HomeMy WebLinkAboutPlanned Action-Subdistrict 1B Boeing Renton Plant Redevelopment (12/11/2006)wl
Kathy Keolker, Mayor
December 15, 2006
The Boeing Company
100 N. Riverside M/C 5003-4027
Chicago, IL 60606
CITY�F RENTON
City Clerk
Bonnie I. Walton
Re: Planned Action Ordinance for Sub -District I of the Boeing Renton Plant Property
To Whom It May Concern:
At the regular Council meeting of December 11, 2006, the Renton City Council approved the
referenced Planned Action by adopting Ordinance No. 5242. This ordinance is effective
12/20/2006. A copy of the ordinance is enclosed for your information.
If I can provide additional information or assistance, please feel free to contact me.
Sincerely,
Bonnie I. Walton
City Clerk
Enclosure
BW.js
cc: Mayor Kathy Keolker
Council President Randy Corman
Alex Pietsch, EDNSP Administrator
Jennifer Henning, Current Planning Manager
Jill Ding, Senior Planner
Boeing Realty, PO Box 3707, MC 1F-58, Seattle, WA, 98124
Shaunta Hyde, PO Box 3707, MC 1449, Seattle, WA, 98124
Rick Ford, PO Box 3707, MC 6301, Seattle, WA, 98124
Jan Fedor, PO Box 3707, MC 6301, Seattle, WA, 98124
1055 South Grady Way - Renton, Washington 98057 - (425) 430-6510 / FAX (425) 430-6516
MThis paper contains 50%recvcledmaterial, 30%Post consumer
RENTON
AHEAD OF THE CURVE
V
CITY OF RENTON, WASHINGTON
ORDINANCE NO. 5 2 4 2
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON,
DESIGNATING A PLANNED ACTION FOR SUB -DISTRICT 1-B OF THE
BOEING RENTON PLANT PROPERTY, AN APPROXIMATELY 51
ACRE PARCEL BOUNDED BY LOGAN AVENUE N., GARDEN
AVENUE N., NORTH 8TH STREET, AND 6TH STREET.
WHEREAS, RCW 43.21C.031 and WAC 197-11-164, - 168, and - 172 allow and
govern the application of a Planned Action designation; and
WHEREAS, an Environmental Impact Statement (EIS) entitled the "Boeing Renton
Comprehensive Plan Amendment EIS" has been prepared to study the impacts of redeveloping a
portion of Boeing's Renton Plant property; and
WHEREAS, the EIS analyzed the potential environmental impacts of mixed -use
development on that portion of the Boeing Renton Plant known as Sub -District 1-B (see Exhibit
A); and
WHEREAS, by Ordinance No. 5026, the City has amended the Comprehensive Plan
Land Use Map for the Boeing Renton Plant from Employment Area — Industrial (EA -I),
Employment Area — Transition (EA-T) and Employment Area Office (EA-0) to Urban Center
North (UC-N); and
WHEREAS, by Ordinance. No. 5027, the City has amended the Zoning Map for the
Boeing Renton Plant from Center Office Residential (COR) and Commercial Office (CO), to
Urban Center North 1 (UC-NI); and
WHEREAS, in 2003, the City and Boeing entered into a Development Agreement based
on the analysis in the EIS, which is recorded under King County recording number
20031210001637 ("Boeing Development Agreement"); and
�w ORDINANCE NO. 5 2 4 2 Vve
WHEREAS, on November 7, 2005, the City approved a Conceptual Plan for Sub -
District 1-13 ("1B Conceptual Plan"), attached as Exhibit B; and
WHEREAS, an Environmental Consistency Analysis has been prepared for Sub -District
1B, which compares the proposed 1B Conceptual Plan to the range of development alternatives
analyzed in the EIS; and
WHEREAS, this Ordinance designates certain land uses and activities within Sub -
District 1-B as "Planned Actions" that are consistent with the Urban Center North 1 (UC-N1)
designation and zone;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASMNGTON, DOES ORDAIN AS FOLLOWS:
SECTION I. Purpose. The City of Renton declares that the purpose of this
ordinance is to:
A. Set forth a procedure designating certain project actions within Sub -District 1-B
as "Planned Actions" consistent with state law, RCW 43.21C.03I; and
B. Provide the public with an understanding as to what constitutes a Planned Action
and how land use applications which qualify as Planned Actions within Sub -District 1-B will be
processed by the City; and
C. Streamline and expedite future land use permit review processes for development
in the Sub -District 1-B area that is consistent with the I Conceptual Plan by relying on existing
detailed environmental analysis for this area.
SECTION H. Findings. The City Council finds that:
2
'"W ORDINANCE NO. 5 2 4 2
A. The EIS addresses all significant environmental impacts associated with the
scenarios described in the EIS for Alternatives 1, 2, 3, and 4 as referenced therein, and the 1B
Conceptual Plan is encompassed by and consistent with those Alternatives; and
B. The mitigation measures contained in the Boeing Development Agreement,
together with the City's development standards, and standard mitigation fees (Parks, Fire and
Traffic), are adequate to mitigate any significant adverse environmental impacts of the proposed
1B Conceptual Plan; and
C. The expedited permit review procedure set forth in this Ordinance is and will be a
benefit to the public, will protect the environment, and will enhance economic development; and
D. Opportunities for public involvement have been provided as part of the
Comprehensive Plan redesignation, the Boeing Plant rezone, the EIS, and the Conceptual Plan
review and approval process for Sub -District 1-B.
SECTION M. Designation of Planned Action; Procedure and Criteria for
Evaluating and Establishing Projects as Planned Actions.
A. Planned Action Designated. The Planned Action designation shall apply to the
Sub -District 1-B site, as shown on Exhibit A, and associated off -site improvements. Uses and
activities described in the 1B Conceptual Plan, attached as Exhibit B, subject to the thresholds
described in Alternatives 1, 2, 3, and 4 analyzed in the EIS, and subject to the mitigation
measures required by City Codes or contained in the Boeing Development Agreement, are
designated Planned Actions pursuant to RCW 43.21.C.031. Additionally, the Planned Action
designation shall apply to any off -site improvements necessitated by the proposed development
on Sub -District 1B, where the off -site improvements have been analyzed in the EIS.
3
%W ORDINANCE NO. 5242
B. Environmental Document. A Planned Action designation for a site -specific
permit application shall be based on the environmental analysis contained in the EIS. The
Development Agreement, together with existing City codes, ordinances, standard mitigation fees,
and standards, shall provide the framework for a decision by the City to impose conditions on a
Planned Action project. Other environmental documents incorporated by reference in the EIS
may also be utilized to assist in analyzing impacts and determining appropriate mitigation
measures.
C. Planned Action Review Criteria.
The Director of Development Services, or the Director's designee, is
hereby authorized to designate a project application as a Planned Action pursuant to RCW
43.21 C.031(2)(a), if the project application meets WAC 197-11-172 and all of the following
conditions:
a) The project is located on Sub -District 1-B, or is an off -site
improvement directly related to a proposed development on Sub -District 1-B; and
b) The project is consistent with the Renton Comprehensive Plan
adopted under RCW 36.70A; and
c) The Director has determined that the project's significant
environmental impacts have been adequately addressed in the EIS by reviewing the
environmental checklist or other project review form as specified in WAC 190-11-315; and
in this Ordinance; and
d) The project complies with the Planned Action threshold described
e) The Director has determined that the project's significant impacts
have been mitigated through the application of the Boeing Development Agreement, as well as
4
ORDINANCE NO, 5 2 4 2
other City requirements, standard mitigation fees, and conditions, which together constitute
sufficient mitigation for any significant environmental impacts associated with Sub -District 1-B
development; and
0 The proposed project complies with all applicable local, state and
federal regulations, and where appropriate, needed variances or modifications or other special
permits have been requested; and
g) The proposed project is not an essential public facility.
D. Effect of Planned Action.
Upon designation by the Director that the project qualifies as a Planned
Action, the project shall not be subject to a SEPA threshold determination, an environmental
impact statement (EIS), or any additional review under SEPA.
2. Designation as a Planned Action means that a proposed project has been
reviewed in accordance with this Ordinance, and found to be consistent with the development
parameters and environmental analysis included in the EIS.
3. Planned Actions will not be subject to further procedural review under
SEPA. However, projects will be subject to conditions designed to mitigate any environmental
impacts which may result from the project proposal, and projects will be subject to whatever
permit requirements are deemed appropriate by the City under State and City laws and
ordinances.
4. Amendments of the approved Sub -District I Conceptual Plan may be
approved administratively, so long as such amendments remain consistent with the spirit and
intent of the adopted Plan. For development of Sub -District 1B qualifying as a planned action
pursuant to this Ordinance, a proposed amendment of the Sub -District I Conceptual Plan is
5
' ORDINANCE NO. 5 2 4 2
consistent with the adopted Plan's spirit and intent if such amendment does not exceed the
maximum development parameters analyzed in the EIS. If amendments of the approved Sub -
District 1B Conceptual Plan exceed the maximum development parameters reviewed in the EIS,
supplemental environmental review may be required under the SEPA rules.
E. Planned Action Permit Process.
The Director shall establish a procedure to review projects and to determine whether they
meet the criteria as Planned Actions under State laws and City codes and ordinances. The
procedure shall consist, at a minimum, of the following:
Development applications shall meet the requirements of RMC Chapters
4-8 and 4-9. Applications shall be made on forms provided by the Department and shall include
a SEPA checklist or revised SEPA checklist [where approved through WAC 197-11-315(2)] or
such other environmental review forms provided by the Planning/Building/Public Work
Department. The checklist may be incorporated into the form of an application,
2. The Director shall determine whether the application is complete as
provided in RMC Chapter 4-8.
If the project application is within Sub -District I-B, the application shall
be reviewed to determine whether the proposed application is consistent with and meets all of the
qualifications specified in section III of this Ordinance.
4. Upon review of a complete application by the City, the Director shall
determine whether the project qualifies as a Planned Action. If the project does qualify, the
Director shall notify the applicant, and the project shall proceed in accordance with the
appropriate permit procedure, except that no additional SEPA review, threshold determination,
or EIS shall be required.
Z
ORDINANCE NO. 5 2 4 2 1-fto°
5. Public notice for projects that qualify as Planned Actions shall be tied to
the underlying permit. If notice is otherwise required for the underlying permit, the notice shall
state that the project has qualified as a Planned Action. If notice is not otherwise required for the
underlying permit, no notice is required.
6. If a project does not qualify as a Planned Action, the Director shall notify
the applicant and prescribe an appropriate SEPA review procedure consistent with City SEPA
procedures and state laws. The notice to the applicant shall describe the elements of the
application that result in disqualification as a Planned Action.
7. Projects disqualified as a Planned Action may use or incorporate relevant
elements of the EIS, as well as other environmental documents to assist in meeting SEPA
requirements. The Environmental Review Committee may choose to limit the scope of the
SEPA review to those issues and environmental impacts not previously addressed in the EIS.
SECTION IV. Validity Period. This Planned Action Ordinance shall be
reviewed no later than December 31, 2016, by the Development Services Director to determine
its continuing validity with respect to the environmental conditions of the subject site and
vicinity and applicability of Planned Action requirements. Based upon this review, the
Ordinance may be amended as needed, and another validity period may be specified.
SECTION V. Conflict. In the event of a conflict between the Ordinance or any
mitigation measures imposed pursuant thereto and any other ordinance, or regulation of the City,
the provisions of this Ordinance shall control, EXCEPT that provision of any Uniform Code
shall supersede.
SECTION VI. Severability. Should any section, subsection, paragraph, sentence,
clause or phrase of this Ordinance or its application be declared unconstitutional or invalid for
7
ORDINANCE NO. 5 2 4 2
any reason, such decision shall not affect the validity of the remaining portions of this Ordinance
or its application to any other person or situation.
SECTION VII. This ordinance shall be effective upon its passage, approval, and
five days after publication.
PASSED BY THE CITY COUNCIL this 11 t h day of December , 2006.
t t f
Bonnie I. Walton, City Clerk
APPROVED BY THE MAYOR this 11 t h day of December , 2006.
Appr d as to form:
Lawrence J. Warren, City Attorney
Date of Publication: 12/15/2006 (summary)
ORD. 1321:12/6/06:ma
Kathy K lker, Mayor
LIV
m
m
ORDINANCE NO. 5242
THE BOEING COMPANY
CONCEPTUAL REDEVELOPMENT PLAN
SUB -DISTRICT 1-B
Submitted to the City of Renton
October 3, 2005
Exhibit B
ORDINANCE NO. 5242
CONCEPTUAL REDEVELOPMENT PLAN
Sub -District 1-13
Renton, Washington
Background
The Boeing Company has been working with the City of Renton since early 2003 to
evaluate potential redevelopment strategies associated with its 737 facility in Renton,
Washington (the "Renton Plant Site"). In December 2003, The Boeing Company and
The City of Renton entered into a Development Agreement that established certain roles
and responsibilities for the potential phased redevelopment of all or a portion of the
Renton Plant Site, including:
Renton commitments to fund and construct certain public infrastructure
improvements;
Boeing commitments to fund certain private aspects of redevelopment; and
■ Boeing commitments to complete Conceptual Plans when it elects to subdivide,
develop, sell, or otherwise alter any property for uses not related to airplane
manufacturing.
Per the terms of the Development Agreement, Conceptual Planning was anticipated to
occur incrementally, and would be completed for three discrete areas of the Site, known
as Sub -Districts I -A and I -B, and District 2 (see Exhibit 1). City Council approved
Boeing's Conceptual Plan for Sub -District 1-A in December 2003 and amended it in
October 2004. Boeing subsequently sold this portion of the Site to Harvest Partners in
December 2004.
Harvest Partners is currently refining its development plan for Sub -District I -A, which is
also sometimes referred to as both Lots I — 4 and Lakeshore Landing. Harvest Partners'
preliminary planning anticipates the development of an urban retail center containing
approximately 800,000 square feet of retail, with the potential for additional hotel, office
space and multifamily residential units. Construction of the retail project is anticipated to
begin in 2006.
Sub -District 1-B
Sub -District 1-13 is located immediately to the south of Lakeshore Landing, as illustrated
on Exhibit 2, and totals approximately 50.7 acres, net of that portion which has been
reserved for the extension of a four -lane 8`h Avenue between Logan and Park Avenues.
As is outlined within the 2003 Development Agreement, the construction of two new
lanes along this segment of 8th is necessary to support the redevelopment of Sub -District
1-13 (see Exhibit 3).
Page I of 9
October 3, 2005
` W `"o
ORDINANCE NO. 5242
The City of Renton is currently completing its design for this segment of 8"' Avenue, and
expects to begin building at least the two northern -most lanes in March; 2006,
simultaneous with the other infrastructure improvements necessary to support the
redevelopment of Sub -District 1-A. Ultimately; two additional lanes (to the south) along
this same segment of 8 h will be required to support the redevelopment of District 2.
Harvest Partners has a Right of First Offer to purchase a portion of the Sub -District
which totals approximately 21.2 acres (see Exhibit 3). Harvest Partners has indicated
their interest in developing this portion, known as the ROFO area, with retail uses that are
complementary with the proposed development of Sub -District 1-A as an urban retail
center. The development intent of the ROFO area as depicted with this Conceptual
Redevelopment Plan is based upon feedback from Harvest Partners as to their proposed
project and from The City of Renton as to their goals for redevelopment within the Urban
Center North.
The remainder of Sub -District 1-B contains approximately 29.5 acres and is described
herein as the "Boeing Remainder", as illustrated on Exhibit 2. Portions of the Boeing
Remainder are currently improved with office buildings that Boeing owns and will
continue to utilize as part of on -going airplane manufacturing plant operations.
Interspersed between these existing office buildings are approximately 12.85 acres of the
Boeing Remainder that have been identified as potential development parcels ("DP 1"
through "DP 4") within this Conceptual Plan.
Submittal
Included within this submittal are a narrative description of Boeing's proposal for Sub -
District 1-B, a Conceptual Planning Diagram, and two economic benefit analyses
demonstrating a range of potential one-time and recurring revenues generated by:
(1) Development illustrated within the Planning Diagram on the ROFO portion of the
Sub -District (beginning in 2007); and
(2) Development illustrated within the Planning Diagram on the Boeing Remainder
(beginning in 2007 for DP I and in 2016 for DP 2 — DP 4).
Boeing seeks the City's approval of this Conceptual Plan so that it can complete a
Binding Site Plan creating additional lots, and finalize negotiations with Harvest Partners
related to the acquisition of the ROFO portions of the Sub -District. The timing of a land
surplus decision by Boeing or redevelopment associated with the majority of the Boeing
Remainder (with the exception of DP1) is not currently envisioned to occur sooner than 5
to 10 years in the future.
