HomeMy WebLinkAboutP_Traffic_Control_Plan(TCP)_105090359_V1_181113#1825FERNDALE AVE SESE 18T
H
P
L
HH116
16 16161616STOPFLAGGE
R
STOPFLAGG
ER W2
0
-
7
A
1
0
0
'
1
0
0
'
1
0
0
'ROADWORKAHEADW2
0
-
1
W2
0
-
4 ONE LANEROADAHEADW20-7A100'100'100'ROADWORKAHEADW20-1W20-4ONE LANEROADAHEADW20-7A100'100'100'RO
A
D
WO
R
K
AH
E
A
D
W20-1W20-4ONE LA
N
E
ROAD
AHEAD RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURECHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#1050903591825 Ferndale Ave SE, Renton,WANovember 5, 2018binyam.yallew@pse.com(425) 424 7809SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.