HomeMy WebLinkAboutRE Tiffany Park - Pipe MaterialsYes, please proceed. Thank you.
Barry
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Barry Talkington, P.E.
Senior Project Engineer
Barghausen Consulting Engineers, Inc.
18215 72nd Avenue South
Kent, WA 98032
(425) 251-6222 - Phone
(425) 251-8782 - Fax
http://www.barghausen.com <http://www.barghausen.com/>
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
From: Ann Fowler [mailto:AFowler@Rentonwa.gov]
Sent: Wednesday, August 30, 2017 1:57 PM
To: Barry Talkington <btalkington@barghausen.com>; Tom Barghausen <tbarghausen@barghausen.com>
Cc: Thomas Mcloughlin <tomm@rinocon.com>; Randy Weber <rweber@novastardev.com>
Subject: RE: Tiffany Park - Pipe Materials
Barry –
I just received the below from Ron -
The Ductile Iron pipe will need to meet WSDOT Standard Specification requirements 9-30.1(1) with fitting that meet the WSDOT Standard Specifications 9-30.1(1). I’ll add this note to
the plans if that works for you.
Since the confined space entry requirements would require a person to be harnessed with a cable and a tripod over the MH opening, a fall restraint system in the manhole is not needed.
We will only require the ladder to be installed in the MH. No additional requirements are necessary due to the depth of the manhole.
If all looks good to you I’ll have the plans ready this afternoon for printing.
~Thanks
Ann Fowler
Civil Engineer II | CED
AFowler@Rentonwa.gov | Phone: (425) 430-7382
P Please consider the environment before printing this email
ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN!
For more information on Electronic Plan Review, please click here <http://secure-web.cisco.com/1B5_vYMCQC9JuiUKcPIqWoGQf49lLOYRrphM3p-oXLpAZfTlPdRNbBfAOXMy0FWqnzaiDyGaXFuGoIno94819vJbj0mIsTrtyWzxyepq
mjjTE88cfOCe9IL2k7Lle037cLDV87NWVf5Bii7eDH8fcZSmmqJlwkiCW-EoCQBskNsid2AxYM30RNQFISbtX3VDX4pcQ5A12uaOZ_9NxXRB6oeR9gP6mQVNeYjqERUFZNt82gAibHRG7bNJySNgmd2QgJ3DVP_lk8Ce7OBHrgRz1hDEjY5_m62fcQ11JxFuC_np76k
-E0TjR4jo9DMSfF0DXbwDVpOkyBg5Da9ka7bhIxA/http%3A%2F%2Frentonwa.gov%2Fpaperless%2F>
From: Barry Talkington [mailto:btalkington@barghausen.com]
Sent: Wednesday, August 30, 2017 11:28 AM
To: Ann Fowler <AFowler@Rentonwa.gov>; Tom Barghausen <tbarghausen@barghausen.com>
Cc: Thomas Mcloughlin <tomm@rinocon.com>; Randy Weber <rweber@novastardev.com>
Subject: RE: Tiffany Park - Pipe Materials
Importance: High
Hi Ann. Just wanted to check in on this. We would really like to get that precon scheduled.
Barry
From: Barry Talkington
Sent: Tuesday, August 29, 2017 2:51 PM
To: 'Ann Fowler' <AFowler@Rentonwa.gov>; Tom Barghausen <tbarghausen@barghausen.com>
Cc: Thomas Mcloughlin <tomm@rinocon.com>; Randy Weber <rweber@novastardev.com>
Subject: RE: Tiffany Park - Pipe Materials
Importance: High
I concur with your note.
Can we add an additional note that states “Manholes exceeding 20’ in depth shall require a landing platform. Shop drawings shall be provided to the City of Renton for approval, prior
to installation.”
Barry
From: Ann Fowler [mailto:AFowler@Rentonwa.gov]
Sent: Tuesday, August 29, 2017 2:24 PM
To: Barry Talkington <btalkington@barghausen.com>; Tom Barghausen <tbarghausen@barghausen.com>
Cc: Thomas Mcloughlin <tomm@rinocon.com>; Randy Weber <rweber@novastardev.com>
Subject: RE: Tiffany Park - Pipe Materials
One thing to note. The document I sent was found on-line. It will be up to you to determine if it is the correct/adequate document to determine the pipe class.
I’ve added the following note to the plans and added DI to the pipes greater than 20-ft. Do you concur?