Page 2 of 9
October 3, 2005
ORDINANCE NO. 5242
'
�::� .:� ram; •
..'-#
'r
L
�Y
y
V Y)
-
j l
��
y.: 3 � • 4 *i
nftft
1
E
�
r ' .�R'rY
-
lemma
i t y.i
j
ORDINANCE NO. 5242
*40
Sqt,mb. � MM CONCEPTUAL PLAN
FULLER SEARS
ARCHITECTS SUB -DISTRICT 1-13
MAX 11
"o g
RRETAIL
LLAB
0 OFFICE
P PARKING GARAGE
M F MULTI -FAMILY
PEDESTRIAN
CONNECTIONS
DG
Elm
IG IN. DP-2�
DP-4:
MAX. TWO
wy
(SIM.DW-31F
GARAGE
OTALl.
SPORTEIJ y
ST. i-AptKilt
WAGE
NOTE:
MAX. TWO
r,STOFIYBLDGS.
F OFF4CE
(300,000 sr)
WITH NEW 23 STORY
PARKING GARAGE
ORDINANCE NO. 5242
Conceptual Development Plan
The Conceptual Plan for Sub -District 1-B is comprised of two somewhat distinct parts.
The ROFO area makes up the northern portion of the property along 81hAvenue, has been
identified as surplus by Boeing operations, and is available for near -term redevelopment.
The Boeing Remainder makes up the southern portion of the Sub -District, and contains
660,000 square feet of existing office space with re -use potential and approximately
12.85 acres of land with future redevelopment potential.
ROFO Area
Boeing recognizes that high -quality retail development is essential to the successful
transition of the area from its industrial roots to the City's vision for the Urban Center -
North. Harvest Partners and the City are both committed to ensuring that the
development at Lakeshore Landing is well -designed and initiates redevelopment of a
quality and at a scale which is consistent with the City's long-term vision for the area.
As planning for Lakeshore Landing has progressed, the land south of 81h has been
identified as an important component of the overall project. The area, known as the
ROFO portion of Sub -District 1-B, has been illustrated within this Conceptual Plan as an
integral part of the retail development planned to the North.
The ROFO portion of the Sub -District is envisioned to contain a large format
"destination" retailer located along Logan Avenue, with supporting retail shops space
concentrated along both sides of Park Avenue. Generally, the large format retail
development (users with footprints of 50,000 square feet or larger, and building heights
up to 45 feet) is planned to occur along 8a' and Logan, facing eastward toward Park
Avenue. The supporting retail shops space would include a mixture of medium format
retailers (ranging between 10,000 and 50,000 square feet in area, with building heights up
to 40 feet) and some component of smaller, specialty retail shops overlooking Park
Avenue.
The Plan anticipates pedestrian connections to occur internally within the site both east
toward Park Avenue, and south toward 6`s Avenue. Vehicle access would occur off of
Park Avenue, with loading and delivery functions relying upon Garden Avenue and an
internal service road running along the southern edge of the ROFO property line.
At a maximum lot coverage ratio of 30%, the ROFO site could accommodate up to
270,000 square feet of retail space. Harvest's current planning anticipates a total of
225,000 to 230,000 square feet, comprised of a 135,000 — 140,000 square -foot large
format retailer located along Logan, and 85,000 to 90,000 square -feet of shops space.
Parking is located in well -organized surface parking lots, with primary pedestrian
entrances facing inward or directed toward Park Avenue.
A small portion of the site, containing a data hub for the Boeing Plant, needs to be
retained by Boeing for the foreseeable future. It can be accommodated along the
Page 5 of'9
October 3, 2005
ORDINANCE NO. 5242
southern portion of a mid -block parking field without having a negative impact on the
surrounding retail uses.
Summary
Redevelopment of the ROFO parcel as envisioned within this Conceptual Plan meets
many of the City's vision and policy statements for the Urban Center -North, which call
for "retail integrated into pedestrian -oriented shopping districts." This site is located
within District 1, where the City identifies its first objective as follows:
"Create a major commercial/retail district developed with uses that add significantly to
Renton's retail tax base, provide additional employment opportunities within the City,
attract businesses that serve a broad market area and act as a gathering place within the
community."
Boeing Remainder
This portion of the plan is significantly influenced by the presence of four, 1980s-vintage
office buildings that are located throughout (the 10-13, 10-16, 10-18 and 10-20
buildings). Each structure is 5 — 6 stories in height, ranging between 160,000 and
170,000 square feet. Parking is accommodated in separate, structured garages and in
surrounding surface lots, at an overall ratio of 4.5 stalls per 1,000 square feet. Boeing
currently utilizes these four buildings and anticipates no near -teen changes that would
result in significant rehab or sale of the structures.
In addition to the existing office buildings, there is also a 1960s-vintage lab building,
known as the 10-71 building, located along Logan Avenue. Although the condition of
the building and the planned widening of Logan Avenue may impact its potential re -use,
Boeing and the City are interested in exploring viable adaptive re -use opportunities. To
illustrate the potential capacity for redevelopment within the Conceptual Plan, the 10-71
building has been assumed to be demolished, creating a 4.9-acre development parcel
between Logan Avenue and the 10-20 building (DP 1). However, Boeing would like to
retain the flexibility of considering either re -use of the existing structure or
redevelopment in the future.
We have assumed that the existing office buildings remain, but could be supported in the
future by parking at a market -driven ratio of 3.5 stalls per 1,000 square feet, rather than at
Boeing's more conservative rate. As a result, surplus parking stalls exist within the three
existing parking garages, and three additional development parcels are created: a 3.9-acre
site between the 10-18 and 10-20 buildings (DP2); a 1.8-acre site on the west side of Park
Avenue north of 6th (DP3); and, a 2.2-acre site on the west side of Garden Avenue north
of 6`h (DP4).
Page 6 of 9
October 3, 2005
ORDINANCE NO 5242
DPI
This 4.9-acre parcel is located along Logan Avenue, immediately south of the ROFO
property. Fronting on 6`h Avenue, it is also adjacent to the 10-20 office building and
associated parking structure. Given its location and near -term redevelopment potential,
the Plan envisions its redevelopment as either a mid -rise, multifamily project or,
potentially, a retail development ancillary to that anticipated on the ROFO piece. If,
instead, the existing building were re -used, it is envisioned that it would be of interest
either as a cost-effective research and development or contract manufacturing facility.
With the demolition of the existing structure, the DP- I site could support a significant
multi -family project, either incorporated in one or more stories above ground -floor
retailers, or developed at higher densities as a single use project. A five- to six -story
residential project, developed at densities of 110 units per acre, would be both consistent
with the residential development currently planned at Lakeshore Landing and compatible
with the surrounding uses. At this higher density, approximately 535 units could be sited
on DP 1.
Alternately, redevelopment of the DPI parcel could accommodate up to 65,000 square
feet of retail space at a 30% lot coverage ratio, taking the form of additional medium -
format and small, specialty shops space backing up against Logan. Although access
would most likely occur off of 6a'Avenue, the development of DPI could be integrated
with the larger retail development occurring.on the ROFO parcel.
DP2 and DP4
These two parcels are both infill opportunities that exist when parking requirements for
the existing office buildings are reduced. Currently underutilized and serving for the
most part as overflow parking areas for Boeing employees, the Plan envisions their
redevelopment with 6-story office or lab buildings, consistent with the current
development pattern.
In some instances where new lab development is planned, surplus parking within existing
garages could fully support new development, and allow for the creation of new, private
open spaces or campus greens within the neighborhood. In order to create this surplus
parking opportunity, the Plan assumes either that the four existing Boeing office
buildings are sold to other users with market -based parking requirements or that Boeing
provides new parking areas on the Plant to accommodate its employees.
The Conceptual Plan illustrates the potential redevelopment of each of these parcels with
laboratory uses, resulting in approximately 720,000 square feet of new space in four
separate structures. Both DP2 and DP4 could accommodate two, 6-story structures
containing 180,000 square feet each. A new 2- to 3-story parking garage would be
constructed between the new buildings on DP2, and the additional parking needs would
be provided by ear -marking a portion of the stalls within the 10-20 parking garage. On
Page 7 of 9
October 3, 2005
cm
ORDINANCE NO. 5242
DP4, sufficient surplus parking exists within the existing 10-18 parking garage that no
new parking would need to be constructed in this location.
Alternately, either DP2 or DP4 could also be redeveloped with new office uses. Given
the greater parking requirement for office space (3.5/1,000) when compared to lab space
(1/1,000), less development is able to be accommodated on the parcels. On DP2, a
single, 6-story structure would be developed, containing 120,000 square feet. New
structured parking would be developed behind. On DP4, approximately 300,000 square
feet could be constructed in two, 6-story buildings, with all parking still provided within
the existing 10-18 building garage.
DP3
This parcel is located just south of the 10-18 office building, at the corner of 6"' and Park
Avenues. The Plan envisions the development of this parcel with new lab or office uses,
in both cases housed within a single 6-story structure. If developed as lab space, the
building could contain approximately 180,000 square feet, supported by dedicated
parking stalls within a new, multi-user garage constructed on DP2. If developed as office
space, a building of approximately 120,000 square feet could be constructed on site, with
parking either provided in a new garage on DP3 or accommodated by providing
additional parking levels within a DP2 garage.
Alternately, the DP3 parcel could accommodate up to 24,000 square feet of neighborhood
retail space, fronting on Park Avenue and offering amenities to the surrounding workers
and residents. Although no redevelopment of the land on the other side of Park Avenue
is envisioned as part of this Conceptual Plan, redevelopment of DP3 could also lead to
other improvements along Park Avenue at key intersections. It is envisioned that, if
developed with retail uses, DP3 would begin to meet the increased demands for amenities
and services that redevelopment along the 61h Avenue corridor would require.
Summary
Redevelopment as illustrated within this Conceptual Plan would be consistent with the
City's Urban Center -North vision and long-range planning policies, creating a vibrant,
mixed -use corridor on the north side of 6`h Avenue and along Park, with mid -rise
buildings fronting the streets and structured parking behind. If new development took the
form of multi -family and laboratory space, the corridor would contain a total 535 new
multi -family units and 900,000 square feet of new lab space at full build -out. This new
mix of uses would be at a scale consistent with the 660,000 square feet of existing office
space already located in the corridor.
Page 8 of 9
October 3, 2005
ORDINANCE NO. 5242 ..e
Economic Benefit Analysis Summary
Boeings Conceptual Redevelopment Plan for Sub -District 1-B seeks to both allow for
the near -tern redevelopment of Boeing's underutilized assets while advocating for a mix
of uses that significantly improves the City's tax and employment base. Two economic
benefit analyses (Exhibit 4) have been completed to support this submittal, demonstrating
the potential one-time and recurring revenues generated by:
(1) Development illustrated within the Planning Diagram on the ROFO portion of the
Sub -District (beginning in 2007); and
(2) Development illustrated within the Planning Diagram on the Boeing Remainder
(beginning in 2007 for DP 1 and in 2016 for DP 2 — DP 4).
The economic benefits to the City of Renton associated with the redevelopment of the
ROFO portion of the site can be summarized as follows:
■ By 2008 (project stabilization), it is estimated that over 1,061 jobs would be
created in the City of Renton alone; of this job total, 859 direct jobs would be
located within the development and 202 would be indirect City jobs;
■ The City is estimated to gain one-time revenues of nearly $667,000 during
redevelopment of the parcels;
■ The City is also forecast to receive an increase in recurring annual tax revenues of
nearly $856,000, beginning in 2008.
The economic benefits to the City of Renton associated with the redevelopment of the
Boeing Remainder portion of the site (DP I — 4) can be summarized as follows:
■ By 2013 (project stabilization), it is estimated that over 2,100 jobs would be
created in the City of Renton alone if this portion were developed with
multifamily and lab uses as illustrated on the Conceptual Plan; of this job total,
1,700 direct jobs would be located within new buildings and 400 would be
indirect City jobs;
• Under this same set of land use assumptions, the City is estimated to gain one-
time revenues of more than $6.2 million during redevelopment of the parcels;
■ The City is also forecast to receive an increase in recurring annual tax revenues of
nearly $2.3 million, beginning in 2013.
Page 9 of 9
October 3, 2005
ORDINANCE NO. 5242
December 11, 2006 NNW Renton City Council Minutes Page 451
Ordinance #5249
An ordinance was read amending Section 4-1-220, Property Tax Exemption for
Planning: Multi -Family
Multi -Family Housing in Residential Targeted Areas, of Chapter 1,
Housing Property Tax
Administration and Enforcement, of Title IV (Development Regulations) of
Exemption, Sunset Clause
City Code by extending the sunset to 12/31/2009 for applications for the
Extension
property tax exemption for multi -family housing in residential targeted areas.
MOVED BY LAW, SECONDED BY BRIERS, COUNCIL ADOPT THE
ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
Ordinance #5250
An ordinance was read amending the 2006 Budget by using $12,500 from the
Fire: Renton Heart Month
Fund 010 fund balance for the purpose of purchasing equipment for 2007
Activities, Budget Amend
Renton Heart Month activities. MOVED BY LAW, SECONDED BY
CLAWSON, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL
CALL: ALL AYES. CARRIED.
Ordinance #5251
An ordinance was read providing for the 2006 year-end budget amendments in
Budget: 2006 Year -End
the total amount of $1,031,418. MOVED BY LAW, SECONDED BY
Amendments
CLAWSON, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL
CALL: ALL AYES. CARRIED.
NEW BUSINESS
Noting the recent snowstorm, Councilman Persson complimented the City street
Public Works: Street Crews,
crews for their efforts in clearing the snow. Mayor Keolker noted that crews
Snowstorm Response
worked around the clock to clear the streets.
Airport: Layout Plan Update
Councilwoman Palmer acknowledged the concerns of citizens regarding the
new jet center at the Renton Municipal Airport. She assured that comments are
listened to, and indicated that an open house regarding the matter is scheduled
for January 16.
MOVED BY PALMER, SECONDED BY PERSSON, COUNCIL REFER THE
PREFERRED AIRPORT LAYOUT PLAN TO THE AIRPORT ADVISORY
,COMMITTEE. CARRIED.
Development Services: Boeing MOVED BY CLAWSON, SECONDED BY CORMAN, COUNCIL REMOVE
Subdistrict I Planned Action THE BOEING SUB -DISTRICT 1-B PLANNED ACTION ITEM FROM
COMMITTEE OF THE WHOLE. CARRIED.
ADJOURNMENT MOVED BY NELSON, SECONDED BY PERSSON, COUNCIL ADJOURN.
CARRIED. Time: 9:40 p.m.
&WVLX� 4. LtJa>
Bonnie I. Walton, CMC, City Clerk
Recorder: Michele Neumann
December 11, 2006
December 11, 2006 Renton City Council Minutes Page 449
Development Services:
Planning and Development Committee Chair Briere presented a report
Removal of Restrictive
concurring with the staff recommendation to remove restrictive covenants
Covenants on Dalpay
placed on the Dalpay properties (tax nos. 30423059273, 0423059273, and
Properties, Union Ave NE
142305235) in 1984, and recorded by King County as no. 8404300578.
The properties are located at the northwest quadrant of the intersection of NE
12th St. and Union Ave. NE. The property owner James Dalpay requested
consideration of this action. Staff concurred due to conflicts between the
recorded restrictions and current Comprehensive Plan policy. MOVED BY
BRIERS, SECONDED BY CLAWSON, COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
Utilities Committee
Utilities Committee Chair Clawson presented a report recommending
Utility: Oversizing
concurrence in the staff recommendation to approve the request for
Reimbursement for Water
reimbursement in the total amount of $53,750 from JDA Group LLC, for costs
Main, Sixth Street Short Plat,
related to the installation of a new eight -inch water line in NW 6th St. as
JDA Group
requested by the City's Utility Division.
City Code allows developers to request the City to participate in the cost of the
utility improvement when the City requires a route for the utility that is more
expensive than other potential routes for the best interest of the City and the
general locality. MOVED BY CLAWSON, SECONDED BY BRIERE,
COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED.
RESOLUTIONS AND
The following resolutions were presented for reading and adoption:
ORDINANCES
Resolution #3847
A resolution was read approving the Cottages at Honey Creek Final Plat;
Plat: Cottages at Honey Creek,
approximately 4.1 acres located at 4821 NE Sunset Blvd. MOVED BY
NE Sunset Blvd, FP-06-041
BRIERS, SECONDED BY CLAWSON, COUNCIL ADOPT THE
RESOLUTION AS READ. CARRIED.
Resolution #3848
A resolution was read approving the Savannah at the Park Final Plat;
Plat: Savannah at the Park,
approximately 1.73 acres located in the vicinity of the 900 block of Union Ave.
Union Ave NE, FP-06-127
NE. MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL
ADOPT THE RESOLUTION AS READ. CARRIED.
