EROSION CONTROL NOTES:
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE
IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER
UTILITY, WATER UTILITY, AND I HANSPORTATION FLANS:
2. BEFORE ANY CONSTRUCTION OFF DEVELOPMENT ACTIVITY
OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD
WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN
ENGINEER_
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF
VEGETATION PRESERVATION AS PRESCRIBED ON THE
PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR
FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN
ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER
DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE
BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE
CLEARING LIMITS SHALL. BE MAINTAINED BY THE
APPLIC NTIESC SUPERVISOR FOP, THE DURATION OF
CONSTRUCTION,
4_ STABILIZED CONSTRUCTION ENTRANCES SHALL BE
INSTALLED AT THE BEGINNING OF CONSTRUCTION AND
MAINTAINED FOR THE DURATION OF THE PROJECT_
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL
WASH SYSTFIVIS OR WASH PADS. MAY RF REQUIRED TO
ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND
TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR
THE DURATION OF THE PROJECT_
5. ALL REQUIRED SEDIMENTATIONIEROSION CONTROL
FACILITIES MUST BE CONSTRUCTED AND IN OPERATION
PRIOR TO I -AND CLEARING ANDIOR CONSTPUCTION TO
PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE
WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES_
ALL EROSION AND SEDIMENT FA ILIT€ES SHALL BE
MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH
TIME THAT CLEARING; ANDIOR CONSTRUCTION IS
COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS
PASSED- THE INIPLEMFNTATION. MAINTENANCE.
REPLACEMENT AND ADDITIONS TO
EROSIONISEDIMENTATION CONTROL SYSTEMS SHALL BE
THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS
DEPICTED ON THIS DRAWING ARE INTENDED TO BE
MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE
CONDITIONS, AS CONSTRUCTION PROGRESSES AND
UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND
SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY
TO ENSURE COMPLETE SILTATION CONTROL ON THE
INSPECTION SCHEDULE:
PROPOSED SITE_ DURING THE COURSE OF CONSTRUCTION,
IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
PERMITEE TO ADDRESS ANY NEW CONDITIONS I'HA I MAY
BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS. AS MAY BE NEEDED, TO PROTECT
ADJACENT PROPERTIES AND WATER QUALITY OF THE
RECEIVING DRAINAGE SYSTEM_
7_ APPROVAL OF THIS FLAN IS FOLD EROSIONlSEDIMENTATION
CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL
OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF
PIPES, RESTRICTORS, CHANNELS_ OR RETENTION
FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY
EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO
DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH
MARCH 30TH} OFF SEVEN nAYS DURING THE DRY SEASON
(APRIL 1ST THROUGH SEPTE€4tBER 30) SHALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER
METHODS (E_G., SEEDING, MULCHING, PLASTIC COVERING.-
ETC-).
9, WET SEASON SEASONAL. EROSION AND SEDIMENT
CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION
SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30
INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY
THROUGH AN ADJUSTMENT PROCESS,
14_ COVER MEASURES WILL BE APPLIED IN CONFORMANCE
WITH APPENDIX D OF THE SURFACE WATER DESIGN
MANUAL.
11, .ANY AREA NEEDING ESC MEASURES, NOT REQUIRING
IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN
SEMEN (7) DAYS DURING NON WET SEASON.
1, THE ESC FACILITIES ON INACTIVE SITES SHALL BE
INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH
OLD WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13_ AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT
BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL
CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING. THE CLEANING OPERAT€ON
SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO THE
DOWNSTREAM SYSTEM.
1. ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR
BASIS.
2_ THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY AND
WITHIN 24 HOURS OF SIGNIFICANT STORMS_ A SIGNIFICANT STORM IS ONE
WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR LESS.
3, THE CITE' MAY REQUIRE THAT A WPITTEN RECORD OF THESE REVIEWS BE
KEPT ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 49 HOURS-
HYDROSEEDING NOTES:
1_ HYDROSEEDING SHALL_ BE APPLIED TO ALL AREAS DISTURBED BY
CONSTRUCTION ACTIVITIES UNLESS OTHERWISE NOTED.
Z, HYDROSEEDING TO BE AS SPECIFIED IN LANDSCAPE
SPECIFICATIONS.
_ APPLICATION TO BE 100 LBSIACRE.
