Loading...
HomeMy WebLinkAboutAdden 1 � CAG-17-075,Adden#1-18 Washington State �� Department of Transportation Supplemental Agreement Organization and Atldress Number 1 BergerABAM Inc. Original Agreement Number 33301 Ninth Avenue S., Suite 300 Federal Way,WA 98003 CAG-17-075 Phone: 206-431-2300 Project Number Execution Date Completion Date TED4003844 5/25/2017 12/31/2019 Project Title New Maximum Amount Payable N 27th Place Bridge Scour Repair $127,218.00 Description of Work Extend the contract completion date.Include additional scope and budget to modify the design of the scour repairs as a result of the deletion of the sheet pile wa112 from the construction contract due to difficult pile driving conditions. Increase budget for construction management and inspection for added working days to remove sheet pile obstructions and other changes. Increase budget for inspection for extended week day working hours and weekend work in order to reopen street as quickly as possible after the labor dispute between the IUOE 302 and AGC of Washington delayed the street reopening for several weeks. The Local Agency of Citv ofRenton desires to supplement the agreement entered in to with BergerABA1�t�n�. and executed on 5/25/17 and identified as Agreement No. CAG-1�-o�s All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: The Scope of Work of the Original Agreement is supplemented to include the attached Exhibit A-1 �� Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days f01'COt71p12tI0tl Of th2 WOI"k t0 �2ad: Change contract completion date from December 31,2018 to December 31,2019 ��� Section V, PAYMENT, shall be amended as follows: See attached Exhibit"A"and Exhibit D-L The maximum amount payable is increased by$27,534 from$99,684 to$127,218 as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. gy: Ber erABAM gy: Gregg Zimmerman,Public Works Administrator Cf!/"'�+� ' Consultant Signa ure � Ap i A t nty Signature �2.. �l'�L� �,�I � �e DOT Form 140-063 Revised 09/2005 Exhibit "A" Summary of Payments Basic Supplement#1 Total Agreement Direct Salary Cost $2g,297 $9,493 $37,790 Overhead $49,291 $14,615 $63,906 (Including Payroll Additives) Direct Non-Salary Costs $13,608 $578 $14,186 Fixed Fee $g,488 $2,848 $11,336 Total $99,684 $27,534 $127,218 DOT Form 140-063 Revised 09/2005 EXHIBIT A-1 MODIFIES EXHIBIT A OF THE ORIGINAL AGREEMENT SCOPE OF WORK SUPPLEMENTAL AGREEMENT N0. 1 AGENCY: CIN OF RENTON CONSULTANT: BERGERABAM INC. CONTRACT: CAG-17-075 PROJECT: N 27TH PLACE BRIDGE SCOUR REPAIR SUPPLEMENT DESCRIPTION During the course of construction, working days were added to the construction contract for removal of sheet pile obstructions and other changes. The ariginal contract scope and budget was based on the original number of working days in the construction contract. To provide services for the working days added to the construction contract, additional budget for Construction Administration and Inspection (CA&I) services is necessary. The International Union of Operating Engineers (IUOE)loca1302 had a labor dispute with the Associated General Contractors (AGC) of Washington. IUOE 302 went on strike on August 21, 2018 and went back to work on September 7, 2018. This delayed the reopening of N 27th Place by several weeks. In order to reopen the street as quickly as possible after the labor dispute ended, the contractor worked extended week day warking hours and weekends. To provide inspection services during the extended work hours, additional budget for CA&I services is necessary. During sheet pile installation, driving conditions prevented the installation of Wall 2 per the construction contract. As a result,Wa112 was deleted from the construction contract and the design of the scour repairs was revised accordingly. To provide for the revised design of the scour repairs, additional budget for Design Construction Support Services (DCSS)is necessary. TASK 1.0 CONSTRUCTION ADMINISTRATION AND INSPECTION (CA&I) SERVICES Task 1.2 Construction