July 3, 2018
Mark Woodbridge
Builders Capital
5601 6th Avenue South #350
Seattle, Washington 98108
Subject: Stormwater Infiltration Feasibility Study
134 Elma Avenue Northeast
Renton, Washington
RGI Project No. 2018-139
Dear Mr. Woodbridge:
As requested, The Riley Group, Inc. (RGI) is pleased to provide the results of our recent subsurface
characterization services at 134 Elma Avenue Northeast in Renton, Washington (Figure 1).
Subsurface Conditions
RGI observed the completion of four test pits (TP-1, TP-2, TP-3, TP-4) to assess shallow subsurface
soil and groundwater conditions for potential infiltration of stormwater at the Site. The test pits
were completed using a subcontracted mini-excavator. The location of the four test pits are
shown on Figure 2.
Review of the Geologic map of the Renton quadrangle, King County, Washington, by Mullineaux,
D.R. (1965) indicates that the soil in the project vicinity is mapped as Vashon-age lodgment till
(Qvt), which is a nonsorted mixture of very dense silty sand with gravel and cobbles.
Review of the Preliminary Geologic Map of Seattle and Vicinity, Washington, by Waldron, H.H, et
al (1962) indicates that the soil in the project vicinity is mapped as Vashon-age lodgment till (Qvt),
which is a nonsorted mixture of very dense silty sand with gravel and cobbles.
In general the site soils encountered were comprised of a surface layer of sod and topsoil
underlain by very dense, silty sand with gravel interpreted to be glacially consolidated lodgment
till soils. No groundwater was encountered in any of the test probe borings.
Infiltration Feasibility
As described above glacially consolidated soils were encountered in all of the test probes
completed at the site. In test pits TP-1, TP-2, and TP-3 the unweathered very dense lodgment till
was encountered at a depth of six inches. In test pit TP-4 the unweathered very dense lodgment
till was encountered at approximately 18 inches.
Based on the presence of hydraulically restrictive soils comprised of glacially consolidated
lodgment till at very shallow depths below the topsoil at the site and separation distances
prescribed in City of Renton stormwater manual infiltration is considered infeasible at the Site.
USGS, 2014, Renton, Washington
7.5-Minute Quadrangle
Approximate Scale: 1"=1000'
0 500 1000 2000 N
Site Vicinity Map
Figure 1
07/2018
Corporate Office
17522 Bothell Way Northeast
Bothell, Washington 98011
Phone: 425.415.0551
Fax: 425.415.0311
Builders Capital Elma Avenue
RGI Project Number
2018-139
Date Drawn:
Address: 134 Elma Avenue Northeast, Renton, Washington 98059
SITE
TP-1TP-2TP-3TP-407/2018Corporate Office17522 Bothell Way NortheastBothell, Washington 98011Phone: 425.415.0551Fax: 425.415.0311Builders Capital Elma AvenueRGI Project Number2018-139Date Drawn:Address: 134 Elma Avenue Northeast, Renton, Washington 98059Site Plan with Test Pit LocationsFigure 2Approximate Scale: 1"=40'0204080N= Test pit by RGI, 6/19/18= Site boundary
Project Name:Builders Capital Elma AVE
Project Number:2018-139
Client:Builders Capital
Test Pit No.: TP-1
Date(s) Excavated:06/19/18
Excavation Method:Backhoe
Excavator Type:Mini-excavator
Groundwater Level:Not encountered
Test Pit Backfill:Native Soil
Logged By SL
Bucket Size:
Excavating Contractor:Kelly's Excavating
Sampling
Method(s)Continuous
Location 134 Elma Avenue Northeast, Renton, WA 98059
Surface Conditions:Sod
Total Depth of Excavation:5 feet bgs
Approximate
Surface Elevation n/a
Compaction Method n/a
USCS SymbolTop soil
SM
REMARKS AND OTHER TESTSGraphic LogMATERIAL DESCRIPTION
Top soil
Gray, silty SAND with gravel, very dense, moist (lodgment
till)
Test pit excavated to 5 feet bgs
No groundwater encounteredDepth (feet)0
5
10
15 Sample NumberSample TypeElevation (feet)Sheet 1 of 1
The Riley Group, Inc.
17522 Bothell Way NE, Bothell, WA 98011
Project Name:Builders Capital Elma AVE
Project Number:2018-139
Client:Builders Capital
Test Pit No.: TP-2
Date(s) Excavated:06/19/18
Excavation Method:Backhoe
Excavator Type:Mini-excavator
Groundwater Level:Not encountered
Test Pit Backfill:Native Soil
Logged By SL
Bucket Size:
Excavating Contractor:Kelly's Excavating
Sampling
Method(s)Continuous
Location 134 Elma Avenue Northeast, Renton, WA 98059
Surface Conditions:Sod
Total Depth of Excavation:5 feet bgs
Approximate
Surface Elevation n/a
Compaction Method n/a
USCS SymbolTop soil
SM
REMARKS AND OTHER TESTSGraphic LogMATERIAL DESCRIPTION
Top soil
Gray, silty SAND with gravel, very dense, moist (lodgment
till)
Test pit excavated to 5 feet bgs
No groundwater encounteredDepth (feet)0
5
10
15 Sample NumberSample TypeElevation (feet)Sheet 1 of 1
The Riley Group, Inc.