4, 500 LBSIACPE 10-20- 0 FERTILIZED, 2000 LBSIACRE MULCH AND 40
LBSIACRE SOIL STABILIZED TO BE APPLIED WJTH SEED MIXTURE.
5. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL
REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY
TO FOSTER AND PROTECT THE FOOT STRUCTURE, CONTRACTOR
SHALL ENSURE PROPER ROOT GROWTH REGARDLESS OF
PLANT€NG SCHEDULE.
6. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30.
ARMORING OF THE SEED WLL BE NECESSARY. (EG, GEOTE TILES,
MUTE MAT, CLEAR PLASTIC COVERICNG.)
7_ BEFORE SEEDING_ INSTALL NEEDED SURFACE RUNOFF CONTROL
MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES.
SVVAI FS, LEVEL SPREADERS AND SEDIMEINT BASINS,
8_ THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE,
FOLLOWING SURFACE ROUGHENING. PERFORM ALL OPERATIONS
ACROSS OR AT FIGHT ANGLES TO THE SLOPE,
9_ FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS
RECOMMENDATIONS_ AMOUNTS USED SHOULD BE WNIMIZED,
ESPECIALLY ADJACENT TO WATER BODIES AND VVETLAN IDS_
10_ SEE SPECIFICATIONS FOR HYDROSEED MIXTURES.
Know what, s beIow.
Call before you dig.
AHBL PROJECT 2170057.10
NOTICE
uMU110H OF W MD." 99LL rhNAM£ THE
MMOAAu VA NO ZWW Ra na W
M OMM ENT DOES ROT WKWE FROM FESWOM
00� MTS N R_ TIC D4CL" 5 FOR USE
par orn n'K mgcT KoTm w nE nTLE 9Lw
AN IS 4D4 TO 6E OFED FOR RUA M"R OR
AWTM TO TMT PM0 OR FOR WY OM MECT.
MULCHING NOTES:
14_ ANY PERMANENT RETENTIONIDETENTION FACILITY USED AS
A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH
THE NECESSARY EROSION CONTROL MEASURES AND
SHALL PROVIDE ADEQUATE STORAGE CAPACITY.
15. PRIOR TO THE BEGINNING OF THE WET SEASON {OCT, 1 ],
ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY
WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE
WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED
WITHIN ONE WEEK OF THE BEGINNING OF THE WET
SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED
AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE
SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
16_ ALL TESL MEASURES MUST BE REMOVED AFTER
CONSTRUCTION AND SITE IS STABILIZED_
17_ DISTURBED AREAS UNWORKED FOR 7 CONSECUTIVE
WORKING DAYS SHALL BE STABILIZED WITH COVER
MEASURES EXCEPT LURING THE WET SEASON DURING
THE WET SEASON DISTURBED AREAS UNWORKED FOR TWO
CONSECUTIVE WORKING DAYS SHALL BE STABILIZED WITH
COVER MEASURES_
18_ STOCKPILES AND STEEP CUT AND FILL SLOPES SHALL BE
PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS_
19, COVER MATERIALS SUFFICIFNT TO COVER ALL DISTURBED
AREAS SHALL BE STOCKPILED ON SITE,
20_ ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET
SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE
BEGINNING OF THE WET SEASON .
21 _ MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS.
2_ FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY
STALES) PER ACRE OF DISTURBANCE SHALL BE
STOCKPILED ON SITE.
2_ CONSTRUCTION ROAD AND PARKING LOT STABILIZATION
ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS
UNDERLAIN BY COARSE -GRAINED SOIL_
4. ANY RUNOFF GENERATED BY IDEWATERING SHALL BE
REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH
APPROPRIATE DISCHARGE AUTHORIZATION). PORTABLE
SAND FILTER SYSTEMS, OR HOLDING TANKS,
1. MULCH MATERIALS USED SHALL BE HAY OR STRAW, AND SHALL BE
APPLIED AT THE RATE OF 2 TONS/ACRE.
2, MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED
SLOPES GREATER THAN :1_
3. MULCHING SHALL BE USED JMMEDIATELY AFTER SEEDING OR IN
AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON.
4_ ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1_
SOIL NOTES:
A_ THE SOIL MOISTURE HANDLING CAPACITY OF ALL NEW PERVIOUS
SURFACING THAT, AT PROJECT COMPLETION, WILL NOT BE
COVERED BY IMPERVIOUS SURFACING OR INCORPORATED INTO A
DRAINAGE FACILITY MUST BE PROTECTED_ THE DUFF LAYER AND
NATIVE TOPSOIL SHALL BE RETAINED IN AN UNDISTURBED STATE TO
THE MAXIMUM EXTENT FEASIBLE.