~Thanks
Ann Fowler
Civil Engineer II | CED
AFowler@Rentonwa.gov | Phone: (425) 430-7382
P Please consider the environment before printing this email
ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN!
For more information on Electronic Plan Review, please click here <http://secure-web.cisco.com/1tsWiaM4F8MWRqnjujZGcUs_MEiTq8xz5XwHE_3-uHOfp4w_3Aax480bYEdtHBVS5pJD0gOTe8SVG1N6MmDzqtQAPsaodygMdq2CZ7qo
1bGlhFkxZSCEqdas7rov4H5zL8tYKGFuNORThQljuaa2GoP4LIIeWeaOBrLgURe-QhCS2Py3kECYBwUl9pMnTspan3KZtk7djuwVW254JCnfgVl_5l4JZxGjdT26APKwY7s-CO5hxNDUOetOJOmWQiLfl17CPynAdfssEf19gNrbTm5q4Csm9nNBpW6MHmaZQz7dAbp
sB4PzJ72bXvah2VJ9mcz_AAj761AENsh7O3Ex7mA/http%3A%2F%2Frentonwa.gov%2Fpaperless%2F>
From: Barry Talkington [mailto:btalkington@barghausen.com]
Sent: Tuesday, August 29, 2017 12:55 PM
To: Ann Fowler <AFowler@Rentonwa.gov>; Tom Barghausen <tbarghausen@barghausen.com>
Cc: Thomas Mcloughlin <tomm@rinocon.com>; Randy Weber <rweber@novastardev.com>
Subject: RE: Tiffany Park - Pipe Materials
Importance: High
Ann, from what I can tell based upon the Ductile Iron Pipe Design manual you provided we should be using CL52 for the 30” pipe and CL50 for all other DI pipe sizes. These are all assuming
Type 5 Laying Conditions. The maximum cover occurs at CB#17 with 25.2’ of cover. Per Table 4 the thickness of pipe required for 28’ of cover is 0.44”. This requires a Thickness Class
of 52 (CL52). I went through the same process for the other pipe sizes and found that CL50 will work. I am still looking into the question about the ladders as the code sections listed
below no longer exist. Please let me know if you concur with the sizing of the pipes. Thank you.
Barry
From: Ann Fowler [mailto:AFowler@Rentonwa.gov]
Sent: Tuesday, August 29, 2017 10:52 AM
To: Barry Talkington <btalkington@barghausen.com>; Tom Barghausen <tbarghausen@barghausen.com>
Subject: FW: Tiffany Park - Pipe Materials
Importance: High
Barry -
See below and attached for the request from Ron. Can you provide a detail for the Ladder Safety Requirement outlined below?
~Thanks
Ann Fowler
Civil Engineer II | CED
AFowler@Rentonwa.gov | Phone: (425) 430-7382
P Please consider the environment before printing this email
ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN!
For more information on Electronic Plan Review, please click here <http://secure-web.cisco.com/1cGIu8psn6KNvWLKN6vkjMD6Lfa8nMlT7DCl2Zf5LQOiyR5Pd5PVmqwFRoFdPNUVbZ9YiL-9-by2AGN_KVuXffA7Il3tlLa94n4Fj8xD
eNfUW1xzjWDGAp_WPINI73556-iAhbraV09nE4LUvWR3cIEEg56UzL48ucEIfafGQcWkizfMn1VjlDNRwWRuhVQpI7BjJE4dc3WNENPJgrHv5ZmDSsxFDgqYPOHD1w2jr3xJZPtpRIeQ4TNMMHVwrUPGQwCTuud8YZ5RWSdFED1nUjCdyBUy2XIeMKXKV8tDGTHKvrt
XU-fHvis17w3lTjaUDALuzOVm_JbpqUSdAcxajYw/http%3A%2F%2Frentonwa.gov%2Fpaperless%2F>
From: Ronald Straka
Sent: Tuesday, August 29, 2017 10:02 AM
To: Ann Fowler <AFowler@Rentonwa.gov>
Subject: FW: Tiffany Park - Pipe Materials
Ann,
Manholes that are greater than 20-ft need to have special safety features installed to meet Washington State Department of Labor and Industries ladder safety requirements also. This
will also need to be addressed on the plans. This a State WAC requirement per WAC 296-155-480 and WAC 296-24-810. Below is a link that describes the WAC that has this requirement.