17522 Bothell Way NE, Bothell, WA 98011
Project Name:Builders Capital Elma AVE
Project Number:2018-139
Client:Builders Capital
Test Pit No.: TP-3
Date(s) Excavated:06/19/18
Excavation Method:Backhoe
Excavator Type:Mini-excavator
Groundwater Level:Not encountered
Test Pit Backfill:Native Soil
Logged By SL
Bucket Size:
Excavating Contractor:Kelly's Excavating
Sampling
Method(s)Continuous
Location 134 Elma Avenue Northeast, Renton, WA 98059
Surface Conditions:Sod
Total Depth of Excavation:5 feet bgs
Approximate
Surface Elevation n/a
Compaction Method n/a
USCS SymbolTop soil
SM
SM
REMARKS AND OTHER TESTSGraphic LogMATERIAL DESCRIPTION
Top soil
Brown, silty SAND with gravel, dense, moist (weathered
lodgment till)
Gray, silty SAND with gravel, very dense, moist (lodgment
till)
Test pit excavated to 5 feet bgs
No groundwater encounteredDepth (feet)0
5
10
15 Sample NumberSample TypeElevation (feet)Sheet 1 of 1
The Riley Group, Inc.
17522 Bothell Way NE, Bothell, WA 98011
Project Name:Builders Capital Elma AVE
Project Number:2018-139
Client:Builders Capital
Test Pit No.: TP-4
Date(s) Excavated:06/19/18
Excavation Method:Backhoe
Excavator Type:Mini-excavator
Groundwater Level:Not encountered
Test Pit Backfill:Native Soil
Logged By SL
Bucket Size:
Excavating Contractor:Kelly's Excavating
Sampling
Method(s)Continuous
Location 134 Elma Avenue Northeast, Renton, WA 98059
Surface Conditions:Sod
Total Depth of Excavation:5 feet bgs
Approximate
Surface Elevation n/a
Compaction Method n/a
USCS SymbolTop soil
SM
SM
REMARKS AND OTHER TESTSGraphic LogMATERIAL DESCRIPTION
Top soil
Brown/gray, silty SAND with gravel, dense, moist
(weathered lodgment till)
Gray, silty SAND with gravel, very dense, moist (lodgment
till)
Test pit excavated to 5 feet bgs
No groundwater encounteredDepth (feet)0
5
10
15 Sample NumberSample TypeElevation (feet)Sheet 1 of 1
The Riley Group, Inc.
17522 Bothell Way NE, Bothell, WA 98011
Project Name:Builders Capital Elma AVE
Project Number:2018-139
Client:Builders Capital
Key to Logs
USCS SymbolREMARKS AND OTHER TESTSGraphic LogMATERIAL DESCRIPTIONDepth (feet)Sample NumberSample TypeElevation (feet)1 2 3 4 5 6 7 8
COLUMN DESCRIPTIONS
1 Elevation (feet): Elevation (MSL, feet).
2 Depth (feet): Depth in feet below the ground surface.
3 Sample Type: Type of soil sample collected at the depth interval
shown.
4 Sample Number: Sample identification number.
5 USCS Symbol: USCS symbol of the subsurface material.
6 Graphic Log: Graphic depiction of the subsurface material
encountered.
7 MATERIAL DESCRIPTION: Description of material encountered.
May include consistency, moisture, color, and other descriptive
text.
8 REMARKS AND OTHER TESTS: Comments and observations
regarding drilling or sampling made by driller or field personnel.
FIELD AND LABORATORY TEST ABBREVIATIONS
CHEM: Chemical tests to assess corrosivity
COMP: Compaction test
CONS: One-dimensional consolidation test
LL: Liquid Limit, percent
PI: Plasticity Index, percent
SA: Sieve analysis (percent passing No. 200 Sieve)
UC: Unconfined compressive strength test, Qu, in ksf
WA: Wash sieve (percent passing No. 200 Sieve)
MATERIAL GRAPHIC SYMBOLS
Silty SAND (SM)
TYPICAL SAMPLER GRAPHIC SYMBOLS
Auger sampler
Bulk Sample
3-inch-OD California w/
brass rings
CME Sampler
Grab Sample
2.5-inch-OD Modified
California w/ brass liners
Pitcher Sample
2-inch-OD unlined split
spoon (SPT)
Shelby Tube (Thin-walled,
fixed head)
OTHER GRAPHIC SYMBOLS
Water level (at time of drilling, ATD)
Water level (after waiting)
Minor change in material properties within a
stratum
Inferred/gradational contact between strata
?Queried contact between strata
GENERAL NOTES
1: Soil classifications are based on the Unified Soil Classification System. Descriptions and stratum lines are interpretive, and actual lithologic changes may be
gradual. Field descriptions may have been modified to reflect results of lab tests.
2: Descriptions on these logs apply only at the specific boring locations and at the time the borings were advanced. They are not warranted to be representative
of subsurface conditions at other locations or times.
Sheet 1 of 1