B, ANY DUFF LAYER OR TOPSOIL REMOVED DURING GRADING SHALL
BE STOCKPILED ONSITE IN A DESIGNATED, CONTROLLED AREA NOT
ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS_ THE
MATERIAL SHALL BE REAPPLIED TO OTHER PORTIONS OF THE SITE
WHERE FEASIBLE.
G. THE SOIL. IN ANY AREA THAT HAS BEEN COMPACTED OR THAT HAS
HAD SOME OR ALL OF THE DUFF LAYER OR UNDERLYING TOPSOIL
REMOVED SHALL BE AMENDED TO MITIGATE FOR LOSS OF
MOISTURE HOLDING CAPACITY_ THE AMENDMENT SHALL TAKE
PLACE BETWEEN MAY 1 AND OCTOBER 1. REPLACED TOPSOIL SHALL
BE A MINIMUM OF 8 INCHES THICK, REPLACED TOPSOIL SHALL HAVE
AN ORGANIC MATTER CONTENT BETWEEN 8 ANL 13 PERCENT DRY
WEIGHT AND A PLC SUITABLE FOR THE PROPOSED LANDSCAPE
PLANTS_ SEE LANDSCAPE PLANS
■
T A o, D N A• SEATTLE - SPOKANF -TRI-CITIES
22' 5 NoMil 30U1 VW. We 300 TaOuM. WA NC3
253.3932422 Ta. 253,3 2572 W WPMJM.Dxr Y.' ,
GENERAL NOTES:
1. DEMOLITION: IT IS THE INTENT OF THE WORK UNDER
THIS CONTRACT TO INCLUDE THE DEMOLITION OF ALL
EXISTING SITE IMPROVEMENTS AS JNDICATED BY THIS
DRAWING OR AS REQUIRED FOR NEW CONSTRUCTION_
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY
REVIEW THE SITE CONDITIONS AND TO CORRELATE
THESE OBSERVATIONS WITH THE PROJECT WORD AND
INCLUDE ALL NECESSARY DEMOLITION, WHETHER
SHOWN OR NOT, AND INCLUDE ALL SUCH COSTS IN THE
BARE BID_
2_ CLEARING_ IT IS THE INTENT OF THE WORK UNDER THIS
CONTRACT TO CONDUCT ALL CLEARING NECESSARY TO
BE ABLE TO COMPLETE ALL THE WORK OF THIS
PROJECT. CONTRACTOR SHALL PERFORM ADDITIONAL
CLEARING TO CONSTRUCT ONSITE AND OFFSITE
IMPROVEMENTS IF NECESSARY,
3_ GENERAL CONTRACTOR SHALL PROVIDE AN ESC
SUPERVISOR WHO IS A CERTIFIED EROSION AND
SEDIMENT CONTROL LEAD.
4_ CONTRACTOR SHALL CON PORM I'o ALL REQUIREMENTS
OF THE NPDES UNDER THE DOE'S GENERAL PERMIT
FOR STORMWATER DISCHARGE FROM CONSTRUCTION
ACTIVITIES AND THE SWPPP. CONTRACTOR IS
RESPONSIBLE FOR MAINTAINING ALL REQUIRED
PECORDS.
5. CONTRACTOR SHALL LEGALLY DISPOSE OFF THE
OWNER'S PROPERTY, ALL DEMOLISHED AND REMOVED
MATERIALS, UNLESS INDICATED OTHERWISE.
6. BACIKFILL AND COMPACT ALL VOIDS AND DEPRESSIONS
OCCURRING AS A RESULT OF DEMOLITION ACTIVITIES.
SEE SPECIFICATIONS FOR ALLOWABLE BACKFILL
MATERIALS.
7. REMOVE EXISTING SOD AND TOPSOIL AS NECESSARY
TO PROVIDE IMPROVEMENTS. CONTRACTOR SHALL
DISPOSE OF EXCESS SOD AND TOPSOIL OFFSITE.
8, CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF
CONSTRUCTION SEQUENCE:
1, ARRANGE AND ATTEND PRE -CONSTRUCTION MEETING WITH CITY OF RENTON_ OWNER,
CONTRACTOR, ESC LEAD, AND ENGINEER_ STAKE CLEARING LIMITS PRIOR TO THIS
MEETING.
2. POST NOTICE OF CONSTRUCTION ACTIVITY SIGN WITH NAME AND PHONE NUMBED OF
EC LEAD_
3, FENCE CLEARING LIMITS AND TREE PROTECTION AREAS,
4. INSTALL CATCH BASIN SEDIMENT PROTECTION,
S. INSTALL PERIMETER PROTECTION (SILT FENCE, OR OTHER MEASURES) WHERE
SPECIFIED ON THE ESC PLAN AND/OR REQUIRED BY THE CITY INSPECTOR_
6_ GRADE AND STABILIZE CONSTRUCTION ENTRANCE_
7_ DEMOLISH EXISTING PAVEMENT AREAS AS INLOIQATED ON FLAN.
8, CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR SWALES, CHECK DAMS,
TEMPORARY SEDIMENT POND, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING
FOR PROJECT DEVELOPMENT_
9_ PROVIDE PLASTIC COVERING ON ALL EXPOSED SLOPES 5H:1 V OR GREATER_ ALL FILLS
MUST BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL
ENGINEER.
10_ MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF F FNTON
STANDARDS, NPDES PERMIT AND EROSION AND SEDIMENT CONTROL REPORT,
11 _ RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR
INSTALL NEW MEASURES, SO THAT, AS SITE CONDITIONS CHANGE, THE EROSION AND
SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON EROSION
AND SEDIMENT CONTROL REQUIREMENTS,
12- ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT
BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCT 1 TO APR 30) OR SEVEN
DAYS DURING THE DRY SEASON (MAY 1 TO SEPT 30) SHALL BE IMMEDIATELY
STABILIZED WITH THE APPROVED ESC MEASURES_
13_ ROUGH GRADE SITE.
14_ CONSTRUCT PERMANENT STOPMWATER FACILITIES_
15_ CONSTRUCT ALL OTHER SITE IMPROVEMENTS.
16. SEED OIL 501) ANY AREA TO REMAIN UNWORKED FOR MORE THAN 30 DAPS,
17 UPON SUBSTANTIAL COMPLETION_ ALL DISTURBED AREAS MUST BE STABILIZED.
EROSION AND SEDIMENT CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL
APPROVAL IS OBTAINED FROM THE CITY OR RENTON_
1 REVISED PER CITY COMMENTS
NO_ REVISION
SURVEYED:
G. FOLLANSBEE
DESIGNED:
E. SCHEND
DRAWN:
F_ KATONA
BJS 717i17 SMC CHEC-ED:
W. FIERST
BY DATE APPR FFPRMD:
5_ COMFORT
OME INCH
,47 fULL 5CALE
IP NOT ONE IN04
WALE AOMRDINGLY
TESL FACILITIES. CONTRACTOR IS RESPONSIBLE FOR
CONSTRUCTION OF ADDITIONAL FACILITIES INCLUDING
BUT NOT LIMITED TO FILTER FENCE, CATCH BASIN
PROTECTION, SWALES, MULCHING AND SEEDING_
9, RELOCATE EROSION CONTROL MEASURES OR INSTALL
NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE
THE EROSION CONTROL IS ALWAYS IN ACCORDANCE
WITH THE MINIMUM CITY OF RENTON TESL
REQUIREMENTS.
10_ SEDIMENTS TRACKED ONTO PAVED SURFACES SHALL
BE REMOVED BY SWEEPING. SEDIMENTS SHALL NOT BE
WASHED DOWNSTREAM. SPRAY EXPOSED SOILS WITH
WATER TO PREVENT DUST. RUNOFF SHALL NOT BE
CREATED BY SPRAYING, EROSION CONTROL MEASURES
SHALL BE PROVIDED THROUGHOUT CONSTRUCTION,
WHEEL WASHES SHALL BE PROVIDED IF THE NOTED
EROSION CONTROL MEASURES ARE NOT ADEQUATE TO
PREVENT SEDIMENTS FROM ENTERING THE ROW
11_ CONTRACTOR SHALL EXCAVATE AND FILL AS
NECESSARY TO ACHIEVE SUBGRADES IN LAWN AND
PLANTER BEDS REQUIRED BY THE LANDSCAPE PLANS.