http://secure-web.cisco.com/1NSp3WX3LlRl515IQaXCDymogt6zNjqLAxCuU4ZgcP8Q0-qjkwIgQ7PiMQdrPUzW2Ngzu4PW_ioVz0Y_3q6c3vGHnS7BnJb9jSEnNL1MYi24zB4QJPCTO1Rra0rpcs4t3CskRQIJ7rIYqg3wyeQJnYEmfhVKdqGJh9Tp27US10x
noXOb699lUzqbr-blVrQHtgk5odFF5EIsFkZaXvGw_3t8YTzNanW4XDR4F6E75E6vDKyFe5RH2A7H6_eyd2ad01uNP3yq-uepecz9ZsB-5PF88TrAMQZWSXL9osM2Pkx0-E7JKbcNuZyCgQg1gh5U-fMWqgmUSMbD06nCgwdKcag/http%3A%2F%2Fwww.wsdot.wa.
gov%2Fpublications%2Ffulltext%2FHydraulics%2Fcomment%2FB-15.40.pdf
Thank you,
Ron Straka, P.E.
Surface Water Utility Engineering Manager
425-430-7248
From: Ronald Straka
Sent: Tuesday, August 29, 2017 9:14 AM
To: Ann Fowler <AFowler@Rentonwa.gov>
Subject: RE: Tiffany Park - Pipe Materials
Ann,
The engineer needs to determine the ductile iron pipe thickness required for the depth of cover that will be over the deepest buried section of pipe. Below is a table that I found that
would indicate that a ductile iron pipe with a minimum wall thickness of 0.48-inches would be required and the pipe must be laid using Type 5 laying conditions. A 30-inch-Class 53
ductile iron pipe installed using laying conditions Type 5 would be required, but it is the engineers job to determine the adequacy of the pipe design.
Attached is the Ductile Iron Pipe Design manual that contain the tables below.
From: Ann Fowler
Sent: Tuesday, August 29, 2017 7:16 AM
To: Ronald Straka <rstraka@Rentonwa.gov>
Subject: FW: Tiffany Park - Pipe Materials
Importance: High
Ron -
Are you okay with switching the deep pipe >20ft material from LCPE to DI? If so, I can make the necessary adjustment to the plans.
~Thanks
Ann Fowler
Civil Engineer II | CED
AFowler@Rentonwa.gov | Phone: (425) 430-7382
P Please consider the environment before printing this email
ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN!
For more information on Electronic Plan Review, please click here <http://secure-web.cisco.com/1cGIu8psn6KNvWLKN6vkjMD6Lfa8nMlT7DCl2Zf5LQOiyR5Pd5PVmqwFRoFdPNUVbZ9YiL-9-by2AGN_KVuXffA7Il3tlLa94n4Fj8xD
eNfUW1xzjWDGAp_WPINI73556-iAhbraV09nE4LUvWR3cIEEg56UzL48ucEIfafGQcWkizfMn1VjlDNRwWRuhVQpI7BjJE4dc3WNENPJgrHv5ZmDSsxFDgqYPOHD1w2jr3xJZPtpRIeQ4TNMMHVwrUPGQwCTuud8YZ5RWSdFED1nUjCdyBUy2XIeMKXKV8tDGTHKvrt
XU-fHvis17w3lTjaUDALuzOVm_JbpqUSdAcxajYw/http%3A%2F%2Frentonwa.gov%2Fpaperless%2F>
From: Barry Talkington [mailto:btalkington@barghausen.com]
Sent: Monday, August 28, 2017 5:08 PM
To: Ann Fowler <AFowler@Rentonwa.gov>
Cc: Tom Barghausen <tbarghausen@barghausen.com>; Randy Weber <rweber@novastardev.com>; Rob Gonia <RGonia@barghausen.com>
Subject: RE: Tiffany Park - Mitigation Plan (Sheets 93-97)
Importance: High
Ann, after further discussion since I left you a voicemail, we think it’s just easier to switch out these pipes with ductile iron. What is going to be the simplest way to note this
so we can get the plans approved?
