Loading...
HomeMy WebLinkAboutC_Pre-Bond Quantity Worksheet_181116_v1Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 11/16/2018Date:Date 10/30/2018Prepared by:Project InformationName:Name Benjamin P. Anstey, PEProject Name: Project Name FUPC Sancuary AdditionPE Registration No:PE Registration No. 20614CED Plan # (LUA):##-######Firm Name:Firm Name Anstey EngineeringCED Permit # (U):########Firm Address:Firm Address 8627 NE 180th Street, Bothell, WASite Address:Site Address 3811 NE 21st StreetPhone No.Phone No. 206-303-7639Parcel #(s):Parcel Number 0423059237, 068 and 307Email Address:Email Address benanstey@ansteyengineering.comProject Phase: FOR APPROVALSite Restoration/Erosion Sediment Control Subtotal (a) $3,637.15 Existing Right-of-Way Improvements Subtotal (b) $34,502.88 (b) $34,502.88 Future Public Improvements Subtotal(c) $- (d) $151,002.50 (d) $151,002.50 (e) $- (f) $- Site Restoration $3,637.15 Civil Construction Permit $202,756.81 Maintenance Bond $37,101.08 $- $206,393.96 Minimum Bond Amount is $10,000.00cover all remaining items to be constructed. ** Note: All prices include labor, equipment, materials, overhead and profit. CONSTRUCTION BOND AMOUNT */**(prior to permit issuance)MAINTENANCE BOND */**(after final acceptance of construction)Stormwater & Drainage Facilities (Public & Private) SubtotalBond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2P (a) x 100%R((b x 150%) + (d x 100%))EST1((b) + (c) + (d)) x 20%Bond Reduction2S(e) x 150% + (f) x 100%Construction Permit Bond Amount 3T(P +R - S)1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.