12. PROTECT EXISTING UTILITIES WITHIN THE WORK LIMITS
NOT SPECIFICALLY INDICATED FOR DEMOLITION,
ADJUST EXISTING UTILITIES TO FINISHED GRADE.
13_ CONTRACTOR SHALL INCLUDE IN BID REMOVAL OF ALL
TESL MEASURES AT COMPLETION OF PROJECT,
14_ SEE LANDSCAPE FLANS FOR FINAL VEGETATED
SURFACING.
15, CONTRACTOR IS REQUIRED TO USE EXISTING TRUCK
HAUL ROUTES AS NOTED PER CITY OF RENTON
ORDINANCE 5339_ ORDINANCE 5339 SPECIFIES THAT
TRUCES TAKE THE MOST DIRECT ARTERIAL ROUTE TO
OR FROM ONE OF THE DESIGNATED TRUCK ROUTES.
PARK AVENUE N. ADJACENT TO THE SITE IS THE
NEAREST TRUCK ROUTE
EXISTING LEGEND:
SURVEY
1�1
SET NAIL AND WASHER
MISCELLANEOUS
BOLLARD
SIGN AS NOTED
FENCE
SANITARY SEWER
SANITARY SEWER
MANHOLE
SANITARY SEWER
CLEANOUT
- - -
SANITARY SEWER LINE
STORM DRAINAGE
❑
STORM CATCH BASIN
STORM €MANHOLE
o
ROOF DRAIN
- - - - P —
STORM LINE!
NATURAL GAS
GAS VALVE
OAS LINE
POWER
1
ELECTRICAL. VAULT
0
JUNCTION BOX
LUMINAIRE
- - - - F
ELECTRICAL LINE
COMMUNICATION LINE
TREES
C=CEDAR
C=COTTONWOOD,
M=MAPLE,
U= UNKNOWN
SURFACING
CONCRETE
ASPHALT
CONTOUR MAJOR
INTERVAL
- - - - - - - - - -
CONTOUR MINOR
INTERVAL
PROPERTYIRIGHT-OF-WAY
LINE
VaT1CAL. Rkz 1968
HORIZONTAL: NOD 1963/1991
DATUM
CITY OF
RENTON
Planning/Building,/Public Works Dept.
16. THE SITE TOPOGRAPHIC SURVEY WAS COMPLETED BY
THE OWNER'S CONSULTANT_ PRIOR TO CONSTRUCTION
AND PROVING MATE RIAL, THE CONTRACTOR SHALL
REVIEW THE SURVEY AND PROVIDE THE OWNER A
SIGNED LETTER INDICATING THE CONTRACTOR
AGREES WITH THE CONDITIONS DOTED BY THE
SURVEY, IF THE CONTRACTOR [DOES NOT AGREE WITH
THE CONDITIONS OF THE SURVEY, THE CONTRACTOR
SHALL COMPLETE AN INDEPENDENT 3RD PARTY
SURVEY AND PROVIDE IT TO THE 0VINIER FOR REVIEW
PRIOR TO CONSTRUCTION OR MOVING MATERIAL.
TESL & DEMOLITION LEGEND:
EXISTING FEATURE TO BE DEMOLISHED
EXISTING FEATURE TO REMAIN
SAWCUT LINE
WORK LIMITS
SILT FENCE (COLS STD. PLAN 214.00)
INTERCEPTOR SWALE
(COR STD, PLAN 217.10)
CHECK LAM
(COR STD, PLAN 217.40)
CATCH BASIN FILTER
(COR STD, PLAN 216,30)
STABILIZED CONSTRUCTION ENTRANCE
(COR STD, PLAN 215.10)
DEMOLISH EXISTING PAVEMENT
D
P
M• MM• = MM!
BLACK LINES & HATCHES
ANY LINETYPE
GRAY LINES & HATCHES
ANY LINETYPE
R-395903
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING SURFACE WATER UTILITY 0
Fitz -Jambs 07/ 11 017 Ul I r tr ka 0 1 1 / 01
LINDBERH HIGH SCHOOL
SOUTH PARKING LOT IMPROVEMENTS
RENTON SCHOOL DISTRICT
TESL NOTES & LEGEND
06 08 201
PAGE!
C2. 1
3 17
ON
IN
U)
r
uj
2
IJJ
0
Ir
IL
0
7)
0
J
0
0
c)
U)
0
LU
m