Barry
From: Ann Fowler [mailto:AFowler@Rentonwa.gov]
Sent: Monday, August 28, 2017 10:58 AM
To: Barry Talkington <btalkington@barghausen.com>
Cc: Tom Barghausen <tbarghausen@barghausen.com>; Randy Weber <rweber@novastardev.com>; Rob Gonia <RGonia@barghausen.com>
Subject: RE: Tiffany Park - Mitigation Plan (Sheets 93-97)
I had the same comment. J Ron was reviewing the WSDOT Specifications and it seems that you are right on the cusp with some of the depths (at approx. 27-ft (ish)). WSDOT allows 15’-25’
so any additional information you can provided would be appreciated.
~Thanks
Ann Fowler
Civil Engineer II | CED
AFowler@Rentonwa.gov | Phone: (425) 430-7382
P Please consider the environment before printing this email
ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN!
For more information on Electronic Plan Review, please click here <http://secure-web.cisco.com/12ffa6dMIYGBHFPtdgjHvHDCx98tfX9RS4BN9YZ8QAI-3r3dqDfkLmQzV6PywaCx9zL1OOAW8vFqNfKYsSd2YOiVLq7J37npIPM_nUpa
o-yl8cWTA1mFiRh9eD14tN5YKd7sPcHadadQyfdkBUsFptvnAmuTs6yD0aE-nEvIItmVHYQPt2dRMduha_MAl5am0mgIZfdI87uFJGj-fNbfZOuohXGSAMYoTN_Qd50OlvENQAZceRdPyHbO2aPNOECD7Lx6l42Zrdiyu05HXhY_QznmlqpJtKNMKtnXEYBBOVm_vx3
UwkXQjIy0BmVsGoqNktUZoNgmu_7WZ7daQokv9Yw/http%3A%2F%2Frentonwa.gov%2Fpaperless%2F>
From: Barry Talkington [mailto:btalkington@barghausen.com]
Sent: Monday, August 28, 2017 10:56 AM
To: Ann Fowler <AFowler@Rentonwa.gov>
Cc: Tom Barghausen <tbarghausen@barghausen.com>; Randy Weber <rweber@novastardev.com>; Rob Gonia <RGonia@barghausen.com>
Subject: RE: Tiffany Park - Mitigation Plan (Sheets 93-97)
I have sent your question to the Contractor to help us get some information on the pipe type. It’s interesting to note that the City of Renton Drainage Manual only questions the depth
when it exceeds 30’ (Page 4-12, Pipe Cover (2))
Go ahead and make a note about the manholes.
Thank you.
Barry
From: Ann Fowler [mailto:AFowler@Rentonwa.gov]
Sent: Monday, August 28, 2017 10:33 AM
To: Barry Talkington <btalkington@barghausen.com>
Cc: Tom Barghausen <tbarghausen@barghausen.com>
Subject: RE: Tiffany Park - Mitigation Plan (Sheets 93-97)
Importance: High
Barry –
One thing that has come up regarding the LCPE 18” and 30” pipes at depths exceeding 20-ft. Do you have any information from the manufacturer that these pipes can be installed at that
depth? Or would you recommend a different pipe material based on the depth?
Also, I need to add a note to the plans that the manholes (cb’s exceeding 18-ft in depth) are type 2 rather than the type 1 as shown. I can add the comments if you are okay with it.
~Thanks
Ann Fowler
Civil Engineer II | CED
AFowler@Rentonwa.gov | Phone: (425) 430-7382
P Please consider the environment before printing this email
ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN!
For more information on Electronic Plan Review, please click here <http://secure-web.cisco.com/1dctXLK4ZwINVinyVR2EpIaDOCZll6GovXmwvOnfVRHSDpCQA_S5o8T6AVAZdMlbRVSFOsw5JGMEPiG0OoAEIv8jPAiLGW9cBRUWv_fr
M9hMzyRZbogQOsTTMgEHjvG0c5s_33fFnj06-lo8XmSlrFMrCDdURQnLflPsorgGrsSto9-8Gj8JQzzIgcSZlLZc9ugN-VxTcirx6L2PDhDNiVe8oIDweyZs05UwD77bAqt0pnm9_ja_btBq0h6i726vz-_Du58Bg_DM_KVTg9ydsjg8Ds1-znMpaCoQpNmvhkX1Og6
Bu29demEnIeCbRKd6w9pFiWAKp2wgQYq-nuaEtxg/http%3A%2F%2Frentonwa.gov%2Fpaperless%2F>
From: Barry Talkington [mailto:btalkington@barghausen.com]
Sent: Friday, August 25, 2017 8:18 AM
To: Ann Fowler <AFowler@Rentonwa.gov>; Mona Davis <MDavis@Rentonwa.gov>
Cc: Tom Barghausen <tbarghausen@barghausen.com>
Subject: RE: Tiffany Park - Mitigation Plan (Sheets 93-97)
No. I made those changes last night after receiving Mona’s email. Not sure why the time stamp on my email is 8:12 am. Must be your server.