The following ordinances were presented for first reading and advanced for
second and final reading:
Development Services: Boeing
An ordinance was read designating a Planned Action for Sub -District 1-13 of the
Subdistrict 113 Planned Action
Boeing Renton Plant property, an approximately 51-acre parcel bounded by
Logan Ave. N., Garden Ave. N., N. 8th St., and N. 6th St. MOVED BY
�1
BRIERE, SECONDED BY PALMER, COUNCIL ADVANCE THE
ORDINANCE FOR SECOND AND FINAL READING. CARRIED.
Ordinance #5242
Following second and final reading of the above -referenced ordinance, it was
Development Services: Boeing
MOVED BY CLAWSON, SECONDED BY LAW, COUNCIL ADOPT THE
Subdistrict I Planned Action
ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED.
Annexation: Maplewood
An ordinance was read annexing approximately 60.5 acres of property located
Addition, Maple Valley Hwy
primarily along the south side of SE Renton - Maple Valley Hwy. east of
Maplewood Gardens and west of the Cedar River where it crosses under the SE
Renton - Maple Valley Hwy. (Maplewood Addition). MOVED BY BRIERE,
SECONDED BY CLAWSON, COUNCIL ADVANCE THE ORDINANCE
FOR SECOND AND FINAL READING. CARRIED.
L=
RENTON CITY COUNCIL
Regular Meeting
December 11, 2006
Council Chambers
Monday, 7 p.m.
MINUTES Renton City Hall
CALL TO ORDER
Mayor Kathy Keolker called the meeting of the Renton City Council to order
and led the Pledge of Allegiance to the flag.
ROLL CALL OF
RANDY CORMAN, Council President; DON PERSSON; MARCIE PALMER;
COUNCILMEMBERS
TERRI BRIERS; DENIS LAW; DAN CLAWSON; TONI NELSON.
CITY STAFF IN
KATHY KEOLKER, Mayor; JAY COVINGTON, Chief Administrative
ATTENDANCE
Officer; LAWRENCE J. WARREN, City Attorney; BONNIE WALTON, City
Clerk; GREGG ZIMMERMAN, Planning/Building/Public Works
Administrator; JILL DING, Senior Planner; MICHAEL BAILEY, Finance and
Information Services Administrator; ALEX PIETSCH, Economic Development
Administrator; REBECCA LIND, Planning Manager; DON ERICKSON,
Senior Planner; TERRY HIGASHIYAMA, Community Services Administrator;
MARTY WINE, Assistant CAO; CHIEF I. DAVID DANIELS, Fire
Department; COMMANDER KENT CURRY, Police Department.
PUBLIC HEARINGS
Development Services: Boeing
Subdistrict 1 B Planned Action
TR
This being the date set and proper notices having been posted and published in
accordance with local and State laws, Mayor Keolker opened the public hearing
to consider designating a Planned Action for Sub -District 1-B of the Boeing
Plant Property, an approximately 51-acre parcel bounded by Logan Ave. N. on
the west, Garden Ave. N. on the east, N. 8th St. on the north, and N. 6th St. on
the south.
Senior Planner Jill Ding reviewed the project history as follows:
• October 2003 - Environmental Impact Statement (EIS) completed.
• December 2003 - Comprehensive Plan amendment completed.
• December 2003 - City and Boeing established a development agreement.
• November 2005 - Conceptual plan for redevelopment approved.
Ms. Ding stated that the parcel can be divided into two major components. The
northern 21.2 acres, which Harvest Partners has a right of first offer to purchase,
is known as the ROFO area. The remaining southern 29.5 acres is referred to as
the Boeing remainder. She explained that development of the ROFO area
would likely include a large format retailer at the intersection of Logan Ave. N.
and N. 8th St. Additionally, small and medium format supporting retail shops
are envisioned along both sides of Park Ave. N.
Regarding the Boeing remainder area, Ms. Ding indicated that Boeing will
continue to utilize four existing office buildings and three parking garages. She
noted that near term changes are not proposed for these buildings. Ms. Ding
pointed out that approximately 12.85 acres interspersed between the office
buildings have been identified for potential redevelopment. Potential
redevelopment may include multi -family residential, medium and small format
retail shops, and office or lab buildings.
She concluded that the Planned Action legislation, combined with the approved
2003 EIS and development agreement, streamlines the permitting process by
utilizing existing environmental documentation. Staff recommends that
Council: cancel the referral of this issue to Committee of the Whole; approve
the use of the existing environmental documentation contained within the
December 11, 2006 Renton City Council Minutes __ _ Page 439
Boeing EIS for future redevelopment of the site; and present the ordinance for
first and second reading tonight.
Public comment was invited. There being none, it was MOVED BY BRIERS,
SECONDED BY CLAWSON, COUNCIL CLOSE THE PUBLIC HEARING.
CARRIED. (See page 449 for ordinance, and page 451 for additional Council
action.)
Annexation: Maplewood This being the date set and proper notices having been posted and published in
Addition, Maple Valley Hwy accordance with local and State laws, Mayor Keolker opened the public hearing
to consider the proposed annexation and zoning of 60.5 acres, located south of
Maple Valley Hwy. (SR-169), east of 130th Ave. SE, and north and west of the
Cedar River (Maplewood Addition).
Senior Planner Don Erickson reported that the Boundary Review Board (BRB)
approved the original 60.5-acre area as part of an expanded annexation of 345
acres. The first public hearing on zoning for the 345 acres was held on
8/7/2006. He explained that the 11/9/2006 State Supreme Court decision
(Interlake Sporting Association vs. Boundary Review Board) invalidates the
BRB's authority to expand an annexation area's original boundaries; therefore,
this second zoning public hearing is for the original 60.5-acre area.
Mr. Erickson stated that the area contains 161 single-family dwellings and an
Aquifer Protection Area 1. Both Renton and Maplewood Addition Water
Cooperative derive their potable water from sole source aquifers beneath the
Cedar River. Reviewing the public services, he indicated that the area is served
by Maplewood Addition Water Cooperative, Renton sewer, Cedar River Water
and Sewer District, Fire District #25, and the Renton School District. In regards
to the fiscal impact analysis, Mr. Erickson indicated that the estimated annual
fiscal cost to the City is $39,256.
Turning to the zoning of the area, Mr. Erickson reported that existing King
County zoning is R-6 (six dwelling units per gross acre), and the City's
Comprehensive Plan designates the area as Residential Low Density for which
R-4 (four dwelling units per net acre) zoning is proposed. In conclusion, he
relayed staffs recommendation to approve the ordinances.
Public comment was invited.
Iola Puckett, 15270 Pine Dr., Renton, 98058, stated that she had requested to be
a party of record for this matter. However, she clarified that she actually wants
to be a party of record for the annexation of the Wonderland Estates Mobile
Home Park and the Aqua Barn area.
There being no further public comment, it was MOVED BY BRIERE,
SECONDED BY NELSON, COUNCIL CLOSE THE PUBLIC HEARING.
CARRIED.
MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL HOLD
FIRST AND SECOND READINGS OF THE ORDINANCES ANNEXING
THE 60.5-ACRE MAPLEWOOD ADDITION ANNEXATION SITE AND
REZONING THE NON -STREET PORTIONS TO R-4 CONSISTENT WITH
THE COMPREHENSIVE PLAN'S RESIDENTIAL LOW DENSITY
DESIGNATION FOR THIS SITE. CARRIED. (See page 449 for ordinances.)
Planning: East Renton Plateau This being the date set and proper notices having been posted and published in
PAA Future Zoning accordance with local and State laws, Mayor Keolker opened the public hearing
to consider prezoning for the entire East Renton Plateau Potential Annexation
E�
0/
City of Renton
PUBLIC INFORMATION HANDOUT
December It 2006
Sub -District 1-B Planned Action
For additional information, please contact: Jill Ding, Project Manager; City of
Renton Development Services Division; (425) 430-7219
ISSUE:
The Boeing, Co. is requesting approval of planned action legislation, which would be
combined with the Boeing Renton Comprehensive Plan Amendment Environmental
Impact Statement (EIS) completed in October 2003. The approval of planned action
legislation would streamline the permitting process by utilizing existing environmental
documentation, as allowed by RCW 43.21C.031 and WAC 197-11-164, 168 and 315.
As a result of approving planned action legislation, the applicant would be required to
submit an environmental consistency analysis with each phase of the project and receive
subsequent approvals from the City's Environmental Review Committee (ERC). The
consistency analysis would be required as individual master plans and/or site plans are
proposed. In addition, the adoption of planned action legislation provides added
entitlement and scheduling predictability as the developer begins to prepare for the
redevelopment of the 51 acre Sub -District 1-B site.
Boeing submitted a conceptual plan prepared by Seneca Real Estate Group Inc., which
indicates that the northern 31.2 acres of the property is expected to become surplus and
brought forward for redevelopment in the immediate future. This property is under a "right
of first refusal" agreement with Harvest Partners, the owner and developer of the 46 acres
of property formerly owned by Boeing immediately adjacent to this property to the north.
Boeing proposes that this initial parcel be developed with as much as 270,000 square feet
of retail. The remaining property is expected to be retained by Boeing for 5 to 10 years.
However, upon redevelopment, as much as 900,000 square feet of lab and/or office, as
well as some additional retail and multi -family housing, could be developed in and around
the 660,000 square feet of existing office buildings, which are anticipated to be sold and
re -occupied by other companies.
RECOMMENDATION:
The Development Services Division is recommending that the City Council adopt Planned
Action legislation in order to use the existing Boeing Renton Comprehensive Plan
Amendment EIS as the SEPA environmental document for the redevelopment of the Sub -
District 1-B site.
L J
CRO
SUR
. . .......
ti'g
R-
IIISub-District
6
k- mA
FA
10
Sub
-District
m Elf
,L-W mmm
ZZ
'� ��� ►,
a ON �Ad W
Am
oil
M
HIME
Jrban Center North District
Districts Subject to Conceptual Plan Approval
Note; District boundaries kx*jde dedicated R-O-W
Econorak Dmdopiamt Ncighborhoods and Strategic P"jAg
Alen Pidsch. Ad.WareW
-p O. Del liq.rrio
13
Sub -areas
Exhibit '
`ow
Environmental Impact
Statement (EIS) was
completed in October 2003.
Comprehensive Plan
Amendment was completed
in December 2003.
The City and Boeing established
a Development Agreement in December
2003.
A Conceptual Plan for redevelopment
was approved November 14, 2005.
The approved Conceptual Plan includes
approximately 50.7 acres.
3
L
\MF i XIS1lNG ( I EXISTING
\ 1 nvnGE-. GRRRC r
� � OP-2
DP-1 P �DP-3 { ; L/O
MF ! zo UO �, ; L/O i DP-(4'
The 50.7 acre project site can be
divided into 2 major components:
Harvest Partner's has a Right
of first Offer to purchase the
northern 21.2 acres, which is
referred to as the ROFO area-,
and
The remaining 29.5 acres is
referred to as the Boeing
Remainder.
0
R R
R = _ -►
1 ;rR
?EJF❑
Development would likely include:
Large format "destination"
retailer on the nortim'est portion
of the site at the intersection of
Logan Ave N and N h`' Street
I arvest Partners has indicated
the large format retailer would
be 135,000 — 140.000 square feet
in area and approximately 45
Feet in lice ht;
-� Small and Medium format
stIpporting retail shops are
envisioned along both sides of
Park Avenue;
-The small and medium format
retail shops would total 85,000 —
90,000 square feet.
z
1 14
BOCII)g would COIAIIILIC to UtIll/c
4 existing office I)Lllldiil,,s and 3
parkilig ()(11,W-les and no near term
changes are proposed to these
I)Lll]dlllYS.
- - - - - - - - - - - -
Approximately 12.85 acres
' interspersed betNveen the office
CMFll EXISTING EXISTING t)Lllldlii(,s have been identified f'Ol'
G, F' CA AGE
G 1-� Ell ARAGF DP-2 Potential redevelopment and
DP-1 I "
0
P DP-3 WOUld be Subdivided into f'OLII-
CMF—
): DP-4 parcels.
L/O
L
Potential redevelopment would
may IIICIUde:
V Multi -family residential
developilicilt:
V Medium and small format
retalI specialty shops-, and
V Office or lab buildings.
0
I
- Lai-(-Tc format retailer;
Mix of high quality
national, regional and
local specialty tenants
and restaurants.
7
The Planned Action Legislation
Combined with the approved 2003 EIS and
Development Agreement.
Streamlines the permitting process by utilizing
existing environmental documentation:
✓Provides added entitlement and scheduling
predictability.
Allowed under RCW 43.21 C.031 and WAC
297-11-164, 168 and 315.
0
The City Council Cancel the Referral to Committee of'the
Whole Oil this ISSLIC",
Approve the Use of the Existing Environmental
Documentation Contained within the Boeing EIS for
future redevelopment of` the site. Development to occur
consistent with the Approved COIICCPtLial Plan for Sub -
District I -B:
Present the Planned Action Ordinance regarding this
matter for First and Second Reading tonight.
I
O o
' .a o=
n7
CD n
° S' �'
°CD
ono M
°
C"
CD
a CD
CD(
�
d
r. r,
cD
CD
CDCD CD w
�+
►�"
CDCD
a
ulp C-D
��
.,
...
A
cL
oo`°
D
��
°.y
6' � '�' TJ p
p
O
7J
C�
a
O E3 `0 O CD CD
CD a
00
CD
O
C `=0�4
'QCD
� �'
`Z a m tfq
n
a.�: "
°
BCD
p
N w
o
O rn
o CD
::
0
Z
.00,
CD CD
F
°
a •o
C"
Z
n
w
CD C
cro
^t CD �.' "'j O M
CD
<
o. °c°D
ro Tv
y C1 c' m n f pa �CD O
a a ?,
a ? CC, v � o`� �m �, a¢ .•atr� tiQ
Qa a �r-;roan m Z�
CDcrq
CD rt
0
NOTiCE
�'&Vo/ RENTON CITY COUNCIL U CIL
PUBLIC HEARING
ON DECEMBER 11, 2006 AT 7:00 P.M.
RENTON CITY HALL COUNCIL CHAMBERS
1055 SOUTH GRADY WAY
TO CONSIDER THE FOLLOWING: Designating a
planned action for sub -district 1-13 of the Boeing Renton
Plant property, an approximately 51-acre parcel bounded
by Logan Ave. N. on the west, Garden Ave. N. on the east,
N. 8t" St. on the north, and N. 6t" St. on the south.
All interested parties are invited to attend and present written and/or oral comments.
Complete legal description & further information available in the City Clerk's Office — 425-430-6510
Warning! The removal, mutilation, destruction, or concealment of
this notice is a misdemeanor punishable by fine and
imprisonment.
J
LOCATIONS OF POSTINGS FOR: Designating a planned action for sub -district 1-B of the Boeing Renton Plant
property, an approximately 51-acre parcel bounded by Logan Ave. N. on the west, Garden Ave N. on the
east, N. 81h St. on the north, and N. 61h St. on the south.
�'qG- 60, fike `T A)o .
2.
3.
4. (200 ,
N1S�1(vq
5. JU
6.
CERTIFICATION
STATE OF WASRNGTON)
)ss
COUNTY OF KING )
I Z� hereby certify that copies of the attached
notice were posted by me regarding the property described above on the day of
/l o, , 20yU
SIGNED
SUBSCRIBED AND SWORN TO BEFORE ME this 29 day of t" e
20_,�L.
SIGNED:
Printed Name: �� SCs _�
NOTARY PUBLIC in and for the Sta e of
Washington, Residing at o� tG-,-7
My Commission Expires:
1:%Publications\Posting confrmation.doc
Gwba
1'1 RENTON CITY COUNCIL
PUBLIC HEARING
ON DECEMBER 11, 2006 AT 7:00 P.M.
RENTON CITY HALL COUNCIL CHAMBERS
1055 SOUTH GRADY WAY
TO CONSIDER THE FOLLOWING: Designating a
planned action for sub -district 1-B of the Boeing Renton
Plant property, an approximately 51-acre parcel bounded
by Logan Ave. N. on the west, Garden Ave. N. on the east,
N. 8t" St. on the north, and N. 6t" St. on the south.
All interested parties are invited to attend and present written and/or oral comments.
Complete legal description & further information available in the City Clerk's Office — 425-430-6510
Warning! The removal, mutilation, destruction, or concealment of
this notice is a misdemeanor punishable by tine and
imprisonment.
RM
rs'
CITY OF RENTON
NOTICE OF PUBLIC HEARING
RENTON CITY COUNCIL
NOTICE IS HEREBY GI'VEN that the Renton City Council has fixed the 1 lth day of
December, 2006, at 7:00 p.m. as the date and time for a public hearing to be held in the
seventh floor Council Chambers of Renton City Hall, 1055 S. Grady Way, Renton, WA
98055, to consider the following:
Designating a planned action for sub -district 1-B of the Boeing Renton Plant
property, an approximately 51-acre parcel bounded by Logan Ave. N. on the west,
Garden Ave. N. on the east, N. 8th St. on the north and N. 61h St. on the south.