Administration and Inspection No change to the original scope of work for this task.The purpose of this supplement is to provide additional budget for the scope of this task, for the reasons stated above. Refer to E�chibit D-1 for an estimate of the budget required to provide CA&I services for the working days added to the construction contract and extended working hours. City of Renton BergerABAM,A19.0008.00 North 27th Place Bridge Scour Repair Project December 2018 Renton,Washington Exhibit A-1 Page 1 of 2 TASK 2.0 DESIGN CONSTRUCTION SUPPORT SERVICES (DCSS) Task 2.3 Change Orders Task 2.3.1 Elimination of wall 2 and revise design of scour repairs This is a new subtask The CONSULTANT shall provide revised engineering drawings that show the proposed design revisions resulHng from the elimination of sheet pile Wa112. These drawing revisions include, but are not limited to, the following. • Addition of a reinforced, cast-in-place, concrete cutoff wall at the downstream end of the existing culvert • Addition of a log weir at the concrete cutoff wall • Addition of a log weir at the outlet of the culvert, downstream from the concrete cutoff wall • Revised grading plans for the placement of light loose rip-rap and streambed sediment/cobble mixture, resulting from the elimination of sheet pile Wa112 • Location/placement of additional one-man boulders inside the culvert The CONSULTANT shall provide revised material quantities resulting from the changes described above. Refer to Exhibit D-1 for an estimate of the budget required to provide the services described in this new subtask. City of Renton BergerABAM,A19.0008.00 North 27th Place Bridge Scour Repair Project December 2018 Renton,Washington Exhiblt A-1 Page 2 of 2 EXHIBIT D-1 -CONSULTANT FEE DETERMINATION Supplement No 1 -CA plus DCSS Costs N 27TH PLACE CULVERT SCOUR REPAIR PROJECT 1217/2o1s Construction Administration and Inspection (CA&I) Task 1.2 DIRECT SALARY COSTS(DSC)for BergerABAM Personnel Hours Rate Cost 1 Project Manager 8 X $48.77 = $ 390 2 Resident Engineer 24 X $61.32 = $ 1,472 3 Project Inspector 80 X $41.66 = $ 3,333 4 Document Control 40 X $41.03 = $ 1,641 BERGER/ABAM Hours,TOTAL 152 Subtotal Direct Salary Costs(DSC)_ $ 6,836 Salary Escalation-Estimated Salary Escalation Costs are included in above rates $ - Overhead(OH) 153.96% of(DSC+SE)_ $ 10,524 Fixed Fee(FF) 30.00% of(DSC+SE)= 2,051 TOTAL SALARY COSTS(DSC+SE+pH+FF)_ $ 19,411 SUBCONSULTANTS Mayes Testing Engineers Inc.,a Terracon Company(Task 3.0) $ - TOTAL SUBCONSULTANTS- CA8�1= $ - DIRECT NONSALARY COSTS(DNSC) RT/Mo RT Miles Mileage Rate PM Mileage 2 52 $ 0.540 $ 56 RE Mileage 5 52 $ 0.540 $ 140 PI Mileage 10 52 $ 0.540 $ 281 DC Mileage 0 52 $ 0.540 $ - TOTAL REIMBURSABLE EXPENSES (DNSC) _ $ 477 TOTAL CA&I FEE (DSC+SE+OH + FF+ DNSC)_ $ 19,888 DESIGN CONSTRUCTION SUPPORT SERVICES (DCSS) COSTS Subtask 2.3.1 BergerABAM Design Change $ 7,645 SUBCONSULTANTS PanGeo $ - Watershed $ - TOTAL ESTIMATED DESIGN CONSTRUCTION SUPPORT FEES= $ 7,645 TOTAL ESTIMATED AMOUNT FOR CAB�I t DCSS SERVICES FOR SUPPLEMENT 1 = $ 27,534 Page 1 of 2 EXHIBIT D-1 -CONSULTANT FEE DETERMINATION Supplement No 1 -CA plus DCSS Costs N 27TH PLACE CULVERT SCOUR REPAIR PROJECT �2/�/20�8 DIRECT SALARY COSTS(DSC) Personnel Hours Rate Cost 1 Project Manager GB 2.0 X $72.02 = $ 144 2 Project Engineer ST 0 X $78.41 = $ - 3 Civil Engineer BN 30 X $38.22 = $ 1,147 4 Structural Engineer GB 4 X $72.02 = $ 288 5 Designer-CADD LC 24 X $41.20 = $ 989 6 Admin,Clerical 2 X $44.81 = $ 90 Total Hours 62 Subtotal Direct Salary Costs(DSC)_ $ 2,657 Salary Escalation(SE)= 0% of DSC= $ - Subtotal(DSC+SE)_ $ 2,657 Overhead(OH) 153.96% of(DSC+SE)_ $ 4,091 Fixed Fee(FF) 30.00% of(DSC+SE)_ $ 797 TOTAL SALARY COSTS(DSC+SE+OH+FF)_ $ 7,545 DIRECT NONSALARY COSTS(DNSC) Mileage 104 miles @ $ 0.540 $ 56 Inspection EquipmentEquipment Copies $ 44 TOTAL REIMBURSABLE EXPENSES(DNSC)_ $ 100 TOTAL AUTHORIZED AMOUNT = $ 7,645 PAYMENT Se����es w�n be a��e o„ a �SC ,.,wuPrP� eq�aico 2.840 Page 2 of 2