HomeMy WebLinkAboutAdden 1 CAG-17-011,Adden#1-18
�� �
�tt,���
�E �
AMENDMENT RIO. 1 TO AGREEMENT �AG-17-011 FOR
TRANSPORTATION BRIDGE PROGRAM
THIS AMENDMENT, dated i�- � 1�, is by and between the City of Renton (the"City"),
a Washington municipal corporati n, nd Sargent Engineers, Ine. ("Consultant"), a Washington
corporation. The City and the Consultant are referred to collectively in this Amendment as the
"Parties." Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-011, dated
2/13/2017, to provide necessary services for the Transportation Bridge Program (referred to
herein as the "Agreement"j;
Whereas, the Parties wish to amend the Agreement to change the time for performance and
change the compensation in order to continue praviding necessary services for the
Transportation Bridge Program.
NOW THEREFORE, It is mutually agreed upon that CAG-17-011 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is not changed.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit B-1. All Work shall be performed by no later than
December 31, 2020.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by$90,000 from $90,000 to $180,000,
plus any applicable state and local sales taxes.The additional compensation shall be paid
based upon Work actual performed according to the rate(s} or amounts specified in
Exhibit B-1, which is attached and incorporated herein.
4. Afl terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
�a��
PAGE I OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON CONSULTANT
By: By: �it� 1 .-�.iL�a
Denis Law Mont J. Smith
Mayor Principal
l'Z- l °� /� �r�..��
Date Date
Atte
f
�, ry ```\`\�e��������nri��,
�j .� ����ys',,���i
� (/ // V �� ` O`����H��.�i�hi� ��i
� � � ;�.` �'�� ''�
1as n A. Seth =c3: .�" � �` '
Cit Clerk ' . ��A' " Q =
� , � _ rn =
� �, : _
.� \�
Approved as to Legal Form ��'�, '� '''�������,������'' Q'��.'
/`'��i��'��'Q R,At�.�\g(G����,
•��s9���',�s�lt-e
Shane Moloney
Renton City Attorney
Contract Template Updated 12/29/2017
��,
PAGE 2 OF 2
Exhibit B-1
Sargent Engineers, Inc.
NOT TO EXCEED RATE SCHEDULE
Effective January 1, 2019 through December 31,2020
1. Personne)
Classification 2019 Hourly Rate 2020 Hourly Rate
Principal $ 209.86 $209.86
Senior Engineer $ 193.72 $ 193.72
Senior Project Engineer $ 193.72 $ 193.72
Project Engineer $ 167.89 $ 167.89
Design Engineer $ 142.06 $ 142.06
Engineering intern $93.63 $93.63
Drafter II $ 113.00 $ 113.00
Business Manager $ 158.20 $ 158.20
Business Associate $ 109.77 $ 109.77
Clerical $ 93.63 $93.63
Overhead: 192.86%
Profit:30%of DSC
2. Equipment
2019 Rates 2020 Rates
Field Equipment 2019 Blue Book 2020 Blue Book
3. Reimbursable Expenses
2019 Rates 2020 Rates
Mileage 2019 IRS Standard Rate 2020 IRS Standard Rate
Page 1 of 3
Exhibit B-1
Subconsultant: Watershed Science & Engineering, Inc.
NOT TO EXCEED RATE SCHEDULE
Effective January 1, 2019 through December 31,2020
1. Personnel
Classification 2019 Hourly Rate 2020 Hourly Rate
Senior Professional $ 225.05 $ 235.77
Senior Engineer I $ 199.34 $ 208.83
Senior Engineer II $ 160.76 $ 168.41
Senior Geomorphologist $ 150.46 $ 157.62
Staff Engineer $ 133.74 $ 140.11
lunior Engineer I $ 108.50 $ 113.66
GIS Specialist $ 133.74 $ 140.11
Technician/Drafter $ 83.59 $ 87.57
Engineering Intern $ 83.59 $ 87.57
Contract Administrator $ 117.02 $ 122.60
Overhead: 188.43%
Profit: 30%of DSC
Equipment
� 2, 2019 Rates 2020 Rates
UAS(drone)and Camera $100/day,$300Jweek $100/day,$300/week
Total Station Survey Package $200/day,$550/week $200/day,$550/week
Auto-Level Survey Package $50/day,$150/week $50/day,$15Q/weel<
Flow Meter/Stream Gaging Package $100/day,$300/week $100/day,$300/week
Reimbursable Expenses
3. 2019 Rates 2020 Rates
Travel
Mileage 2019 IRS Standard Ra#e 2020 IRS Standard Rate
Meats and Lodging 2019 GSA Per Diem Rate 2020 GSA Per Diem Rate
Parking Fees At Cost At Cost
Reproduction
Photocopies:
B&W 8%2 x 11 $0.10 $0.10
B&W 11 x 17 $0.15 $0.15
Color 8%x 11 $0.50 $0.50
Color 11 x 17 $1.00 $1.00
Page 2 of 3
Exhibit B-1
Subconsultant: PanGEO, Inc.
NOT TO EXCEED RATE SCHEDULE
Effective January 1, 2019 through December 31,2020
1. Personnel
Classification 2019 Houriy Rate 2020 Houriy Rate
Principal Geotechnica{Engineer $191.86 $197.52
Geotechnical Project Manager $163.92 $168.84
Sr. Geotechnical Engineer $133.56 $137.57
Sr. Engineering Geologist $109.29 $112.57
Project Geotechnical Engineer $97.14 $102.55
Project Engineering GeoEogist $97.14 $100.06
Staff Geotechnical Engineer $85.73 $88.30
Staff Geologist $7830 $80.65
Technician $75.77 $78.05
Administrative Assistant $76.51 $78.8Q
Overhead: 122.58%
Profit:30%of DSC
2. Equipment
2019 Rates 2020 Rates .
Water Level Indicator $15/day $15/day
Slope Inclinometer $75/day $75Jday
Hobo Data Logger $30/month $30/month
3. Reimbursable Expenses
2019 Rates 2020 Rates
Mileage 2019 IRS Standard Rate 2020 IRS Standard Rate