Loading...
HomeMy WebLinkAboutCO 2 CAG-18-157, CO #2-18 CITY OF RENTON Community Services DepaRment CflNTRACT CHANGE OR�ER AGREEMENT �x.to.ioia CONTR�►CT: City of Rento� CAG-18-157 CONTRACTpR: Northwest Playground Equipment,Inc. CHANGE OROER: No.2 SUMMARY OF PROPOSED CHA[VGE: Reason/J ustification: Provide a concrete accessible ramp to playground. DESCRtPTION: Item Qt . Oescription Unit Price Amount N°• w/WSST 1 1 Provide co�crete accessible ramp. $ 3,350.00 $ 3,685.00 Total this Change Order: $ 3,685.� ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE R£VISEO CONTRACT AMOUNT CW/WSST) AMOUNT THIS OROER(W/WSST) TOTALAFfER tHANGE S 85,425.78 $ 85,A25.78 $ 3,685.00 S 89,110.�8 Additianal Calendar Days: Extension of Time.Completion Date is January 31,1019. The payment specified and agreed to in this change order includes every claim by the contrackor for any extre payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of tfie other terms of the original agreement remafn in effea. 516NATURES: Conuactor: � J U • �1n3 �`j1rfL:?�t�}� Oate: (�'I 1�✓ I��j Project Ma�a r• F� Date .G ���v S Approved By: Date: ��!�7/l� Commu ity SaWces Adminis[rato�] t ��=: �a���h�r���, �"1 ���t� �� ���.�� r�c. �� �� � I CHANGE ORDER FORM Billin�Contact&Number: Proiect Name: Alan Wyatt Cedar River Trail Park- Final Design 425.430.6571-206.276.8833 Shippin�/24hr Contact& Number: awyatt@rentonwa.gov Alan Wyatt Billin�Address: 1055 S. G�ady Way Shippin�Address: City of Renton 1060 Nishiwaki Lane, Renton CO# QTY ITEM# VENDOR ADDITIONS/DEDUCT�ONS FROM ORIGINAL ORDER LIST PRICE 2 1 R&R Form, Pour Concrete ADA Ramp $ 3,350.00 Must be located outside of e ui ment use zones Bond: Freight: 10% Tax: $ 335.00 Additional Cost to NW Playground: Additional Cost to Customer: $ 3,685.00 Sales Person: SW Origina/Order $85,425.78 New Costs $ 3,685.00 Updated Order Total $89,110.78