAL NOTES - COMMERCIAL PROJECT 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6. Roads shall be paved or have a compacted, crushed rock base in place. 7. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8. All work is to be done in accordance with local municipal and county permit requirements as applicable. 9. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10. Inclement weather conditions may cause delays in construction times and dates. 11. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. CIRCUIT LOADING TABLE CIRCUIT: GRA -17 AS OF 6.6.18 A PHASE B PHASE C PHASE EXIST. PEAK LOAD 200 198 217 EST. NEW LOAD 13 13 13 FOTAL 213 211 230 ABANDONED / REMOVE / REPLACED CABLE SCHEDULE CABLE NO. SAP EQUIP LOCATIONS CABLE EXISTING CABLE EXISTING CABLE (LF) EST MFG. NAME MFG. DATE CABLE REPLACED? Notes FROM TO AOAC1699 11358975 V01 J04 655 594123431 COAFG338 11358974 655 BOAFG337 11358973 V03 V01 390 DRAWN BY T. MULLENIX 206.305.6912 10.23.18 AOAEK271 11478346 V01 J03 70 PLAT MAP N/A APPROVED BY BOAEK272 11478347 70 U -MAP NO (POWER) 2305EO69 COAEK273 11478348 70 FOREMAN #2 TOTAL 1610' FOREMAN (CHECK BOX WHEN COMPLETED) ❑ PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. ❑ Grid, Cable, and Switch numbers INSTALLED & VERIFIED. ❑ Field Changes RED -LINED on As -built. ❑ Material VERIFIED and CHANGES noted on Paperwork. ❑ Total PRIMARY Cable noted on As -built. ❑ Company ID#'s RECORDED in correct location on As -built. ❑ Indicate correct FUSE SIZE on As built & VERIFY proper PHASE. ❑ Deviations noted on the As -built and their reason. ❑ I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. Foreman's Signature Print Name Date PROJECT PHASE NOTIF# ORDER# PWR Superior Perm. Service TESP Install TEST Removal TESP UG Expense 506165395 104306923 506165393 101113708 108107752 11461049 101114712 1 108108632 594123431 206.305.6912 10.23.18 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR QCNOKE DRAWN BY T. MULLENIX Project Manager Contact Information: Manager.' VAL BUZUNOV Cell Phone: 425-457-9938 E -Mail: VAL.BUZUNOV@PSE.COM Vicinity Map 47.4823,-122.2064 N Salvation Army Church sy. S Tobin St L�'s� aAOr yR�y at � w Q 3 Jones Park;, W� W � f m � — � b SOB SITE U.S. Bank Branch n `y A ase Bank o Cheers Bar & jFJ N '" Grill Renton Q S 2nd St 9 R( nton Park & Ride g - m d y W � b Owner/ Developer Contact Info MGP 47 LLC C/O MERRILL GARDEN 1938 FAIRVIEW AVE E, SUITE 300 SEATTLE, WA 98102 ATTN: JAY WERNER 425-462-9441 office For contacts below dial 1 -888 -CALL PSE (225-5773) CALL (8001424-5555 Developer YesX "Locates Required" No "Outages Required" YesX "Flagging Required" YesX YesX PSE 2 BUSINESS DAYS BEFORE YOU DIG No THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES No REAL ESTATE/EASEMENT PERMIT No RW -111377 RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR VAL BUZUNOV 425-457-9938 9.17.18 1 ENGR - POWER T. MULLENIX 206.305.6912 10.23.18 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY KING Emer Sect Gas Wk Ctr N/A N/A POWER WK CTR QCNOKE DRAWN BY T. MULLENIX 206.305.6912 10.23.18 CHECKED BYIx t3f/ 1/4 SEC NE 18 -23N -05E OP MAP N/A PLAT MAP N/A APPROVED BY FOREMAN #1 U -MAP NO (POWER) 2305EO69 OH CKT MAP 2305EO76 JUGCICTMAIP 2305EO69 ICIRCUITNO GRA -17 FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A RIGHT OF WAY N/A CONTACT PHONE# N/A N/A AMBER YANG N/A WA N/A 425.456.2774 NIA PUGET SOUND ENERGY 104 BURNETT AVE S 3fTS PRIMARY LINE EXTENSION 104 BURNETT AVE S, RENTON, WA 98057 INCIDENT MAOP N/A N/A Gas Order Elect Order N/A 101113708 SCALE PAGE AS NOTED 1/2 z 0 + 5'X 10 WORK PIT I IP1 IP2 I PSE TO SUPPLY & INSTALL ±10' OF 4" SCHL 80 CONDUIT PSE TO SUPPLY & INSTALL IP2 ±10' OF 2" SCHL 80 CONDUIT - __q0 9'X 11' WORK PIT 8' 4"R 5' X 10' WORK PIT 9' X 11' WORK PIT _ _ 140_ r PSE TO SUPPLY & INSTALL C49"R 00 J02 ±10'OF 4" SCHL 80 CONDUIT I133 I PSE TO SUPPLY & INSTALL ±150' OF 4" SCHL 80 CONDUIT CONDUIT DIAGRAM SCALE: NONE AOEIB704 COEIB706 1 PSE TO INSTALL ±700' OF /20 1/0 AL JKT PRIMARY CABLE I PSE TO INSTALL ±400' OF (� 10 1/O AL JKT PRIMARY CABLE B0EIB705 a0EI6701 PSE TO INSTALL ±10' OF 10 BOEIB702 1/0 AL JKT PRIMARY CABLEV01 COEIB703 A0EIB707 0-1 J03 B0E1B711 BOEIB708 — — COEIB709 JPSE TO INSTALL ±85' OF 30 027\2:)0 V02 1/0 AL JKT PRIMARY CABLE PSE TO INSTALL ±160' OF 30 1/0 AL JKT PRIMARY CABLE BOEIB710 PSE TO INSTALL ±10' OF 10 1/O AL JKT PRIMARY JUMPER CABLE CABLE DIAGRAM SCALE: NONE SCALE: 6" = 1 MILE PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE TYPE & SIZE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN) SIZE QTY. DESIGN LENGTH (FT) BENDSPULL PULL {LBS) REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED 900 A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE J02 J03 (IP3) 4 SCHL 80 1 10 - 279 320 30 1/0 AL JKT 85 EIB701 EIB702 EIB703 I COAEK276 31 908-166067 CHARGE TO TESP o 2 SWA 1201208v J02 J04 (IP2) 4 SCHL 80 1 10 COAC1698 393 298 20 1/0 AL JKT 700 EIB704 EIB706 V02 166066 CHARGE TO TESP 208Y/120 3 J02 V02 4 SCHL 80 1 150 Matid: 6258250 267 232 30 1/0 AL JKT 160 EIB707 EIB708 EIB709 J -Box Below Grade 104 BURNETT AVE S 30 PRIMARY LINE EXTENSIONGas 104 BURNETT AVE S, RENTON, WA 98057 INCIDENT MAOP N/A N/A Order Elect Order N/A 101113708 GE SCALE72/2 AS NOTED V03 J02 V03 (IP1) 2 SCHL 80 1 10 122 99 10 1/0 AL JKT 400 EIB705 CHARGE TO TESP Matid: Existing J02 Vol CABLE ONLY 31 31 10 1/0 AL JKT 10 EIB711 EXIST 166059 CHARGE TO TESP w/4-Pos J -Bus x3 3 J02 JUMPER CABLE ONLY 2" PVC (FT) & RFNn.q = I n 10 1/0 AL JKT 10 Matid: Existing EIB710 CHARGE TO TESP 317898 4'8"x7'x5' 4" PVC (FT) & BENDS = 180 1 VAULT & EQUIPMENT TABLE 1/O AL JKT TOTAL (FT) = 1900 TRANSFORMER INSTALLATION Installed at site: V02 Grid Number: 317948-166066 kVA Rating: 500kVA Material ID#: 6258250 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage / Top View, 12 kV Cable Routing Cables should enter the vault so that all of the cables will lay in the same direction. ADW637 REAL ESTATE/EASEMENT EASEMENT TYPE & SIZE PRIMARY BUSHINGS 12" Min 12" Min AS -BUILT INFORMATION (No rocks over 10" diameter) AOAEK271 VAULT SIZE & EQUIPMENT IN BOAEK272 TRANSFORMER ID w LB DC SITE # GRID # COVER VAULT NUMBERS (COMPANY ID) FOREMAN: INCLUDE PHASE TAPPED T. MULLENIX 206.305.6912 4'8"x7'x5' J -Box Below Grade BY DESCRIPTION J N/A Vol 317902 w/2-3' Sq Doors w/4-Pos J -Bus x3 1 - AOUNK � 206.305.6912 EXIST 166060 Matid: Existing 100kVA TUT 317902-166060 I COAEK276 31 908-166067 75kVA 1201240v o 2 SWA 1201208v AOAC1696 Matid: Existing BOAC1697 OH CKT MAP 2305EO76 I UG CKT MAP 2305EO69 COAC1698 317948 7'x7'x4' w/60"x24" 500kVA 30 PM TRF JOB SITE V02 166066 access w/8' Sq Cover 208Y/120 3 - 317881-166065 COAC1692 N/A 3X50kVA 1201240v Matid: 7917901 Matid: 6258250 BOUNK 317 7-166059 COUNK N/A N/A N/A N/A 4'8"x7'x5' J -Box Below Grade 104 BURNETT AVE S 30 PRIMARY LINE EXTENSIONGas 104 BURNETT AVE S, RENTON, WA 98057 INCIDENT MAOP N/A N/A Order Elect Order N/A 101113708 GE SCALE72/2 AS NOTED V03 317942 w/2-3' Sq Doors w/4-Pos J -Bus x3 1 - EXIST 166061 Matid: Existing 100kVA TUT Matid: Existing J01 317877 4'8"x7'x5' J -Box Below Grade EXIST 166059 w/2-3' Sq Doors w/4-Pos J -Bus x3 3 - Matid: Existing Matid: Existing 317898 4'8"x7'x5' J -Box Below Grade J02 166073 w/2-3' Sq Doors w/4-Pos J -Bus x4 15 1 Matid: 9996200 Matid: 7625900 J03 317910 4'8"x7'x5' J -Box Below Grade EXIST 166066 w/2-3' Sq Doors w/4-Pos J -Bus x3 3 - Matid: Existing Matid: Existing J04 317965 4'8"x7'x5' J -Box Below Grade EXIST 166061 w/2-3' Sq Doors w/4-Pos J -Bus x3 2 - Matid: Existing Matid: Existing TRANSFORMER INSTALLATION Installed at site: V02 Grid Number: 317948-166066 kVA Rating: 500kVA Material ID#: 6258250 Foreman to redline the following information Company ID#: Primary phase connected to: Tested Secondary Voltage / Top View, 12 kV Cable Routing Cables should enter the vault so that all of the cables will lay in the same direction. ADW637 REAL ESTATE/EASEMENT EASEMENT COAFG338 Min\\ 12" Min 12" Min AOAC1699 (No rocks over 10" diameter) AOAEK271 Separation Separation DATE BOAEK272 48" SAA w COAEK273 �Ai Q 9.17.18 1 07 ENGR - POWER T. MULLENIX 206.305.6912 10.23.18 REV# DATE BY DESCRIPTION J N/A N/A _J COUNTY N/A Emer Sect as Wk Ctr N/A N/A IPOWER WK CTR N/A 317910-166 66 AOUNK � 206.305.6912 AOAEK274 CHECKED BY I1 j�3 BOAEK275 317902-166060 I COAEK276 31 908-166067 75kVA 1201240v o 2 SWA 1201208v