Loading...
HomeMy WebLinkAboutAdden 05 CAG-15-177,Adden#5-18 � Washington Stafe �� Depar�ment af'i�ansportation 5upplem�ntal Agreement C�rganization andAddress �ll111kjLi' S Qtak,Inc. �riginai Agreement Number Y 11241 Wiltows Raad NE Redmond,wa 4&QS2 CAG-15-177 F'hane; Rroject hJumber ExecuGon Date Compis6an�ate 32468 Aug;�st 26,2015 Llecember 3 t,2019 Project Titie New Maximum Amount Payabls Lake Washington Loop Trail $657,964.00 Qescrip6en of Work Time Extension The Local A�ency af�'��afRenton desires to supp(ement the agreement entered in t�with otak Incc. and executed on Aueust 26.2015 ar�d identified as Agreement No. CaG-i s-177 Ai(provisions in the basic ag�eement remain in�ffect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF VVQRK, is here�y changed to read: No change 6� Section IV, TIME FOR BEGINN{NG AND COMPLETiQN, is amended to change the number of ca{endar days F�r completion of the work to read: �ecember 3t zot9 lI3 5ection�, PAYME�lT, shall be amended as fotlows: t�to change. as set forth in the attached Exhibit A, and by this reference rnade a part af this suppismer.t. If you oncur with this supplement a�d agree to the changes as stateci above, plPase sign in the Apprapriate spac ` below and return ta this offioe for�nal action. BY: O . By. c� ��N��C . t!� � Consuliant Signa#ure Ap ro ng Au�Gt ' S nature � � �1�� �_ a e ,_...� aoTFom,�aaosa Revised OBl2005