All interested parties are invited to attend the hearing and present written or oral
comments regarding the proposal. Renton City Hall is in compliance with the American
Disabilities Act, and interpretive services for the hearing impaired will be provided upon
prior notice. For information, call 425-430-6510.
Bonnie I. Walton
City Clerk
Published King County Journal
December 1, 2006
Account No. 50640
11/30/2006 - Notice sent to 113 Parties of Record per attached labels.
L.Johnson
cc: Jennifer Henning
�-
F
".
� II
i .._
�fa
S. - -
M
1995 MANN LIMITED FAMILY PA AJAYI JUDITH C ARAGON HECTOR & FRAULEIN
C/O D MANNd 415 WILLIAMS AVE N MACA
17437 SE 102 St RENTONWA 98055 1803 N 185TH ST
,
RENTON, WA 98059 SEATTLE, WA 98133
BARNES CLIFFORD SR & DENICE BOEING COMPANY, THE BRAINARD IRENE
505 WILLIAMS AVE N 100 N RIVERSIDE M/C 5003-4027 1725 SE 16TH PL
RENTON, WA 98055 CHICAGO, IL 60606 RENTON, WA 98055
BROSKA BRYAN P & ANN K BRUSH TRICIA CAO MIN & ZHIDONG WANG
451 WILLIAMS AVE N 514 WILLIAMS AVE N 702 175T" PL NE
RENTON, WA 98055 RENTON, WA 98055 BELLEVUE, WA 98008
CARRILLO JOSE LUIS & ZAYDA N CHENG KAM KEUNG & ANGELA W C CHICOINE, LEE
530 PELLY AVE N 229 SW 193RD PL 406 BURNETT AVE N
RENTON, WA 98055 NORMANDY PARK, WA 98166 RENTON, WA 98055
CHIEN TE-YU CLANCY HEATHER K & MEGAN M COLLINS BRUCE DONALD
C/O PRESTIGE PROP MNGMNT 505 PELLY AVE N PO BOX 2996
12505 BEL-RED RD RENTON, WA 98055 RENTON WA 98056
BELLEVUE, WA 98005
COLLODI FLORIO CORNELIUS WILLIAM E & JODIE C CRECELIUS LEWIS
3709 JONES AVE NE 201 SW 5"' PL. #M-201 428 BURNETT N
RENTON, WA 98056 RENTON, WA 98055 RENTON, WA 98055
CUTTING LARRY D DASH 80 LP DEADMAN ROBERT C
16919 150' AVE SE 440 N FIRST ST #200 520 BURNETT AVE N
RENTON, WA 98058 SAN JOSE, CA 95112 RENTON, WA 98055
DENNISON DAYTON & MARILYNN DETHMAN PAMELA J EMERY SAM E
3717 LK WASH BL N 428 WILLIAMS AVE N 2522 N PROCTOR ST #12
RENTON, WA 98056 RENTON, WA 98055 TACOMA, WA 98406
FACILITIES & OPERATIONS CTR FAKHARZADEH AMIR FARBER KENNETH W
OFFICE OF THE EXECUTIVE DIR 11226 AUBURN AVE S 524 WELLS AVE N
300 SW 7 ST
RENTON, WA 98055 SEATTLE, WA 98178 RENTON, WA 98055
FASHAW PAUL A FEDERAL RECOVERY OF WA FISH JOHN T & N VEANN TAWNEY
436 WILLIAMS AVE N PO BOX 1435 526 PELLY AVE N
RENTON, WA 98055 TACOMA, WA 98401 RENTON, WA 98055
:..+,
FIX GRACE FLYNN TERRY FRANKLIN IRA L & BEVERLY K
PO BOX 202 516 PELLY AVE N 537 WILLIAMS AVE N
DUVALL, WA 98019 RENTON, WA 98055 RENTON, WA 98055
FUNG LAWRENCE H & JUNE C GALLUZZO JOHN & LINDA GASSER JOHN K
6349 52ND AVE S 8519 129TH PL SE 708 N 5TH ST
SEATTLE, WA 98118 NEWCASTLE, WA 98056 RENTON, WA 98055
GIETZEN JEFF D & JENNIFER
GIOMETTI RAY
GRAHAM JOHN M
21701 HWY 99
323 PELLY AVE N
PO BOX 2428
LYNNWOOD, WA 98036
RENTON, WA 98055
KIRKLAND, WA 98083
GREENSTEIN TODD & STACEY
GUNDMUNDSON NANCY L
HABITAT FOR HUMANITY OF
517 PELLY AVE N
102 LAKE AVE S
SEATTLE SOUTH KING COUNTY
RENTON, WA 98055
RENTON, WA 98055
13925 INTERURBAN AVE S, STE A
SEATTLE, WA 98168
HART SHIRLEY
HOLMAN MICHAEL P & ANNETTE L
HOLMES, DENNIS W
512 PELLY AVE N
421 WILLIAMS AVE N
546 N WILLIAMS
RENTON, WA 98055
RENTON, WA 98055
RENTON, WA 98055
HOOT CHERYL L HOWE EVELYN J IRVIS KATHLEEN M
16434 SE 235TH ST 14548 SE 51 ST ST 500 PELLY AVE N
KENT, WA 98042 BELLEVUE, WA 98006 RENTON, WA 98055
JEFF'S AUTO REPAIR INC KAERCHER RICK KOWALSKI EMIL J
21701 HWY 99 PO BOX 8 432 N WILLIAMS ST
LYNNWOOD, WA 98036 HOBART, WA 98025 RENTON, WA 98055
KUNOVSKY ALAN M KURASPEDCANI TIM LUALAINEN, ANGELA
8441 SE 68TH ST #221 PO BOX 208 314 GARDEN AVE N
MERCER ISLAND, WA 98040 MAPLE VALLEY, WA 98038 RENTON, WA 98055
LAWRENCE DAVID T & CHERYL LEAHY JEFFREY M MARSHALL JOHN R M
13306 SE 196TH ST 524 WILLIAMS AVE N 420 WILLIAMS AVE N
RENTON, WA 98058 RENTON, WA 98058 RENTON, WA 98055
MATHWIG DAVID J MCEVOY AL B & SALLY G MEAD ROBERT C
440 PELLY AVE N 18321 SE 147' PL 432 BURNETT AVE N
RENTON, WA 98055 RENTON, WA 98059 RENTON, WA 98055
NNW, "Noe
MORELAND DON & BOB MORITZ GARY MUNAGLIA DOMINIC A & TERR M
809 N 6TH #3 2525 NE 24' ST 518 BURNETT AVE N
RENTON, WA 98055 RENTON, WA 98056 RENTON, WA 98055
MUNSON ERIC M MUNSON RONALD W & ELIZABETH A NAICKER KESVAN
433 WILLIAMS AVE N 623 CEDAR AVE S 8312 132ND ST E
RENTON, WA 98055 RENTON, WA 98055 PUYALLUP, WA 98373
NGUYEN LINH M NICOLI DARIO & CAROL E TRUSTE O'DONIN, MIKE
1509 MCDOUGALL AVE C/O MARIO J NICOLI 423 PELLY AVE N
EVERETT, WA 98201 529 WELLS AVE N RENTON, WA 98055
RENTON, WA 98055
OLSON CARRIE K OLSON JERRY R P & L VENTURES
502 WILLIAMS AVE N 13802 SE 141IT ST 17915 NE 19TH PL
RENTON, WA 98055 RENTON, WA BELLEVUE, WA 98008
ATTN: CORPINC PERAZA EDUARDO & OLGA URQUIETA PETCHNICK GRATZER & GUNDERSON
O BO 1518 ACCOUNTING 508 WILLIAM AVE N 534 WELLS AVE N
BELLEVUE, WA 98009 RENTON, WA 98055 RENTON, WA 98055
POZEGA JUSTIN A PRITCHARD JANELLE RAE RENTON SCHOOL DISTRICT
414 BURNETT AVE N 431 WILLIAMS AVE N 300 SW 7TH ST
RENTON, WA 98055 RENTON, WA 98055 RENTON, WA 98055
REUTIMANN LINDA JEAN RIFFLE GARY M RIFFLE GARY & IiNDA
7025 116TH AVE SE 541 PARK AVE N 16846 188TH AVE SE
NEWCASTLE, WA 98056 RENTON, WA 98055 RENTON, WA 98058
ROGOJIN PETER & LINDA M RUBIO ANTONIO CASTILLO RUSSO ROBERT A
7634 S LAKERIDGE DR 1006 N 5TH ST 528 WELLS AVE N
SEATTLE, WA 98178 RENTON, WA 98055 RENTON, WA 98055
SANTOS CRISPIN C & LILIBETH C SCHULTZ NORMAN CORP SCHULTZ NORA
444 WILLIAM AVE N 7634 S SUNNYCREST RD 540 WILLIAMS AVE N #12
RENTON, WA 98055 SEATTLE, WA 98178 RENTON, WA 98055
SHARMA VISHNU DEO SIMMS DANIEL & VICKIE FRIEND SIMPSON MICHAEL G & ANDREA L
16446 11TH AVE SE 20901 134TH PL SE 450 WILLIAMS AVE N
RENTON, WA 98055 KENT, WA 98042 RENTON, WA 98055
SMITH, JOHN F & SHARON L SWANKE CRAIG D
12216 164TH AVE SE 509 WILLIAMS AVE N
RENTON, WA 98059 RENTON, WA 98055
THOMPSON HEATHER TOMICH RONNIE
702 N 5TH ST 30738 229TH PL SE
RENTON, WA 98055 BLACK DIAMOND, WA 98010
UYSAL MEHMET ULYSAL MEHMET & RAZIYE
527 WILLIAMS AVE N 529 WILLIAMS AVE N
RENTON, WA 98055 RENTON, WA 98055
WEBB PAUL & MELINDA 1 WEISS CONNIE J
541 WELLS AVE N 531 PELLY AVE N
RENTON, WA 98055 RENTON, WA 98055
WIEMEYER CHARLES A II WONG PHILIP J
1220 N 5TH ST 4067 24M PL S
RENTON, WA 98055 SEATTLE, WA 98108
YAMAMOTO DICK ZWICKER RICHARD D & MARTHA G
10811 SE LAKE RD 446 PELLY AVE N
BELLEVUE, WA 98004 RENTON, WA 98055
SHAUNTA HYDE RICK FORD
PO BOX 3707, MC 14-49 PO BOX 3707, MC
SEATTLE, WA 98124 MC 6301
SEATTLE, WA 98124
Jerry Hillis
Hillis, Clark, Martin, & Peterson
Law Offices Rob King
500 Galland Building Harvest Partners
1221 Second Avenue 20503 88th Avenue West
Seattle, WA 98101-2925 Edmonds, WA 98026
THOMASON DEBRA L
916N5TH ST
RENTON, WA 98055
TRAN PHUOC & THI NUOI FANG TU
438 BURNETT AVE N
RENTON, WA 98055
VIDELL VICTOR E & LANCE M
536 BURNETT AVE N
RENTON, WA 98055
WHEELER MELANIE
512 WILLIAMS AVE N
RENTON, WA 98055
WOODALL WENDELL
329 NW 2ND PL
RENTON, WA 98055
BOEING REALTY
PO BOX 3707, MC 1F-58
SEATTLE, WA 98124
JAN FEDOR
PO BOX 3707, MC
MC 6301
SEATTLE, WA 98124
CITY OF RENTON
NOTICE OF PUBLIC HEARING
RENTON CITY COUNCIL
NOTICE IS HEREBY GIVEN that the Renton City Council has fixed the 1Ith day of
December, 2006, at 7:00 p.m. as the date and time for a public hearing to be held in the
seventh floor Council Chambers of Renton City Hall, 1055 S. Grady Way, Renton, WA
98055, to consider the following:
Designating a planned action for sub -district 1-B of the Boeing Renton Plant
property, an approximately 51-acre parcel bounded by Logan Ave. N. on the west,
Garden Ave. N. on the east, N. 8th St. on the north and N. 6th St. on the south.
All interested parties are invited to attend the hearing and present written or oral
comments regarding the proposal. Renton City Hall is in compliance with the American
Disabilities Act, and interpretive services for the hearing impaired will be provided upon
prior notice. For information, call 425-430-6510.
I
Bonnie I. Walton
City Clerk
Published King County Journal
December 1, 2006
Account No. 50640
w
k
November 27, 2006 Renton City Council Minutes , Page 415
hearing process pertaining to the Comprehensive Plan amendments was invalid,
and voiced her support for the appeals that were filed concerning environmental
issues and the public hearing process. Ms. Petersen emphasized that citizens
should not be forced to spend their money on legal services in order to do what
the City should already be doing in regards to these matters.
CONSENT AGENDA Items on the consent agenda are adopted by one motion which follows the
listing.
Council Meeting Minutes of Approval of Council meeting minutes of 11/13/2006. Council concur.
11 / 13/2006
Appointment: Municipal Arts Mayor Keolker reappointed Kristi Hand, 517 Smithers Ave. N., Renton, 98057;
Commission
Marie McPeak, 409 Jefferson Ave. NE, Renton, 98056; Evelyn Reingold, 833
SW Sunset Blvd., L-56, Renton, 98057; and Eleanor Simpson, 418 Wells Ave.
N., Renton, 98057, each to the Municipal Arts Commission for a three-year
term expiring 12/31/2009. Council concur.
Annexation: Preserve Our
Administrative, Judicial and Legal Services Department recommended approval
Plateau, SE 128th St
of a resolution regarding the Preserve Our Plateau Annexation election
requesting that King County produce a voter's pamphlet, authorizing election
steps, and transmitting the ballot title. Council concur. (See page 416 for
resolution.)
Community Services: Henry
Community Services Department recommended approval of the proposed 2007
Moses Aquatic Center Fees
Henry Moses Aquatic Center fee schedule. Refer to Committee of the Whole.
Community Services: Facility
Community Services Department recommended approval of the proposed 2007
and Recreation Fees & Rates
facility and recreation fees and rates schedule related to athletic field fees, Carco
Theatre rental rates, Community Center rental rates, and park picnic shelter
fees. Refer to Committee of the Whole.
Development Services: Boeing
Development Services Department recommended adoption of an ordinance
Subdistrict 1 B Planned Action
regarding the Planned Action for Subdistrict 1 B of the Boeing Renton Plant
y
property; approximately 51 acres bounded by Logan Ave. N., Garden Ave. N.,
N. 8th St., and N. 6th St. Refer to Committee of the Whole; set public hearing
on 12/ 11 /2006.
Development Services:
Development Services Division recommended approval to remove restrictive
Removal of Restrictive
covenants imposed in 1984 (R-83-033) on the Dalpay properties located on
Covenants on Dalpay
Union Ave. NE between NE 12th St. and Sunset Blvd. NE, as the covenants are
Properties, Union Ave NE
now outdated and in conflict with the goals of the current Comprehensive Plan.
Refer to Planning and Development Committee.
Plat: Windstone II, Mt Baker Development Services Division recommended approval of the Windstone II
Ave NE, FP-04-124 Short Plat as a Final Plat; nine single-family lots and one tract on 3.6 acres
located north of NE 17th St. at Mt. Baker Ave. NE. Council concur. (See page
417 for resolution.)
Council: 2007 Legislative Economic Development, Neighborhoods and Strategic Planning Department
Priorities recommended adoption of the proposed 2007 legislative priorities. Refer to
Committee of the Whole.
Annexation: Maplewood Economic Development, Neighborhoods and Strategic Planning Department
Addition, Maple Valley Hwy recommended a public hearing be set on 12/11/2006 to consider the proposed
Maplewood Addition Annexation and associated zoning; 60.5 acres located at
130th Ave. SE and Maple Valley Hwy. Council concur.
MOVED BY CORMAN, SECONDED BY NELSON, COUNCIL APPROVE
THE CONSENT AGENDA AS PRESENTED. CARRIED.
CN..: OF RENTON COUNCIL AGENDA,.,, LL
Submitting Data:
Dept/Div/Board.. Development Services
Staff Contact...... Jill K. Ding, Senior Planner x7219
Subject:
Planned Action for Sub -district 1-B of the Boeing
Renton Plant property.
Exhibits:
Issue Paper
Draft Ordinance
Conceptual Redevelopment Plan
Committee of the Whole Committee Report, which
approved Conceptual Plan (Approved 11/14/2005)
Al #: ,
For Agenda of. November 27, 2006
Agenda Status
Consent ..............
Public Hearing..
Correspondence..
Ordinance............
Resolution............
Old Business........
New Business......
Study Sessions.....
Information.........