From: Ann Fowler [mailto:AFowler@Rentonwa.gov]
Sent: Friday, August 25, 2017 8:15 AM
To: Barry Talkington <btalkington@barghausen.com>; Mona Davis <MDavis@Rentonwa.gov>
Cc: Tom Barghausen <tbarghausen@barghausen.com>
Subject: RE: Tiffany Park - Mitigation Plan (Sheets 93-97)
Barry –
Have these changed since you sent them to Mona yesterday?
~Thanks
Ann Fowler
Civil Engineer II | CED
AFowler@Rentonwa.gov | Phone: (425) 430-7382
P Please consider the environment before printing this email
ELECTRONIC PLAN SUBMITTAL AND REVIEW HAS BEGUN!
For more information on Electronic Plan Review, please click here <http://secure-web.cisco.com/1PUg0GARwLtlfRzow5xx73CQ_omj2BTWIVmqAFEnP0zxayLXk_foZkB7kxCiP-zsAkJLP5YEz8Zxn-XJxrQy0Iru16YTEn1C3pP6nS_3
IzcfXiB4fneqWZMJyfmREO2t0prTUGiGhAgR9-p138WVrhgnnvsFcyQ2EQcND9INxOOYP8ZAfwWWPm2GmC3kZJXf2urs9CWs_pY7O2w7UWYyN2j6v5KGqQeSTjxCztrK9kCiwVUTSRl1zb3n3chrwrCFMWbJR96ElY9htc-QKEC1N6qi3xi0OF82bhTlCxJ9RB3VEXa
RvrTtQzR5nB5V3sAooDAtMM568EA8QYiPFeTDagw/http%3A%2F%2Frentonwa.gov%2Fpaperless%2F>
From: Barry Talkington [mailto:btalkington@barghausen.com]
Sent: Friday, August 25, 2017 8:12 AM
To: Mona Davis <MDavis@Rentonwa.gov>
Cc: Ann Fowler <AFowler@Rentonwa.gov>; Tom Barghausen <tbarghausen@barghausen.com>
Subject: RE: Tiffany Park - Mitigation Plan (Sheets 93-97)
Importance: High
Here are the revised sheets. See comments below.
Barry
From: Mona Davis [mailto:MDavis@Rentonwa.gov]
Sent: Thursday, August 24, 2017 4:49 PM
To: Barry Talkington <btalkington@barghausen.com>
Cc: Ann Fowler <AFowler@Rentonwa.gov>
Subject: Tiffany Park - Mitigation Plan (Sheets 93-97)
Hi Barry…I am reviewing the latest construction plans provided to Ann this week and have some concerns with the Mitigation Plan (Sheets 93-97) that I failed to notice when we met:
· Sheet 93 & 94 are using what appears to be King County CAPA sign details. This detail should be replaced with the City’s Native Growth Protection Area signage per 4-3-050
and City approved sign details (attached). Details replaced with the detail you provided.
· Sheet 94 has misspelled CRITICAL. Detail was replaced, therefore the spelling was corrected.
· Sheet 95 includes Tract S in a wetland buffer for mitigation planting, which I believe is in error. The mitigation plantings in Tract S are outside of the wetland buffer.
Before the creation of the Critical Area Tracts this areas was being restored due to the disturbance created with the plat improvements. Even though this area is outside of any wetland
buffer we are still replanting due to the disturbances. The area of this disturbance is not counted for any kind of buffer mitigation, it is simply because there was disturbance in
this open space tract.
I’m not sure how best to proceed…if it’s possible to quickly correct these items and replace these specific sheets or what is most efficient. I’ve copied Ann to weigh in on this. I’m
on vacation next week so hoping to get this wrapped up tomorrow. J
Thanks!
Mona
Mona Davis
SENIOR PLANNER
City of Renton | Community & Economic Development
1055 S. Grady Way | 6th Floor | Renton, WA 98057
425 430-7246 <tel:425%20430-7290> | Fax: 425 430-7231 <tel:425%20430-7231>