HomeMy WebLinkAboutMFP18006587DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18006587
IVR Number: 18006587
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :11/30/2018Application Date:3342103464Parcel Number:1616 NE 30TH ST
Permit Type:12/14/2018Issue Date:Franchise
Permit Work Class:12/14/2019Expiration Date:Minor Utility
Job Number:101114032Franchise Type:Electric
Description:Replace UG terminations and splices along with replacing three primary cables in conduit spanning 803'. This project
also requires a WSDOT permit. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101114032
Anish Kumar
253-208-2183
anish.kumar@pse.com
1616 NE 30th St 98056 101114032
Crew to replace UG terminations and splices along with replacing (3) primary cables in conduit
spanning +/- 803'. This project also requires a WSDOT permit which was applied for in September. Will require
closure of one Westbound lane of Kennewick Pl NE approaching I-405 and another closure *continued below
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
11/21/2018
MFP18006587
Scott Warlick 12/6/2018
Justin Johnson 12-7-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101114032
PSE/Potelco Inc.
Miguel Reyna 425-748-6365
6905 S 228th St, Kent, WA 98032
miguel.reyna@pse.com
1616 NE 30th St
TBD
1/3/2018
Anish Kumar 11/21/2018
MFP18006587
Justin Johnson
12-7-2018
9:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
NE 30TH STKENNEWICK PL NE405405111111112121 BUSONLYPV2SW1ARR
W
-
B
RD
BUSSTOPW4-2LRIGHT
LANECLOSEDAHEAD
W20-5
R100'100'100'ROADWORKAHEADW20-1
S
I
D
EW
A
L
K
C
L
O
S
E
D
R9-9SIDEWALKCLOSEDR9-9ARCOROADWORKAHEADW20-1100'R9-11SIDEWALKCLOSEDAHEAD
NE 29TH
STR9-11SIDEWALKCLOSEDAHEADDETOURM4-9bCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040PSEPUGETSOUNDENERGYJOB#1011140321616 NE 30th St, Renton, WAAugust 14, 2018ina.ustemchuk@pse.com425-398-6063SHEET 1 of 2Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063NNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWMFP18006587
NE 30TH ST4054051111112121 BUSONLYARCOPARK AVE NPO1PV110ARRW-BRDW4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1SIDEWALKCLOSEDR9-9SIDEWALK
CLOSEDR9-9DETOURM4-9bR9-11SIDEWALKCLOSEDAHEADDETOURM4-9bARCOCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040PSEPUGETSOUNDENERGYJOB#1011140321616 NE 30th St, Renton, WAAugust 14, 2018ina.ustemchuk@pse.com425-398-6063SHEET 2 of 2Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063NNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWMFP18006587
WORK SITE
319238-166345
NEW AØEHR400
NEW BØEHR401
NEW CØEHR402ROWROWROWROWROWROWROWROWROWROW
R
O
W
RO
W
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROW 319230-166277
319228-166270
X0607
R
HLWS
319235-166342
U0329
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A 108108039
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
TUT Retirement
Job Order
Distribution
HP Main
HP Svc/MSA
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)101114032Owner / Developer Contact Info
officeATTN:
N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Correct QC Checklist(s) reviewed.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE MAP#: 2405E136
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 50' MAP#: 2405E127
11445846 101114032
SITE MAP
SCALE: 1" = 50'
THOMAS GUIDE
626-D4
9.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
POWER GENERAL NOTES SITE SPECIFIC NOTES
SW1 (319235-166342)
-REPLACE (3) 750 MCM TERMINATIONS ON P0S. (TER750C) PER STD. 6041.3000
PV1 (319230-166277)
-REMOVE (3) 750 MCM HAMMERHEAD SPLICES
-INSTALL (3) NEW 750 MCM STRAIGHT SPLICES (SPL750) PER STD. 6041.2000
PV2 (319229-166341)
-REMOVE (3) 750 MCM HAMMERHEAD SPLICES
**CREW TO PULL NEW CABLE STRAIGHT THROUGH VAULT TO SWITCH
**EXISTING RUN OF 1/0 CABLES IN VAULT. WILL NEED TO DE-ENERGIZE AT J-BOX
**COMMERCIAL OUTAGE REQUIRED
P01 (319228-166270)
-REPLACE (3) 750 MCM TERMINATIONS (TSU3NF1) PER STD. 6043.1020
**SHRUB REMOVAL REQUIRED ENCOMPASSING ENTIRE AREA BETWEEN SW1 & PV2
SPAN SPECIFIC NOTES
SW1 TO P01
-REPLACE B/O 750 MCM FEEDER CABLES IN CONDUIT, L = ± 803'
-INSTALL NEW CABLE TAGS AØEHR400, BØEHR401, CØEHR402
CIRCUIT FEET ADDED: NONE
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
M. REYNA 425-748-6365 08/06/18
S. FOX 714-893-2405 08/06/18
D. FIELDS 714-893-2405 08/06/18
N/A RENTON / WSDOT
HIG-15, CREW2, 1616 NE 30TH ST
REPLACE B/O FEEDER CABLES
1616 NE 30TH ST, RENTON, 98056
ASPLUNDH CONSTRUCTION CORP.
O-443883
101114032
AS NOTED 1/1
KING FAC-SVC
SW 32-24N-05E
2405E127 2405E136 HIG-152405E127
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:MIGUEL REYNA
425-429-1201
MIGUEL.REYNA@PSE.COM
PRIMARY CABLE REMOVAL TABLE
LOCATION PRIMARY CABLE
ASBUILT INFORMATION
Cable LENGTH
Design
(ft)
Cable Numbers Please Record Foreman - Complete
FROM TO Size A B C Manufacturer Year Actual Amount Installed (Conduit & Cable)
SW1 P01 750 803'31106 31107 31108
PRIMARY CABLE TABLE - INSTALL
LOCATION CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO QT
Y.
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIG
N
LENGT
H (FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CABLE
SW1 PV1 3 2 750 755'-0"EHR400 EHR401 EHR402
PV1 P01 3 1 750 48'-0"EHR400 EHR401 EHR402
TOTAL 803'-0"
FOREMAN PLEASE FILL IN
YEAR MANUFACT:
CABLE #:
MANUFACTURER:
LENGTH:
EHR400
FOREMAN PLEASE FILL IN
YEAR MANUFACT:
CABLE #:
MANUFACTURER:
LENGTH:
EHR401
FOREMAN PLEASE FILL IN
YEAR MANUFACT:
CABLE #:
MANUFACTURER:
LENGTH:
EHR402
MFP18006587