X
X
Recommended Action: Approvals:
Refer to Committee of the Whole and set a public Legal Dept......... X
hearing for December 1 lth. Finance Dept......
Other ...............
Fiscal Impact:
Expenditure Required... Transfer/Amendment.......
Amount Budgeted....... Revenue Generated.........
Total Project Budget City Share Total Project..
SUMMARY OF ACTION:
The Boeing, Co. is requesting the approval of an ordinance designating a planned action for sub-
district 1-B of the Boeing Renton Plant property, an approximately 51 acre parcel bounded by
Logan Avenue N on the west, Garden Avenue N on the east, N 8th Street on the north, and N 61h
Street on the south. A conceptual plan was approved by the City Council on
November 14, 2005.
STAFF RECOMMENDATION:
Adopt the proposed Planned Action Ordinance.
Rentannet/agnbill/ bh
nAW
PLANNING/BUILDING/
♦ PUBLIC WORKS DEPARTMENT
M E M O R A N D U M
DATE:
October 27, 2006
TO:
Randy Corman, Council President
Members of the Renton City Council
VIA:
Kathy Keolker, Mayor
FROM:
Gregg Zimmerma ministrator
Planning/Building/Public Works Department
STAFF CONTACT: Jill Ding (ext. 7219)
SUBJECT:
Sub -district 1-B Planned Action Ordinance
ISSUE•
Should the City of Renton adopt the proposed Planned Action Ordinance prepared by
The Boeing Co., which would be combined with the Boeing Renton Comprehensive Plan
Amendment Environmental Impact Statement (EIS) completed in October of 2003?
RECOMMENDATION:
Staff recommends adopting the proposed Planned Action Ordinance.
BACKGROUND SUMMARY:
The Boeing, Co. is requesting approval of planned action legislation, which would be
combined with the Boeing Renton Comprehensive Plan Amendment Environmental
Impact Statement (EIS) completed in October 2003. The approval of planned action
legislation would streamline the permitting process by utilizing existing environmental
documentation, as allowed by RCW 43.21C.031 and WAC 197-11-164, 168 and 315.
As a result of approving planned action legislation, the applicant would be required to
submit an environmental consistency analysis with each phase of the project and receive
subsequent approvals from the City's Environmental Review Committee (ERC). The
consistency analysis would be required as individual master plans and/or site plans are
proposed. In addition, the adoption of planned action legislation provides added
entitlement and scheduling predictability as the developer begins to prepare for the
redevelopment of the 51 acre site.
Boeing submitted a conceptual plan prepared by Seneca Real Estate Group Inc., which
indicates that the northern 31.2 acres of the property is expected to become surplus and
brought forward for redevelopment in the immediate future. This property is under a
"right of first refusal" agreement with Harvest Partners, the owner and developer of the
46 acres of property formerly owned by Boeing immediately adjacent to this property to
the north. Boeing proposes that this initial parcel be developed with as much as 270,000
Page 2 of 2 w
October 27, 2006
square feet of retail. The remaining property is expected to be retained by Boeing for 5 to
10 years. However, upon redevelopment, as much as 900,000 square feet of lab and/or
office, as well as some additional retail and multi -family housing, could be developed in
and around the 660,000 square feet of existing office buildings, which are anticipated to
be sold and re -occupied by other companies.
CONCLUSION:
If the proposed Planned Action Ordinance were adopted by Council, the permitting
process would be streamlined by utilizing existing environmental documentation.
h:\division.s\develop.ser\dev&plan.ing\jkd\issue papers\subdist I b.doc
FuuIR s�a�s G�NCEPTUAL PLAN
ARCHITECTS
SUB -DISTRICT 1-BKL
'�®'F��''�
'
. x 4TORY
_
E
BIOG_
47AI'IAEit
QN8L.OG:
�f20�1f00 SF}
:IV=
tip,
'..
:PARKING GARAGE
LSG
R RETAIL
L LAB
O OFFICE
P PARKING GARAGE
M f MULTI -FAMILY
PEDESTRIAN
CONNECTIONS
GARAGE
NOTE:
MAX TWO
6-STORY BLOW.
I=OFFICE
(300.000 SF)
WITH NEW 23 STORY
PARKING GARAGE
r
DRAFT 10/ 10/06 8: 51 AM
CITY OF RENTON, WASHINGTON
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON
DESIGNATING A PLANNED ACTION FOR SUB -DISTRICT 1-B OF THE
BOEING RENTON PLANT PROPERTY, AN APPROXIMATELY 51
ACRE PARCEL BOUNDED BY LOGAN AVENUE N., GARDEN
AVENUE N., NORTH 8TH STREET, AND 6TH STREET
WHEREAS, RCW 43.21C.031 and WAC 197-11-164, - 168, and - 172 allow and
govern the application of a Planned Action designation; and
WHEREAS, an Environmental Impact Statement has been prepared to study the impacts
of redeveloping a portion of Boeing's Renton Plant property, which EIS is titled the Boeing
Renton Comprehensive Plan Amendment EIS ("EIS"); and
WHEREAS, the EIS analyzed the potential environmental impacts of mixed -use
development on that portion of the Boeing Renton Plant known as Sub -District I-B (see Exhibit
A); and
WHEREAS, by Ordinance No. '5026, the City has amended the Comprehensive Plan
Land Use Map for the Boeing Renton Plant from Employment Area — Industrial (EA -I),
Employment Area — Transition (EA-T) and Employment Area Office (EA-0) to Urban Center
North (UC-N), and
WHEREAS, by Ordinance. No. 5027, the City has amended the Zoning Map for the
Boeing Renton Plant from Center Office Residential (COR) and Commercial Office (CO), to
Urban Center North 1 (UC-N 1); and
WHEREAS, in 2003, the City and Boeing entered into a Development Agreement based
on the analysis in the EIS, which is recorded under King County recording number
("Boeing Development Agreement")
WHEREAS, on November 7, 2005, the City approved a Conceptual Plan for Sub -
District 1-B ("I B Conceptual Plan"), attached as Exhibit B; and
WHEREAS, an Environmental Consistency Analysis has been prepared for Sub -District
1B, which compares the proposed I Conceptual Plan to the range of development alternatives
analyzed in the EIS; and
WHEREAS, this Ordinance designates certain land uses and activities within Sub -
District 1-B as "Planned Actions" that are consistent with the Urban Center North 1 (UC-NI)
designation and zone;
103003-0166-000000/10869322_2.DOCI I
ORDINANCE NO.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO ORDAIN AS FOLLOWS:
SECTION I. Purpose. The City of Renton declares that the purpose of this
ordinance is to:
A. Set forth a procedure designating certain project actions within Sub -District 1-B
as "Planned Actions" consistent with state law, RCW 43.21C.031; and
B. Provide the public with an understanding as to what constitutes a Planned Action
and how land use applications which qualify as Planned Actions within Sub -District I-B will be
processed by the City; and
C. Streamline and expedite future land use permit review processes for development
in the Sub -District 1-B area that is consistent with the I Conceptual Plan by relying on existing
detailed environmental analysis for this area.
SECTION H. Findings. The City Council finds that:
A. The EIS addresses all significant environmental impacts associated with the
scenarios described in the EIS for Alternatives 1, 2, 3, and 4 as referenced therein, and the 1B
Conceptual Plan is encompassed by and consistent with those Alternatives; and
B. The mitigation measures contained in the Boeing Development Agreement,
together with the City's development standards, and standard mitigation fees (Parks, Fire and
Traffic), are adequate to mitigate any significant adverse environmental impacts of the proposed
1B Conceptual Plan; and
C. The expedited permit review procedure set forth in this Ordinance is and will be a
benefit to the public, will protect the environment, and will enhance economic development; and
D. Opportunities for public involvement have been provided as part of the
Comprehensive Plan redesignation, the Boeing Plant rezone, the EIS, and the Conceptual Plan
review and approval process for Sub -District I-B.
SECTION III. Designation of Planned Action; Procedure and Criteria for
Evaluating and Establishing Projects as Planned Actions.
A. Planned Action Designated. The Planned Action designation shall apply to the
Sub -District 1-B site, as shown on Exhibit A, and associated off -site improvements. Uses and
activities described in the 113 Conceptual Plan, attached as Exhibit B, subject to the thresholds
described in Alternatives 1, 2, 3, and 4 analyzed in the EIS, and subject to the mitigation
measures required by City Codes or contained in the Boeing Development Agreement, are
designated Planned Actions pursuant to RCW 43.21.C.031 _ Additionally, the Planned Action
designation shall apply to any off -site improvements necessitated by the proposed development
on Sub -District 113, where the off -site improvements have been analyzed in the EIS.
f03003-0166-000000/10869322 2.DOCI 2
ORDINANCE NO.
B. Environmental Document. A Planned Action designation for a site -specific
permit application shall be based on the environmental analysis contained in the EIS. The
Development Agreement, together with existing City codes, ordinances, standard mitigation fees,
and standards, shall provide the framework for a decision by the City to impose conditions on a
Planned Action project. Other environmental documents incorporated by reference in the EIS
may also be utilized to assist in analyzing impacts and determining appropriate mitigation
measures.
C. Planned Action Threshold.
l . The land uses and development levels established by the 1 B Conceptual
Plan, together with their customary accessory uses and amenities and associated off -site
improvements, shall be considered Planned Actions pursuant to RCW 43.21.C.031.
If amendments of the approved 1B Conceptual Plan exceed the maximum development
parameters reviewed in the EIS, supplemental environmental review may be required under
SEPA Rules.
D. Planned Action Review Criteria
1. The Director of Development Services, or the Director's designee, is
hereby authorized to designate a project application as a Planned Action pursuant to RCW
43.21 C.031(2)(a), if the project application meets WAC 197-11-172 and all of the following
conditions:
a) The project is located on Sub -District 1-B, or is an off -site
improvement directly related to a proposed development on Sub -District 1-B; and
b) The project is consistent with the Renton Comprehensive Plan
adopted under RCW 36.70A; and
c) The Director has determined that the project's significant
environmental impacts have been adequately addressed in the EIS by reviewing the
environmental checklist or other project review form as specified in WAC 190-11-315; and
d) The project complies with the Planned Action threshold described
in this Ordinance; and
e) The Director has determined that the project's significant impacts
have been mitigated through the application of the Boeing Development Agreement, as well as
other City requirements, standard mitigation fees, and conditions, which together constitute
sufficient mitigation for any significant environmental impacts associated with Sub -District 1-B
development; and
f) The proposed project complies with all applicable local, state and
federal regulations, and where appropriate, needed variances or modifications or other special
permits have been requested, and
[03003-0166-000000110869322_2.DOC1 3
on
ORDINANCE NO.
g) The proposed project is not an essential public facility.
E. Effect of Planned Action.
1. Upon designation by the Director that the project qualifies as a Planned
Action, the project shall not be subject to a SEPA threshold determination, an environmental
impact statement (EIS), or any additional review under SEPA_
2. Designation as a Planned Action means that a proposed project has been
reviewed in accordance with this Ordinance, and found to be consistent with the development
parameters and environmental analysis included in the EIS.
3. Planned Actions will not be subject to further procedural review under
SEPA. However, projects will be subject to conditions designed to mitigate any environmental
impacts which may result from the project proposal, and projects will be subject to whatever
permit requirements are deemed appropriate by the City under State and City laws and
ordinances.
F. Planned Action Permit Process.
The Director shall establish a procedure to review projects and to determine whether they
meet the criteria as Planned Actions under State laws and City codes and ordinances. The
procedure shall consist, at a minimum, of the following:
1. Development applications shall meet the requirements of RMC Chapters
4-8 and 4-9. Applications shall be made on forms provided by the Department and shall include
a SEPA checklist or revised SEPA checklist [where approved through WAC 197-11-315(2)] or
such other environmental review forms provided by the Planning/Building/Public Work
Department. The checklist may be incorporated into the form of an application;
2. The Director shall determine whether the application is complete as
provided in RMC Chapter 4-8.
3. If the project application is within Sub -District 1-B, the application shall
be reviewed to determine whether the proposed application is consistent with and meets all of the
qualifications specified in section III of this Ordinance.
4. Upon review of a complete application by the City, the Director shall
determine whether the project qualifies as a Planned Action. If the project does qualify, the
Director shall notify the applicant, and the project shall proceed in accordance with the
appropriate permit procedure, except that no additional SEPA review, threshold determination,
or EIS shall be required.
5. Public notice for projects that qualify as Planned Actions shall be tied to
the underlying permit. If notice is otherwise required for the underlying permit, the notice shall
state that the project has qualified as a Planned Action. If notice is not otherwise required for the
underlying permit, no notice is required.
103003-016"00000/10969322_2.DOC) 4
ORDINANCE NO.
6. If a project does not qualify as a Planned Action, the Director shall notify
the applicant and prescribe an appropriate SEPA review procedure consistent with City SEPA
procedures and state laws. The notice to the applicant shall describe the elements of the
application that result in disqualification as a Planned Action.
7. Projects disqualified as a Planned Action may use or incorporate relevant
elements of the EIS, as well as other environmental documents to assist in meeting SEPA
requirements. The Environmental Review Committee may choose to limit the scope of the
SEPA review to those issues and environmental impacts not previously addressed in the EIS.
SECTION IV. Validity Period. This Planned Action Ordinance shall be
reviewed no later than December 31, 2030 by the Development Services Director to determine
its continuing validity with respect to the environmental conditions of the subject site and
vicinity and applicability of Planned Action requirements. Based upon this review, the
Ordinance may be amended as needed, and another validity period may be specified.
SECTION V. Conflict. In the event of a conflict between the Ordinance or any
mitigation measures imposed pursuant thereto and any other ordinance, or regulation of the City,
the provisions of this Ordinance shall control, EXCEPT that provision of any Uniform Code
shall supersede.
SECTION VI. Severability. Should any section, subsection, paragraph, sentence,
clause or phrase of this Ordinance or its application be declared unconstitutional or invalid for
any reason, such decision shall not affect the validity of the remaining portions of this Ordinance
or its application to any other person or situation.
SECTION VII. This ordinance shall be effective upon its passage, approval, and
five days after publication.
PASSED BY THE CITY COUNCIL this day of June, 2006.
Is/ BONNIE I. WALTON
Bonnie I. Walton, City Clerk
j03003-016"00000110969322 2.DOCj 5
ORDINANCE NO.
APPROVED BY THE MAYOR this day of , 2006..
Is/ KATHY KEOLKER-WHEELER
Kathy Keolker-Wheeler, Mayor
Approved as to form:
103003-0166-000000110869322_2.DOC) 6
M
M
Laura N. Whitaker
PHoxg 206.359.8584
rwx: 206.359.9584
EWAM:
Iwhitaker@perkinscoie.com
September 30, 2005
Mr. Neil Watts
Development Services Department
City of Renton
200 Mill Avenue South
Renton, WA 98055
PeceIvet)
Oct o's f
si�NFcA
GRovp
Perkins
Coin
12oi Third Avenue, Suite 4800
Seattle, WA 981ol-3099
PHONE: 2o6.359.8000
FAX: 2o6.359.9000
www.perkinscoie.com
Re: Boeing Renton Plant Redevelop ment/Application for Conceptual Plan
and Planned Action Approvals for Subdistrict 1B
Dear Mr. Watts:
As you know, the 2003 Development Agreement between the City and Boeing
addresses the process by which land owned by Boeing and located within the UC-N
zone may be segregated. Among other things, the Development Agreement provides
that a Conceptual Plan must be developed and approved for certain "Subdistricts"
prior to their segregation, which Subdistricts include "Subdistrict 1B," an area
commonly known as the 10-80 site, Lot 10 and other Boeing -owned parcels east of
Logan Avenue and south of 8th Street.
Pursuant to the Development Agreement and guided by the development envelope
established by the Environmental Impact Statement prepared in 2003 to disclose
potential impacts of eventual Renton Plant redevelopment, Boeing has developed a
Conceptual Plan for Subdistrict 1B (the "Subdistrict 1B Conceptual Plan" or
"Conceptual Plan") and hereby submits it to the City for review and approval. As you
will see, the Conceptual Plan is consistent with the overall densities assumed by the
EIS for Subdistrict 1B. It is also consistent with the range of uses both allowed within
the UC-N zone and assumed by the alternative, "mix -and -match" development
scenarios analyzed in the EIS.
10300370166/SB052700.2151
ANCHORAGE - BEIJING BELLEVUE • BOISE • CHICAGO - DENVER HONG KONG - LOS ANGELES
MENLO PARK • OLYMPIA PHOENIX • PORTLAND - SAN FRANCISCO SEATTLE - WASHINGTON, O.C.
