Loading...
HomeMy WebLinkAboutMFP18006589DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18006589 IVR Number: 18006589 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :11/30/2018Application Date:1828700150Parcel Number:1824 NE 16TH ST Permit Type:12/07/2018Issue Date:Franchise Permit Work Class:12/07/2019Expiration Date:Minor Utility Job Number:101114558Franchise Type:Electric Description:Replace handhole and install new UG electric service on private property. One pole removed. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101114558 Anish Kumar 253-208-2183 anish.kumar@pse.com 1824 NE 16th St 98056 101114558 Occupying N bound lane of Kennewick Ave NE for crew to replace handhole and install new UG electric service on private property. No pavement cuts anticipated. Restoration per City of Renton standards. Potelco Inc.253-208-2183 BL005109 Poteli*227PL 11/16/2018 MFP18006589 Scott Warlick 12/6/2018 Holly Powers 12/7/2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101114558 PSE/Potelco Inc. Castalia Simon 253-234-6434 6905 S 228th St, Kent, WA 98032 castalia.simon@pse.com 1824 NE 16th St TBD 12/10/2018 Anish Kumar 11/16/2018 MFP18006589 Scott Warlick 12/6/2018Monday - Friday 8:00AM - 3:30PM SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). #1824 111111111616 1111 NE 16TH ST KENNEWICK AVE NEP01R4-7BRIGHTKEEPFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKmaintain (2) 12' lanes minimumROAD WORK AHEAD W20-1RIGHT SHOULDER CLOSED W21-5aRW1-4L100'X'100'M6-2USE MAXIMUM AVAILABLE SPACE FOR SIGNS ROADWORKAHEADW20-1 ROADWORKAHEADW20-1ROADWORKAHEADW20-1W1-4R100'100'CUL-DE-SAC CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY JOB#101114558 1824 NE 16th St, Renton, WA October 29th, 2018 patrick.byrne@pse.com 425-424-6618 Sheet 1 of 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY ROW ROW MFP18006589 SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map 47.5065, -122.1944 Owner / Developer Contact Info officeATTN: Todd Nguyen 311 S Tillicum St Renton, WA 98057 Todd Nguyen 509-869-1575 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 2018 212 76 133 0 3 0 212 79 133 HP Svc/MSA HP Main Distribution Pole Removal HH Replace Perm. Service Superior ORDER#NOTIF# PWR PROJECT PHASE 108108517 101114559506308581 108108516 108108515 101114558506196016 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT FEET ADDED: 0 CABLE AND CONDUIT DIAGRAM 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 4800 SQ. FT 200 AMPS ELECTRIC 16 KW 140A 2.2% 2.8% 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Castalia Simon 206-247-9089 Castalia.Simon@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X SCALE: 1" = 50'101114558UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP of Castalia Simon 206-247-9089 9/10/18 Fred Watson 253-437-6743 9/10/18 Fred Watson 253-437-6743 9/10/18 Yes N/A Nguyen Single Family Resident OH to UG Conversion, New UG Service Line 1824 NE 16th St, Renton, WA 98056 101114558 AS NOTED 1 KING CSPSKCPM SE 5-23N-05E 2305E020 2305E040 2305E020 HIG-15 1 AT HH01: EXISTING 318774-166388 REMOVE EXISTING HAND HOLE -INSTALL 17" X 30" PE SECONDARY HAND HOLE PER STD 6050.2000 (HH16350) -INSTALL 3 - 4 POS #10-350KCMIL CONNECTION BARS (FARGO) AT M01: NEW SET NEW 200A RESIDENTIAL METER AT P01: EXISTING 318774-166388 REMOVE OH SERVICE LINE ON POLE REMOVE EXISTING 35' CL5 SECONDARY POLE REMOVE SECONDARY RISER UG SECONDARY LINE BEING USED FOR TEMP WILL REMOVE LATER SPAN NOTES FROM HH01 TO M01 -INSTALL (1) RUN' 4/0 AL TPLX SERVICE ±50' ____' ACTUAL DEVELOPER & CUSTOMER NOTES: THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 -REQUIRED TO PROVIDE & INSTALL 1-3" DISCONTINUOUS SCHEDULE 40 PVC &21'8,7)520++720 “ -REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLYESTER MULE ROPE IN ALL CONDUITS FROM HH01 TO M01 -REQUIRED TO PROVIDE 6' X 6' WORK PIT & 3/4 CUBIC YARD OF 5/8" MINUS AT HH01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 3/4 CUBIC YARD OF SAND AT M01 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION -RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING kWh Mtr Elec. Mtr Base 12" Min 36" Typical 24" to 36" Max Conduit Depth Power Cable Conduit Customer Provided 3" Schedule 40 Grey PVC Regulator Vent Utility-Provided Gas Meter Assembly Min 36" Customer Provided Conduit Stakes 48" 48" Top View 4' 2 1/2" Conduit Service Riser from Gas Service Lines 12" Minimum Clearance Customer Provided Drainage Pipe Work Pit Dimensions Electric & joint Utility 4' MTR BASE DETAIL SCALE: NONE PSE 1730 POLYETHELYNE HANDHOLE PLAN VIEW 2" APPROX 30" APPROX 17"ELECTRIC 6' PENTABOLT LOCK COVER 6' 18" SIDE VIEW4" X 4" KNOCKOUT (2 PLACES) APPROX 27"APPROX 40"20" CONDUITS ENTER FROM BENEATH AT ONE END OF HANDHOLE SINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAIL Not to scale TV & TEL Electric Service Cable in Conduit 3" Schedule 40 Grey PVC Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Separation 12" Min 20" Min JOINT TRENCH DETAIL Electric Service Cable in Conduit (NTS) To Excavated Dirt Pile 36" MINIMUM COVER IN RIGHT OF WAY Backfill for Conduit Free of rocks larger than 8" in diameter) Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL FILTER FENCE DETAIL Not to Scale 0150.3200 SCHEDULE 27 505913430 Job Site PSE PROVIDED & INSTALLED (1) 4/0 AL TPLX SERVICE IN CUSTOMER PROVIDED (1) 3" GRAY SCH40 PVC CONDUIT CUSTOMER TO PROVIDE TRENCH CUSTOMER PROVIDED 3/4 CU YARD SAND CUSTOMER PROVIDED 3/4 CU YARD 5/8" MINUS CRUSH ROCK CUSTOMER PROVIDED 4' X 4' WORK PIT CUSTOMER PROVIDED 6' X 6' WORK PIT 50' 1612 1606 1624 1740 1836 1904 1900 KENNEWICK AVE NENE 16TH ST #6CU#6CU #6CU 318783-166388 50kVA 120/240v 318766-166389 25T CK00311 318766-166409 40T UNK 31' R/W #6CU50' R/W BNBBND 318766-166419 25kVA 120/240v 1908 D/W g 6' gw 12' w J 318774-166388 HH01 M01 P01 Job Site Job Site Job Site Job Site MFP18006589