AOAC1696 FOREMAN #1 BOAC1697 OH CKT MAP 2305EO76 I UG CKT MAP 2305EO69 COAC1698 FOREMAN #2 JOB SITE 317884-1 AOAC1690 100kVA 12 BOAC1691 UTILITIES 317881-166065 COAC1692 N/A 3X50kVA 1201240v CONTACT PHONE# BOUNK 317 7-166059 COUNK N/A N/A N/A N/A AOUNK J 104 BURNETT AVE S 30 PRIMARY LINE EXTENSIONGas 104 BURNETT AVE S, RENTON, WA 98057 UNDERGROUND CIRCUIT MAP SCALE: 6" = 1 MILE CURB OR EDGE OF PAVEMENT 5' MIN 3' �- MIN I COOLING FINS REQUIRED WORK SPACE AREA 5' MIN 3' MIN TYP. PAD & TRANS- FORMER 3' MIN 5' MIN 5' MIN =1= �-■ — ACCESS DOOR `�-- 10' MIN - — — �-� -- ACCESS —� DOOR CONCRETE PAD __7 Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Excavated Dirt Pile ROADSIDE 32" Typical (Power, Gas, and 24" Min Final Grade Communications) \\ii\\ii\\ice\\i/\, \12" Min \i Separation 36" REAL ESTATE/EASEMENT EASEMENT Backfill Min\\ 12" Min 12" Min (No rocks over 10" diameter) Cover i Separation Separation DATE 2 48" SAA PROJECT MGR �Ai Max\\— 9.17.18 1 6" or 12" Min Sand Shading after Compaction 4" Sand Bedding Gas -J I- Primary Power Communications Cables or Conduit JOINT TRENCH DETAIL Primary -Mainline Gas & Communications (NTS) CUSTOMER -SUPPLIED TRENCH FOR PRIMARY CABLE SCALE: NONE Excavated Dirt Pile 20" Min 24" Min Final Grade To Excavated Dirt Pile 24 Min Backfill for Conduit to Free of rocks ROAD OR 36" Max // /� larger than 8" \/ 12" Min PARKING AREA Cover �/\ Separation //j in diameter) I CURB OR EDGE OF PAVEMENT -I"- MINIMUM "-MINIMUM CLEARANCES FOR PSE EQUIPMENT Not to scale lJ FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 ROAD SIDE (PREFERRED) 3' MIN 0 0 31 ® 3' MIN MIN 6' MIN FIELD SIDE (PREFERRED) CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE 6775.0035 3' 8" — — 1— ��� 36" MINIMUM COVER �� IN RIGHT OF WAY TV & TEL - / Electric Service Cable in Conduit 3" Schedule 40 Grey PVC JOINT TRENCH DETAIL 0 LO PRIMARY SPLIT Electric Service Cable in Conduit (NTS) i=XICTInIr' I Ir DDIRAARY SPLICE PIT DETAIL 4'-0" ;Y SCALE: NONE REAL ESTATE/EASEMENT EASEMENT PERMIT RENTON 3 FUNCTION CONTACT PHONE NO DATE 2 PROJECT MGR VAL BUZUNOV 425-457-9938 9.17.18 1 ENGR - POWER T. MULLENIX 206.305.6912 10.23.18 REV# DATE BY DESCRIPTION ENGR - GAS N/A N/A N/A COUNTY N/A Emer Sect as Wk Ctr N/A N/A IPOWER WK CTR N/A DRAWN BY MULLENIX 206.305.6912 10.23.18 CHECKED BY I1 j�3 1/4 SEC N/A OP MAP N/A I PLAT MAP N/A APPROVED BY ,� J II fk FOREMAN #1 U -MAP NO (POWER) 2305EO69 OH CKT MAP 2305EO76 I UG CKT MAP 2305EO69 CIRCUIT NO N/A FOREMAN #2 MAPPING JOINT FACILITIES ARRANGEMENTS UTILITIES N/A N/A N/A N/A CONTACT PHONE# N/A N/A N/A N/A N/A N/A N/A N/A PU/ GE r`rT SOUND ENERGY 104 BURNETT AVE S 30 PRIMARY LINE EXTENSIONGas 104 BURNETT AVE S, RENTON, WA 98057 INCIDENT MAOP N/A N/A Order Elect Order N/A 101113708 GE SCALE72/2 AS NOTED