Perkins Coie LLP and Affiliates
Mr. Neil Watts
September 30, 2005
Page 2
In addition to Subdistrict 113 Conceptual Plan approval pursuant to the Development
Agreement, Boeing also seeks approval of Planned Action status for the Subdistrict
I Conceptual Plan pursuant to the requirements of the State Environmental Policy
Act and the Renton Municipal Code. Boeing bases its Planned Action request on the
fact that, subject to the development thresholds established by the Development
Agreement and summarized below, environmental impacts of potential
redevelopment of Subdistrict 1B have been fully disclosed for purposes of SEPA.
Subdistrict 1B Planned Action/Summary of Conceptual Plan Consistency with 2003
EIS and UC-N Development Standards
1. Building Heights — Building heights proposed within Subdistrict 1B would not
exceed maximum heights allowed in the UC-N 1 zone. It is anticipated that, relative
to heights reviewed in the EIS, proposed increases in height greater than 10% would
require additional SEPA review addressing aesthetics and shadows.
2. Transportation
a) Trip Ranges: The range of trips proposed in the Subdistrict 1B
Conceptual Plan was reviewed in the EIS.
b) Trip Threshold: The Subdistrict IB Conceptual Plan proposes a level of
trip generation and distribution consistent with levels analyzed in the EIS. It is
anticipated that development which would exceed the maximum trip levels
shown in the EIS would complete additional SEPA review.
c) Road Improvements: The Planned Action would require on -site and
off -site road improvements. These road improvements have been analyzed in
the EIS. It is anticipated that significant changes to the road improvement plan
that have the potential to significantly increase impacts to air quality, water
quality, fisheries resources, or noise levels beyond the levels analyzed in the
EIS would require additional SEPA review.
3. Earth — The level of development proposed by the Subdistrict 1B Conceptual
Plan is consistent with development levels analyzed in the EIS. It is anticipated that a
significant change in amount of grading assumed in the EIS which has the potential to
adversely affect water quality or fisheries require additional SEPA review.
[03003-0166/SB052700.215] 09/30/05
Mr. Neil Watts
September 30, 2005
Page 3
4. Air Quality — The EIS addresses air quality impacts generated by traffic levels
associated with redevelopment that are consistent with development levels proposed
by the Subdistrict 1B Conceptual Plan. It is anticipated that a significant change in
configuration, increase in building heights, or significant decrease in setbacks
between residential and manufacturing uses deemed to significantly affect localized
air quality and odor conditions could require additional SEPA review.
5. Water — The level of development proposed by Subdistrict 113 Conceptual Plan
is consistent with development levels analyzed in the EIS. It is anticipated that the
following changes by the Planned Action scenarios to the Alternatives analyzed in the
EIS could require additional SEPA review:
a) Change in peak flows to Johns Creek significantly exceeding the levels
reviewed in the EIS.
b) Increase in number of outfalls to Johns Creek or Lake Washington
relative to the number of required outfalls assumed in the EIS.
6. Public Services and Utilities — The level of development proposed by the
Subdistrict I Conceptual Plan is consistent with development levels analyzed in the
EIS. It is anticipated that a significant increase in the number of square feet or
dwelling units beyond the maximum number analyzed in the EIS could require
additional SEPA review to address impacts to fire, police, schools, parks, water,
wastewater or solid waste, as applicable.
7. Cumulative Impacts — When analyzed together with previously approved and
currently proposed Subdistrict IA redevelopment, Subdistrict 1B development levels
do not exceed the level of total development for District 1 analyzed in the EIS.
For the reasons set forth above and in the proposed Subdistrict 1B Conceptual Plan,
we request that the City approve the Subdistrict 1B Conceptual Plan and designate the
Conceptual Plan as a Planned Action for purposes of SEPA. Please don't hesitate to
contact me if you have any questions. Thank you for your consideration of this
request.
[03003-0166/SB052700.215] 09/30/05
Mr. Neil Watts
September 30, 2005
Page 4
Very truly I �U 1yourrs�,/� //'L���16l
Laura N. Whitaker
TBH:tbh
cc: Alex Pietsch
Jeff Adelson
Shaunta Hyde
Laura Lohman
(03003-0166/SB052700.2151 09/30/05
41
THE BOEING COMPANY
CONCEPTUAL REDEVELOPMENT PLAN
SUB -DISTRICT 1-B
Submitted to the City of Renton
October 3, 2005
n
M
0-
CONCEPTUAL REDEVELOPMENT PLAN
Sub -District 1-B
Renton, Washington
Background
The Boeing Company has been working with the City of Renton since early 2003 to
evaluate potential redevelopment strategies associated with its 737 facility in Renton,
Washington (the "Renton Plant Site"). In December 2003, The Boeing Company and
The City of Renton entered into a Development Agreement that established certain roles
and responsibilities for the potential phased redevelopment of all or a portion of the
Renton Plant Site, including:
• Renton commitments to fund and construct certain public infrastructure
improvements;
• Boeing commitments to fund certain private aspects of redevelopment; and
■ Boeing commitments to complete Conceptual Plans when it elects to $ubdivide,
develop, sell, or otherwise alter any property for uses not related to airplane
manufacturing.
Per the terms of the Development Agreement, Conceptual Planning was anticipated to
occur incrementally, and would be completed for three discrete areas of the Site, known
as Sub -Districts 1-A and 1-B, and District 2 (see Exhibit 1). City Council approved
Boeing's Conceptual Plan for Sub -District 1-A in December 2003 and amended it in
October 2004. Boeing subsequently sold this portion of the Site to Harvest Partners in
December 2004.
Harvest Partners is currently refining its development plan for Sub -District 1-A, which is
also sometimes referred to as both Lots 1 — 4 and Lakeshore Landing. Harvest Partners'
preliminary planning anticipates the development of an urban retail center containing
approximately 800,000 square feet of retail, with the potential for additional hotel, office
space and multifamily residential units. Construction of the retail project is anticipated to
begin in 2006.
Sub -District 1-B
Sub -District 1-B is located immediately to the south of Lakeshore Landing, as illustrated
on Exhibit 2, and totals approximately 50.7 acres, net of that portion which has been
reserved for the extension of a four -lane 8`i' Avenue between Logan and Park Avenues.
As is outlined within the 2003 Development Agreement, the construction of two new
lanes along this segment of 8th is necessary to support the redevelopment of Sub -District
1-B (see Exhibit 3).
Page I of 9
October 3, 2005
*4r we
The City of Renton is currently completing its design for this segment of 8`h Avenue and
expects to begin building at least the two northern -most lanes in March, 2006,
simultaneous with the other infrastructure improvements necessary to support the
redevelopment of Sub -District 1-A. Ultimately, two additional lanes (to the south) along
this same segment of 8t' will be required to support the redevelopment of District 2.
Harvest Partners has a Right of First Offer t6 purchase a portion of the Sub -District
which totals approximately 21.2 acres (see Exhibit 3). Harvest Partners has indicated
-Aheir interest in developing this portion, known as the ROFO area, with retail uses that are
complementary with the proposed development of Sub -District 1-A as an urban retail
center. The development intent of the ROFO area as depicted with this Conceptual
Redevelopment Plan is based upon feedback from Harvest Partners as to their proposed
project and from The City of Renton as to their goals for redevelopment within the Urban
Center North.
The remainder of Sub -District 1-B contains approximately 29.5 acres and is described
herein as the "Boeing Remainder", as illustrated on Exhibit 2. Portions of the Boeing
Remainder are currently improved with office buildings that Boeing owns and will
continue to utilize as part of on -going airplane manufacturing plant operations.
Interspersed between these existing office buildings are approximately 12.85 acres of the
Boeing Remainder that have been identified as potential development parcels ("DP 1"
through "DP 4") within this Conceptual Plan.
Submittal
Included within this submittal are a narrative description of Boeing's proposal for Sub -
District 1-B, a Conceptual Planning Diagram, and two economic benefit analyses
demonstrating a range of potential one-time and recurring revenues generated by:
(1) Development illustrated within the Planning Diagram on the ROFO portion of the
Sub -District (beginning in 2007); and
(2) Development illustrated within the Planning Diagram on the Boeing Remainder
(beginning in 2007 for DP 1 and in 2016 for DP 2 — DP 4).
Boeing seeks the City's approval of this Conceptual Plan so that it can complete a
Binding Site Plan creating additional lots, and finalize negotiations with Harvest Partners
related to the acquisition of the ROFO portions of the Sub -District. The timing of a land
surplus decision by Boeing or redevelopment associated with the majority of the Boeing
Remainder (with the exception of DP 1) is not currently envisioned to occur sooner than 5
to 10 years in the future.
Page 2 of 9
October 3, 2005
t � ff, {� ��a} � ��' -. S�
�, y� 5 ,Gn :r }��1 • � {�J� . � �� Y'iY T
y
j `P
*40*
Conceptual Development Plan
Ai
P P
The Conceptual Plan for Sub -District 1-B is comprised of two somewhat distinct parts.
The ROFO area makes up the northern portion of the property along 8`hAvenue, has been
identified as surplus by Boeing operations, and is available for near -term redevelopment.
The Boeing Remainder makes up the southern portion of the Sub -District, and contains
660,000 square feet of existing office space with re -use potential and approximately
12.85 acres of land with future redevelopment potential.
ROFO Area
Boeing recognizes that high -quality retail development is essential to the successful
transition of the area from its industrial roots to the City's vision for the Urban Center -
North. Harvest Partners and the City are both committed to ensuring that the
`
development at Lakeshore Landing is well -designed and initiates redevelopment of a
quality and at a scale which is consistent with the City's long-term vision for the area.
As planning for Lakeshore Landing has progressed, the land south of 8a' has been
identified as an important component of the overall project. The area, known as the
ROFO portion of Sub -District 1-B, has been illustrated within this Conceptual Plan as an
integral part of the retail development planned to the North.
The ROFO portion of the Sub -District is envisioned to contain a large format
"destination" retailer located along Logan Avenue, with supporting retail shops space
concentrated along both sides of Park Avenue. Generally, the large format retail
development (users with footprints of 50,000 square feet or larger, and building heights
up to 45 feet) is planned to occur along 8`h and Logan, facing eastward toward Park
Avenue. The supporting retail shops space would include a mixture of medium format
retailers (ranging between 10,000 and 50,000 square feet in area, with building heights up
to 40 feet) and some component of smaller, specialty retail shops overlooking Park
Avenue.
The Plan anticipates pedestrian connections to occur internally within the site both east
toward Park Avenue, and south toward 6a' Avenue. Vehicle access would occur off of
Park Avenue, with loading and delivery functions relying upon Garden Avenue and an
internal service road running along the southern edge of the ROFO line.
property
At a maximum lot coverage ratio of 30%, the ROFO site could accommodate up to
270,000 square feet of retail space. Harvest's current planning anticipates a total of
225,000 to 230,000 square feet, comprised ofa 135,000—140,000 square -foot large
format retailer located along Logan, and 85,000 to 90,000 square -feet of shops space.
Parking is located in -well -organized surface parking lots, with primary pedestrian
entrances facing inward or directed toward Park Avenue.
A small portion of the site, containing a data hub for the Boeing Plant, needs to be
retained by Boeing for the foreseeable future. It can be accommodated along the
Page 5 of 9
October 3, 2005
southern portion of a mid -block parking field without having a negative impact on the
surrounding retail uses.
Summary
Redevelopment of the ROFO parcel as envisioned within this Conceptual Plan meets
many of the City's vision and policy statements for the Urban Center -North, which call
for "retail integrated into pedestrian -oriented shopping districts." This site is located
within District 1, where the City identifies its first objective as follows:
"Create a major commercial/retail district developed with uses that add significantly to
Renton's retail tax base, provide additional employment opportunities within the City,
attract businesses that serve a broad market area and act as a gathering place within the
community."
Boeing Remainder
This portion of the plan is significantly influenced by the presence of four, 1980s-vintage
office buildings that are located throughout (the 10-13, 10-16, 10-18 and 10-20
buildings). Each structure is 5 — 6 stories in height, ranging between 160,000 and
170,000 square feet. Parking is accommodated in separate, structured garages and in
surrounding surface lots, at an overall ratio of 4.5 stalls per 1,000 square feet. Boeing
currently utilizes these four buildings and anticipates no near -term changes that would
result in significant rehab or sale of the structures.
In addition to the existing office buildings, there is also a 1960s-vintage lab building,
known as the 10-71 building, located along Logan Avenue. Although the condition of
the building and the planned widening of Logan Avenue may impact its potential re -use,
Boeing and the City are interested in exploring viable adaptive re -use opportunities. To
illustrate the potential capacity for redevelopment within the Conceptual Plan, the 10-71
building has been assumed to be demolished, creating a 4.9-acre development parcel
between Logan Avenue and the 10-20 building (DP1). However, Boeing would like to
retain the flexibility of considering either re -use of the existing structure or
redevelopment in the future.
We have assumed that the existing office buildings remain, but could be supported in the
future by parking at a market -driven ratio of 3.5 stalls per 1,000 square feet, rather than at
Boeing's more conservative rate. As a result, surplus parking stalls exist within the three
existing parking garages, and three additional development parcels are created: a 3.9-acre
site between the 10-18 and 10-20 buildings (DP2); a 1.8-acre site on the west side of Park
Avenue north of 6th (DP3); and, a 2.2-acre site on the west side of Garden Avenue north
of 6th (DP4).
Page 6 of 9
October 3, 2005
a
DPI
N
This 4.9-acre parcel is located along Logan Avenue, immediately south of the ROFO
property. Fronting on 6th Avenue, it is also adjacent to the 10-20 office building and
associated parking structure. Given its location and near -term redevelopment potential,
the Plan envisions its redevelopment as either a mid -rise, multifamily project or,
potentially, a retail development ancillary to that anticipated on the ROFO piece. If,
instead, the existing building were re -used, it is envisioned that it would be of interest
either as a cost-effective research and development or contract manufacturing facility.
With the demolition of the existing structure, the DP-1 site could support a significant
multi -family project, either incorporated in one or more stories above ground -floor
retailers, or developed at higher densities as a single use project. A five- to six -story
residential project, developed at densities of 110 units per acre, would be both consistent
with the residential development currently planned at Lakeshore Landing and compatible
with the surrounding uses. At this higher density, approximately 535 units could be sited
on DP 1.
Alternately, redevelopment of the DP 1 parcel could accommodate up to 65,000 square
feet of retail space at a 30% lot coverage ratio, taking the form of additional medium -
format and small, specialty shops space backing up against Logan. Although access
would most likely occur off of 66iAvenue, the development of DPI could be integrated
with the larger retail development occurring on the ROFO parcel.
M DP2 and DP4
These two parcels are both infill opportunities that exist when parking requirements for
the existing office buildings are reduced. Currently underutilized and serving for the
most part as overflow parking areas for Boeing employees, the Plan envisions their
redevelopment with 6-story office or lab buildings, consistent with the current
development pattern.
In some instances where new lab development is planned, surplus parking within existing
garages could fully support new development, and allow for the creation of new, private
open spaces or campus greens within the neighborhood. In order to create this surplus
parking opportunity, the Plan assumes either that the four existing Boeing office
buildings are sold to other users with market -based parking requirements or that Boeing
provides new parking areas on the Plant to accommodate its employees.
The Conceptual Plan illustrates the potential redevelopment of each of these parcels with
laboratory uses, resulting in approximately 720,000 square feet of new space in four
separate structures. Both DP2 and DP4 could accommodate two, 6-story structures
containing 180,000 square feet each. A new 2- to 3-story parking garage would be
constructed between the new buildings on DP2, and the additional parking needs would
be provided by ear -marking a portion of the stalls within the 10-20 parking garage. On
Page 7 of 9
October 3, 2005
i
DP4, sufficient surplus parking exists within the existing 10-18 parking garage that no
new parking would need to be constructed in this location.
Alternately, either DP2 or DP4 could also be redeveloped with new office uses. Given
the greater parking requirement for office space (3.5/1,000) when compared to lab space
(1/1,000), less development is able to be accommodated on the parcels. On DP2, a
single, 6-story structure would be developed, containing 120,000 square feet. New
structured parking would be developed behind. On DP4, approximately 300,000 square
feet could be constructed in two, 6-story buildings, with all parking still provided within
the existing 10-18 building garage.
DP3
This parcel is located just south of the 10-18 office building, at the corner of 6`h and Park
Avenues. The Plan envisions the development of this parcel with new lab or office uses,
in both cases housed within a single 6-story structure. If developed as lab space, the
building could contain approximately 180,000 square feet, supported by dedicated
parking stalls within a new, multi-user garage constructed on DP2. If developed as office
space, a building of approximately 120,000 square feet could be constructed on site, with
parking either provided in a new garage on DP3 or accommodated by providing
additional parking levels within a DP2 garage.
Alternately, the DP3 parcel could accommodate up to 24,000 square feet of neighborhood
retail space, fronting on Park Avenue and offering amenities to the surrounding workers
and residents. Although no redevelopment of the land on the other side of Park Avenue
is envisioned as part of this Conceptual Plan, redevelopment of DP3 could also lead to
other improvements along Park Avenue at key intersections. It is envisioned that, if
developed with retail uses, DP3 would begin to meet the increased demands for amenities
and services that redevelopment along the 6t' Avenue corridor would require.
Summary
Redevelopment as illustrated within this Conceptual Plan would be consistent with the
City's Urban Center -North vision and long-range planning policies, creating a vibrant,
mixed -use corridor on the north side of 6 h Avenue and along Park, with mid -rise
buildings fronting the streets and structured parking behind. If new development took the
form of multi -family and laboratory space, the corridor would contain a total 535 new
multi -family units and 900,000 square feet of new lab space at full build -out. This new
mix of uses would be at a scale consistent with the 660,000 square feet of existing office
space already located in the corridor.
Page 8 of 9
October 3, 2005
2
rirp NNW
Economic Benefit Analysis Summary
Boeing's Conceptual Redevelopment Plan for Sub -District 1-B seeks to both allow for
the near -term redevelopment of Boeing's underutilized assets while advocating for a mix
of uses that significantly improves the City's tax and employment base. Two economic
benefit analyses (Exhibit 4) have been completed to support this submittal, demonstrating
the potential one-time and recurring revenues generated by:
(1) Development illustrated within the Planning Diagram on the ROFO portion of the
Sub -District (beginning in 2007); and
(2) Development illustrated within the Planning Diagram on the Boeing Remainder
(beginning in 2007 for DP 1 and in 2016 for DP 2 — DP 4).
The economic benefits to the City of Renton associated with the redevelopment of the
ROFO portion of the site can be summarized as follows:
■ By 2008 (project stabilization), it is estimated that over 1,061 jobs would be
created in the City of Renton alone; of this job total, 859 direct jobs would be
located within the development and 202 would be indirect City jobs;
■ The City is estimated to gain one-time revenues of nearly $667,000 during
redevelopment of the parcels;
■ The City is also forecast to_receive an increase in recurring annual tax revenues of
nearly $856,000, beginning in 2008.
The economic benefits to the City of Renton associated with the redevelopment of the
Boeing Remainder portion of the site (DP 1 — 4) can be summarized as follows:
■ By 2013 (project stabilization), it is estimated that over 2,100 jobs would be
created in the City of Renton alone if this portion were developed with
multifamily and lab uses as illustrated on the Conceptual Plan; of this job total,
1,700 direct jobs would be located within new buildings and 400 would be
indirect City jobs;
■ Under this same set of land use assumptions, the City is estimated to gain one-
time revenues of more than $6.2 million during redevelopment of the parcels;
■ The City is also forecast to receive an increase in recurring annual tax revenues of
nearly $2.3 million, beginning in 2013.
Page 9 of 9
October 3, 2005
r'
District 5ijh-are
r
TRenton — Sub District 1 B
it
11
rn
M
1
i
ECONOAHC BENEFIT STUDY
BOEING SUB DISTRICT 1-11 PROPERTY
RENTON, WASHINGTON
I I. PURPOSE
BoeingReal Realty Corporation (BRC) is seeking to estimate the community economic
benefits of redeveloping certain Sub District I -B property under option by Harvest
Partners at its Renton, Washington facility into additional retail land uses. This
"right of first option" (ROFO) property is the Phase I1 expansion of Harvest
Partners' development underway on Boeing's Renton Sub District IB property
The ROFO Phase II land area being considered for redevelopment as retail space
by Harvest Partners is comprised of 21.20 net acres. It is only a portion of the
50.70 gross acres that comprises Boeing's entire Sub District 1-B Renton property.
The specific purpose of this document is to show City of Renton the economic
benefits derived from Harvest Partners redeveloping this target ROFO property if
fully developed as follows:
Retail —Shop Space 91,000
Retail —Big Box 135,000
Total 226,000 Sq. Ft.
I The analysis presents an estimate of economic benefits if Harvest Partners excises
their option to purchase the targeted Renton Boeing parcels. The benefits are
measured by comparing the full redevelopment of this property as retail uses
between 2006 and 2008 versus no action. Economic impacts have been measured
(one-time and recurring) in terms of :
➢ Jobs
➢ Income
➢ Property values
➢ Public revenues
State of Washington
King County
City of Renton
' y,26JL(tO Page 1
PeWte& 9mam
H. LIMITATIONS
The economic benefit findings of redeveloping Harvest Partners ROFO parcels
into retail space are only as valid as the underlying assumptions.' These
assumptions reflect reasonable approximations of actual economic experience in
the marketplace. The economic benefit model developed for this assignment
reflects these assumptions. It is the culmination of a series of computer -based
sensitivity analyses.
M. OVERALL ECONOMIC BENEFIT FINDINGS
Redevelopment of the Harvest Partners ROFO portion of the Boeing Renton Sub
District 1B property into retail uses will result in positive economic impacts for
the City of Renton, King County and the State of Washington. The text, charts
and tables that follow summarize economic findings by comparing job, income
and property value differences by year 2008 between `redevelopment" of the
Harvest Partners ROFO parcels versus "no use" scenarios. A summary of key
findings follow:
➢ By 2008 (project stabilization), an estimated 1,667 jobs would be created if
the target 21.20 acres comprising Harvests Partners ROFO parcels in Sub
District 1-B are fully redeveloped and absorbed into shop space and big box
retail uses?
➢ Of this job total, an estimated 859 direct jobs would be created in the
redeveloped buildings and 808 indirect jobs would be created by 2008.
➢ These jobs would generate an additional $ 80 million in recurring annual
income at full occupancy in 2008.
➢ Of this income total, nearly $45 million in direct income would be created
on the redeveloped Sub District 1-B ROFO parcels and over $35 million in
indirect income would be created in 2008 and thereafter.
➢ The corresponding increase in property values for the Harvest Partners
ROFO parcels is forecast at nearly $53 million by 2008.
1 Although not guaranteed, the economic benefit estimates expressed in this document are intended to
reflect information from sources deemed to be authoritative and reliable. All monaaryfigures are
expressed in 2005 doUars.
2 This job total includes both direct and indirect jobs. Indirect jobs is the measure of secondaryjob creation
resulting (induced) from expenditures associated with direct job creation.
9l26�2 Page 2
➢ The increase in recurring annual tax revenues by 2008 to the State of
Washington is estimated at nearly $5.1 million. This is in addition to
nearly $3.8 million in one-time state revenues collected during
redevelopment and absorption of the additional retail space on the Harvest
Partners ROFO parcels.
IV. RENTON ECONOMIC BENEFIT FINDINGS
The economic benefits to the City of Renton of Harvest Partners redeveloping this
excess Boeing property in Sub District 1-B are now summarized:
➢ By 2008, it is estimated that over 1,061 jobs would be created in the City of
Renton alone from redeveloping these Harvest Partners ROFO parcels in
Sub District 1-B. Of this job total, an estimated 859 direct jobs would be
created in the redeveloped buildings and 202 indirect City jobs would be
created by 2008.
➢ The City of Renton is estimated to gain one-time revenues of nearly
$667,000 during redevelopment of the Harvest Partners ROFO Sub District
1-B parcels.
➢ The City is also forecast to receive an increase in recurring annual tax
revenues of nearly $856,000 in 2008 and thereafter upon full build -out and
absorption of the new retail space.
Table 1 summarizes these estimated benefits to the City in terms of new jobs,
income and municipal revenues. These data reflect one-time benefits during
development as well as estimates of annually recurring economic benefits. For
example, during the assumed 2006 through 2008 development period, accrued
City tax revenues are estimated to generate over $66,000 during land development
and over $601,000 during construction of the retail shop and big box space.
Sources for these municipal revenues are sales tax and real estate transfer taxes.
Once the retail space is completed and absorbed (2008 estimate), annually
recurring tax revenues are projected at nearly $856,000. Nearly $187,000 of this
total will result from the City of Renton's share of property taxes. Annual sales
taxes generated from the retail space is estimated to exceed $584,000. The City's
employee head tax is forecast to generate over $58,000 each year and real estate
transfer taxes are estimated at over $26,000 annually.
Dde6ed: gmnoo5___ ._
3;?(�:'1)(i Page 3
...•
Table 1
CITY OF RENTON ECONOMIC BENEFITS
HARVEST PARTNERS ROFO PARCELS
HARVEST PARTNERS SUB DISTRICT 1-B
vne-ume Lanci One-time Building Recurring
Redevelopment Scenario Development I Development 2006-2007 1 in 2008
CITY JOBS
Direct Jobs
Indirect Jobs
Total Jobs
ANNUAL INCOME
Direct Income
Indirect Income
Total Income
CITY TAX REVENUES
Property Tax
Sales Tax
Empioyce Head Tax
Real Estate Transfer Tax
Total Tau Revenues
42
92
859
16
39
202
58
131
1,061
S 2,121,030
S 9,432,720
$ 44,657,600
S 678,445
S 3,394,707
$ 8,889,439
S 2,799,475
$ 12,817,427
S 53,547,039
$ 186,873
S 66,379
$ 295,201
$ 584,225
$ 58,346
S 306,257
$ 26,325
$ 601,458
$ 855,769
Chart I shows that 1,061 permanent jobs are estimated to be created within the
City of Renton. Of these, 859 would be direct on -site jobs in the City of Renton,
resulting in an estimated 202 additional indirect off -site jobs in the City. This
assumes that one quarter of the indirect jobs created occur within the City of
Renton. This compares to no such jobs without the redevelopment of the Harvest
Partners ROFO property in Boeing's Renton Sub District 1-13 area.
Chart 1
City of Renton Permanent Jobs Created In 2008
1,200
Soo
400
- I i
With Project Without Project
926r2004
Page 4
{ Deleted: 923/2005
U
t
I
Chart 2 illustrates that these jobs will generate new annual income within the City
of Renton estimated at nearly $54 million. This corresponding income reflects
both indirect off -site as well as direct on -site income creation in 2008 and
thereafter.
Chart 3 shows the increases in City of Renton property values of redeveloping the
Harvest Partners ROFO parcels in Sub -District 1-13. After redevelopment
completion in 2008, the assessed value of these parcels is estimated to increase
from $8.6 million to nearly $61.3 million —an increase of $52.7 million.
Chart 3
PROPERTY VALUE INCREASES BY 2008
REDEVELOPMENT OF HARVEST PARTNERS ROFO
PROPERTY
Without Project $8.6
With Project $61.3
$0 $26 $50 $76
Dollars in millions
1 9I261222"0
Page 5
l d_9/232005
Chart 4 shows that the City of Renton will accrue one-time tax revenues from
sales and real estate transfer taxes of nearly $668,000 during the estimated 2006
through 2007 development period. In addition, the City is forecast to increasingly
receive annually recurring tax revenues from redevelopment of the Harvest
Partners ROFO portion of Boeing's Renton Sub District I-B property starting in
2007. This will increase until 2008 where it peaks at nearly $856,000 as an
ongoing annual cash flow to the City.
42M
Chart 4
New City Of Renton Tax Revenues
$1,000,000
S800,000
A
d
aSM,000 ® Recurring
S400,000 ■ Onetime
i✓
U S200,000
S-
2008 2009 2010 2011 2012 2013
Page 6
Deleted: 9,a3/2005
il
11
r
H
I
I
ECONOMIC BENEFIT STUDY
WASHINGTON
I. PURPOSE
Boeing Realty Corporation (BRC) is seeking to estimate the community economic
benefits of redeveloping four parcels in Boeing Sub District I-B at its Renton,
Washington facility into a new mix of lab and multi -family land uses. The land
area of these redevelopment parcels comprises 12.85 net acres. It is only a portion
of the 50.70 gross acres comprising Boeing's Sub District I-B Renton property.
The proposed new land use mix for these four Boeing redevelopment parcels
resulted from an evaluation of the holding capacity of these excess properties and
from market potential considerations.
The specific purpose of this document is to show City of Renton economic
benefits derived from redeveloping these four targeted Boeing Renton parcels if
fully developed as follows:
Lab 900,000
Multi -Family 535,500
Total 1, 435,500 Sq. Ft.
The analysis presents an estimate of economic benefits if the targeted Renton
Boeing parcels are entirely redeveloped and absorbed between 2008 and 2013
versus no action. Economic impacts have been measured (one-time and recurring)
in terms of :
➢ Jobs
➢ Income
➢ Property values
➢ Public revenues
State of Washington
King County
City of Renton
II. LIMITATIONS
The economic benefit findings of redeveloping the four Boeing Renton parcels
comprising 12.85 net acres into modern lab and multi -family space are only as
yr26120f} Page I
{ Deleted: %23l2005
i
11
11
I
11
' valid as underlying assumptions.' These assumptions reflect reasonable
approximations of actual economic experience in the marketplace. The economic
benefit model developed for this assi p gnment reflects these assumptions and is the
culmination of a series of computer -based sensitivity analyses.
A III. OVERALL ECONOMIC BENEFIT FINDINGS
Redevelopment of the four Boeing Renton parcels into the proposed uses will
result in positive economic impacts for the City of Renton, King County and the
State of Washington. The text, charts and tables that follow summarize economic
findings by comparing job, income and property value differences by year 2013
between "redevelopment' of the four Boeing parcels versus "no use" scenarios.
A summary of key findings follow:
➢ By 2013 (project stabilization), an estimated 3,300 jobs would be created if
the target 12.85 acres comprising four Boeing parcels in Sub District 1-B
are fully redeveloped and absorbed into lab and multi -family uses.2
➢ Of this job total, an estimated 1,700 direct jobs would be created in the
redeveloped lab buildings and 1,600 indirect jobs would be created by
2013.
➢ These lab jobs would generate an additional $ 158 million in recurring
annual income at full occupancy in 2013.
➢ Of this income total, over $88 million in direct income would be created on
the redeveloped Sub District 1-B parcels and over $70 million in indirect
income would be created in 2013 and thereafter.
➢ The corresponding increase in property values for the four target Renton
redevelopment parcels is forecast at over $550 million by 2013.
➢ The increase in recurring annual tax revenues by 2013 to the State of
Washington is estimated at over $3.6 million. This is in addition to over
$33.5 million in one-time state revenues collected during redevelopment
and absorption of new lab and multi -family space on the four Boeing
parcels at the Renton Sub District 1-B site.
'Although not guaranteed, the economic benefit estimates expressed in this document are intended to
reflect information from sources deemed to be authoritative and reliable. AU monetary figures are
expressed in 2005 doQam
Z This job total includes both direct and indirect jobs. Indirect jobs is the measure of secondaryjob creation
resulting (induced) from expenditures associated with direct job creation.
Deleted: 9R3/2005
Page 2
I
If
iy
IV. RENTON ECONOMIC BENEFIT FINDINGS
The economic benefits to the City of Renton of redeveloping Boeing's four parcels
of excess property in Sub District I -B are now summarized.
➢ By 2013, it is estimated that over 2,100 jobs would be created in the City of
Renton alone from redeveloping these four Boeing parcels in Sub District
1-13. Of this job total, an estimated 1,700 direct jobs would be created in
the new lab buildings and 400 indirect jobs in the City would be created by
2013.
➢ The City of Renton is estimated to gain one-time tax revenues of over $6.2
million during redevelopment ofthe four Boeing Sub District 1-B parcels.
➢ The City is also forecast to receive an increase in recurring annual tax
revenues of over $2.3 million in 2013 and thereafter upon full build -out and
absorption of the new lab and multi -family space.
Table 1 summarizes these estimated benefits to the City in terms of new jobs,
income and municipal revenues. These data reflect one-time benefits during
development as well as estimates of annually recurring economic benefits. For
example, during the assumed 2008 through 2012 development period, accrued
City tax revenues are estimated to generate over $40,000 during land development
and over $6,168,000 during construction of lab buildings and multi -family
structures. Sources for these one-time municipal revenues are sales tax and real
estate transfer taxes.
I
Once the lab and multi -family buildings are completed and absorbed (2013
estimate), annually recurring tax revenues are projected at over $2,343,000.
Nearly $1,953,000 of this total will result from the City of Renton's share of
property taxes. The City's employee head tax is forecast to generate over
$115,000 each year and real estate transfer taxes are estimated at over $275,000
annually.
I
I
1 2 261200_ Page 3
I
(Deleted• 9=005
I
I
+i
NW V
t
Table 1
CITY OF RENTON ECONOMC BENEFITS
BOEING SUB DISTRICT 1-B DEVELOPMENT PARCELS
One-time Land One-time Building Recurring
Redevelopment Scenario Development I Development 2008-2012 in 2013
CITY JOBS
Direct Jobs 25 381 1,700
Indirect Jobs 9 159 400
Total Jobs 34 540 2,100
ANNUAL INCOME
Direct Income S IX5,625 S 49,960,680 S 123,146,400
Indired Income $ _ 411,248 $ 34,962,754 $ 17,596,700
Total Income $ 1,696,873 S 94,923,434 $ 140,743,100
,7 CITY TAX REVENUES
+� Property Tax $ 1,952,593
Sales Tax $ 40,2M S 3,049,318 S -
Employee Head Tax S 115,496
Real Estate Transfer Tax $ 3,118,965 $ 275,071
Total Tax Revenues $ 40,234 S 6,168,283 S 2,343,160
Chart 1 shows that 2,100 permanent jobs are estimated to be created within the
City of Renton. Of these, rl. 0 would be direct on -site lab jobs in the City of
i Renton, resulting in an esti d 400 additional indirect off -site jobs in the City.
This assumes that one quarter of the indirect jobs created occur within the City of
Renton. This compares to no such jobs without the redevelopment of the four
Boeing Sub District 1-B parcels.
Chart 1
City of Renton Permanent Jobs Created In 2013
3,000
2,000 2,100
1,000EMU
With Project Without Project
DeleEed:923l1flU5 _
y; 26/20Q� Pa$e 4
Chart 2 illustrates that these jobs will generate new annual income within the City
of Renton estimated at nearly $141 million. This corresponding income reflects
both indirect off -site as well as direct on -site income creation in 2013 and
thereafter.
Chart 2
Chart 3 shows the increases in City of Renton property values of redeveloping the
four Boeing parcels in Sub -District 1 B. After redevelopment completion in 2013,
the assessed value of these parcels is estimated to increase from under $74 million
to nearly $624 million —an increase of $550 million.
. Chart 3
PROPERTY VALUE INCREASES BY 2013
BOEING SUBDISTRICT 1,B DEVELOPMENT PARCELS
Without Project $73.7
With Project 5623.8
$0 $200 $400 $600
Dollars In millions
1 9/26/200
Page 5
WOW: 9/23/2005
Chart 4 shows that the City of Renton will accrue one-time tax revenues from
sales and real estate transfer taxes of over $6,208,000 during the estimated 2008
through 2012 development period. In addition, the City is forecast to increasingly
receive annually recurring tax revenues from redevelopment of the four Sub
District I-B parcels starting in 2009. This will increase each year until 2013
where it peaks at over $2,343,000 million as an annual flow into the City.
Chart 4
New City Of Renton Tax Revenues
$3,000,000
v,
w
m $2,000,000
d
a ■Recurring
® Onetime
S1,000,000
U
S-
2008 2009 2010 2011 2012 2013
1 9/26%200-
Page 6
{ Deleted. 9R3/2005 �
M
M
11
Table 1
CITY OF RENTON ECONOMIC BENEFITS
FOUR BOEING DEVELOPMENT PARCELS
BOEING RENTON SUB DISTRICT 1-11 PROPERTY
one-time Land One-time Building Recurring
Redevelopment Scenario I Development I Development 2008-2012 1 in 2013
CITY JOBS
Direct Jobs
Indirect Jobs
Total Jobs
ANNUALINCOME
Direct Income
Indirect Income
Total Income
CITY TAX REVENUES
Property Tax
Sales Tax
Employee Head Tax
Real Estate Transfer Tax
Total Tax Revenues
25 381 1,700
9 159 400
34 540 2,100
$
1,285,625
$
49,960,680
$
123,146,400
$
411,248
$
34,962,754
$
17,596,700
$
1,696,873
$
84,923,434
$
140,743,100
$
1,952,593
$
40,234
$
3,049,318
$
-
$
115,496
$
3,118,965
$
275,071
$
40,234
$
6,168,283
$
2,343,160
HARVEST PARTNERS ROFO PARCELS
BOEING RENTON SUB DISTRICT 1-11 PROPERTY
p I One-time Land I Ones me Building I Recurring
Redevelopment Scenario Development Development 2006-2007 In 2008
CITY JOBS
Direct Jobs
Indirect Jobs
Total Jobs
ANNUAL INCOME
Direct Income
Indirect Income
Total Income
CITY TAX REVENUES
Property Tax
Sales Tax
Employee Head Tax
Real Estate Transfer Tax
Total Tax Revenues
42 92 859
16 39 202
58 131 1,061
$ 2,121,030 $ 9,432,720 $ 44,657,600
$ 678,445 $ 3,394,707 $ 8,889,439
$ 2,799,475 $ 12,817,427 $ 53,547,039
$ 186,873
$ 66,379 $ 295,201 $ 584,225
$ 58,346
$ 306,257 $ 26,325
$ 66,379 $ 601,458 $ 855,769
FINAL--C=bkmd Benef is—Rev1 P 9/26/2005
The Aete ..A....e—#-A —._ I- - - .. .. .. srw r CI+TwTC cnnuniu�n
COMBINED ECONOMIC BENEFITS
HARVEST PARTNERS ROFO PARCELS & BOEING DEVELOPMENT PARCELS
BOEING RENTON SUB DISTRICT I-B PROPERTY
Redevelopment Scenario
One4ime Land
Development
One-time Building
Development 2006-2012
Recurring
in 2013
CITY JOBS
Direct Jobs
67
473
2,559
Indirect Jobs
25
198
602
Total Jobs
92
671
31161
ANNUAL INCOME
Direct Income
$
3,406,655
$ 59,393,400
$
167,804,000
Indirect Income
$
1,089,693
$ 38,347,461
$
26,486,139
Totallncome
$
4,496,348
$ 97,740,861
$
194,290,139
CITY TAX REVENUES
Property Tax
$
2,139,466
Sales Tax
$
106,613
$ 3,344,519
$
584,225
Employee Head Tax
$
173,942
Real Estate Transfer Tax
$ 3,425,222
$
301,396
Total Tax Revenues
$
106,613
$ 6,769,741
$
3,198,929
FINAL —Combined Benefits --Revs P 91=005
fleaf GC- IATG=d`e%#leUWW-C
Ir
cm
0
TOTAL CITY OF RENTON ECONOMIC BENEFITS
BOEING & HARVEST PARTNERS PARCELS
COMBINED DEVELOPMENT IN SUB DISTRICT 1-11
City of Renton Permanent Jobs Created In 2013
4,000
3,161
3,000
2,000
1,000
With Project Without Project
$200
New Job Annual Income in 2013
$194
S150
`a
S100
S50
$`
I
With Project Without Project
New City Of Renton Tax Revenues
S4,000,000
$3,000,000
S210001000 0 Recurring
ii ■ Onetime
H
S1,000,000
$
2006 2007 2008 2009 2010 2011 2012 2013
FINAL —Combined Benefits —Reel P Ormow
The data and calculations presented herein while not guaranteed, have been obtained from sources believed to be reliable. REAL ESTATE ECONOMICS
AM'71P�0VED DY �!
COMMITTEE OF THE WHOI V CiTV COONUL
COMMITTEE REPORT
Date
November 14, 2005
Boeing Subdistrict 113 Conceptual Plan
(Referred October 17, 2005)
The Committee of the Whole recommends concurrence with the staff recommendation to adopt the
Conceptual Plan proposed by The Boeing Company for the potential redevelopment of 50.7-acres of
Boeing property in the South Lake Washington area known as Subdistrict 113 with the conditions
outlined below. The northern 21.2 acres of the property is expected to become surplus and brought
forward for redevelopment in the immediate future. This property is under a "right of first refusal'
agreement with Harvest Partners, the owner and developer of the 46 acres of property formerly owned
by Boeing immediately adjacent to this property to the north. Boeing proposes that this intial parcel be
developed with as much as 270,000 square feet of retail. The remaining property is expected to be
retained by Boeing for five to 10 years. However, upon redevelopment, as much as 900,000 square feet
of lab and/or office, as well as some additnai'retail aid multi -family housing, could be developed in
and around the 660,000 square feet ofexisting office buildings;�which are anticipated to be sold and re-
occupied by other companies.
To enhance the plan and its consistency with the Vision and Policies for the Urban Center —North
adopted in the Comprehensive Plan; the following caditions should be imposed on the Conceptual
Plan:
1) That Park Avenue be designated a "Pedestrian=oriented Street," `#o ensure an urban form of
development and provide pedestrian linkages ltween the subdistrict and the planned
retail/entertainment center expectedstio be developed to the north, and
2) That a transit facility would bean allowed use in the immediately available property, if funding for
such a facility emerged and it could be developed in a way "that was supportive of surrounding
redevelopment and supported by the property owrier(s).
The envisioned retail and employment center resulting from the redevelopment proposed under the
conditioned Conceptual Plan will have positive economic and social impacts for the City as a whole.
As outlined in the 2003 Development Agreement with The Boeing Company, all subsequent land use
applications related to this property will be checked against this document for consistency prior to
approval.
i
Terri Briere, C uncil President
cc: Alex Pietscb
Gregg Zimmerman
Neil Watts
Jennifer Henning
Nancy'Weil .
DATE:
TO:
VIA: -�
FROM:
STAFF CONTACT:
SUBJECT:
ISSUE:
PLANNING/BUILDING/
PUBLIC WORKS DEPARTMENT
M E M O R A N D U M
October 27, 2006
Randy Corman, Council President
Members of the Renton City Council
Kathy Keolker, Mayor
Gregg Zimmermar�ministrator
Planning/Building/Public Works Department
Jill Ding (ext. 7219)
Sub -district 1-B Planned Action Ordinance
Should the City of Renton adopt the proposed Planned Action Ordinance prepared by
The Boeing Co., which would be combined with the Boeing Renton Comprehensive Plan
Amendment Environmental Impact Statement (EIS) completed in October of 2003?
RECOMMENDATION:
Staff recommends adopting the proposed Planned Action Ordinance.
BACKGROUND SUMMARY:
The Boeing, Co. is requesting approval of planned action legislation, which would be
combined with the Boeing Renton Comprehensive Plan Amendment Environmental
Impact Statement (EIS) completed in October 2003. The approval of planned action
legislation would streamline the permitting process by utilizing existing environmental
documentation, as allowed by RCW 43.21C.031 and WAC 197-11-164, 168 and 315.
As a result of approving planned action legislation, the applicant would be required to
submit an environmental consistency analysis with each phase of the project and receive
subsequent approvals from the City's Environmental Review Committee (ERC). The
consistency analysis would be required as individual master plans and/or site plans are
proposed. In addition, the adoption of planned action legislation provides added
entitlement and scheduling predictability as the developer begins to prepare for the
redevelopment of the 51 acre site.
Boeing submitted a conceptual plan prepared by Seneca Real Estate Group Inc., which
indicates that the northern 31.2 acres of the property is expected to become surplus and
brought forward for redevelopment in the immediate future. This property is under a
"right of first refusal" agreement with Harvest Partners, the owner and developer of the
46 acres of property formerly owned by Boeing immediately adjacent to this property to
the north. Boeing proposes that this initial parcel be developed with as much as 270,000
Page 2 of 2 `' W
October 27, 2006
CM
square feet of retail. The remaining property is expected to be retained by Boeing for 5 to
10 years. However, upon redevelopment, as much as 900,000 square feet of lab and/or
office, as well as some additional retail and multi -family housing, could be developed in
and around the 660,000 square feet of existing office buildings, which are anticipated to
be sold and re -occupied by other companies.
CONCLUSION:
If the proposed Planned Action Ordinance were adopted by Council, the permitting
process would be streamlined by utilizing existing environmental documentation.
h:\division.s\develop.ser\dev&plan.ing\jkd\issue papers\subdistlb.doc
DRAFT 10/ 10/06 8: 51 AM
CITY OF RENTON, WASHINGTON
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON
DESIGNATING A PLANNED ACTION FOR SUB -DISTRICT 1-B OF THE
BOEING RENTON PLANT PROPERTY, AN APPROXIMATELY 51
ACRE PARCEL BOUNDED BY LOGAN AVENUE N., GARDEN
AVENUE N., NORTH 8TH STREET, AND 6TH STREET
WHEREAS, RCW 43.21C.031 and WAC 197-11-164, - 168, and - 172 allow and
govern the application of a Planned Action designation; and
WHEREAS, an Environmental Impact Statement has been prepared to study the impacts
of redeveloping a portion of Boeing's Renton Plant property, which EIS is titled the Boeing
Renton Comprehensive Plan Amendment EIS ("EIS"), and
WHEREAS, the EIS analyzed the potential environmental impacts of mixed -use
development on that portion of the Boeing Renton Plant known as Sub -District 1-B (see Exhibit
A); and
WHEREAS, by Ordinance No. 5026, the City has amended the Comprehensive Plan
Land Use Map for the Boeing Renton Plant from Employment Area — Industrial (EA -I),
Employment Area — Transition (EA-T) and Employment Area Office (EA-0) to Urban Center
North (UC-N); and
WHEREAS, by Ordinance. No. 5027, the City has amended the Zoning Map for the
Boeing Renton Plant from Center Office Residential (COR) and Commercial Office (CO), to
Urban Center North 1 (UC-N 1); and
on the
WHEREAS, in 2003, the City and Boeing entered into a Development Agreement based
analysis in the EIS, which is recorded under King County recording number
("Boeing Development Agreement")
WHEREAS, on November 7, 2005, the City approved a Conceptual Plan for Sub -
District 1-B ("1B Conceptual Plan"), attached as Exhibit B; and
WHEREAS, an Environmental Consistency Analysis has been prepared for Sub -District
1 B, which compares the proposed 1 B Conceptual Plan to the range of development alternatives
analyzed in the EIS; and
WHEREAS, this Ordinance designates certain land uses and activities within Sub -
District 1-B as "Planned Actions" that are consistent with the Urban Center North 1 (UC-NI)
designation and zone;
j03003-03 66-000000! 109693222.DOC j 1
K
ORDINANCE NO.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON,
WASHINGTON, DO ORDAIN AS FOLLOWS:
SECTION I. Purpose. The City of Renton declares that the purpose of this
ordinance is to:
A. Set forth a procedure designating certain project actions within Sub -District 1-B
as "Planned Actions" consistent with state law, RCW 43.21C.031, and
B. Provide the public with an understanding as to what constitutes a Planned Action
and how land use applications which qualify as Planned Actions within Sub -District I-B will be
processed by the City, and
C. Streamline and expedite future land use permit review processes for development
in the Sub -District 1-B area that is consistent with the IB Conceptual Plan by relying on existing
detailed environmental analysis for this area.
SECTION II. Findings. The City Council finds that:
A. The EIS addresses all significant environmental impacts associated with the
scenarios described in the EIS for Alternatives 1, 2, 3, and 4 as referenced therein, and the 1B
Conceptual Plan is encompassed by and consistent with those Alternatives; and
B. The mitigation measures contained in the Boeing Development Agreement,
together with the City's development standards, and standard mitigation fees (Parks, Fire and
Traffic), are adequate to mitigate any significant adverse environmental impacts of the proposed
IB Conceptual Plan; and
C. The expedited permit review procedure set forth in this Ordinance is and will be a
benefit to the public, will protect the environment, and will enhance economic development; and
D. Opportunities for public involvement have been provided as part of the
Comprehensive Plan redesignation, the Boeing Plant rezone, the EIS, and the Conceptual Plan
review and approval process for Sub -District I-B.
SECTION HI. Designation of Planned Action; Procedure and Criteria for
Evaluating and Establishing Projects as Planned Actions.
A. Planned Action Designated. The Planned Action designation shall apply to the
Sub -District 1-B site, as shown on Exhibit A, and associated off -site improvements. Uses and
activities described in the 1B Conceptual Plan, attached as Exhibit B, subject to the thresholds
described in Alternatives 1, 2, 3, and 4 analyzed in the EIS, and subject to the mitigation
measures required by City Codes or contained in the Boeing Development Agreement, are
designated Planned Actions pursuant to RCW 43.21.C.031. Additionally, the Planned Action
designation shall apply to any off -site improvements necessitated by the proposed development
on Sub -District 1B, where the off -site improvements have been analyzed in the EIS.
[03003-0166-000000/10969322 2.DOC1 2
ORDINANCE NO.
B. Environmental Document. A Planned Action designation for a site -specific
permit application shall be based on the environmental analysis contained in the EIS. The
Development Agreement, together with existing City codes, ordinances, standard mitigation fees,
and standards, shall provide the framework for a decision by the City to impose conditions on a
Planned Action project. Other environmental documents incorporated by reference in the EIS
may also be utilized to assist in analyzing impacts and determining appropriate mitigation
measures.
C. Planned Action Threshold.
l . The land uses and development levels established by the 113 Conceptual
Plan, together with their customary accessory uses and amenities and associated off -site
improvements, shall be considered Planned Actions pursuant to RCW 43.21.C.031.
If amendments of the approved 113 Conceptual Plan exceed the maximum development
parameters reviewed in the EIS, supplemental environmental review may be required under
SEPA Rules.
D. Planned Action Review Criteria.
1. The Director of Development Services, or the Director's designee, is
hereby authorized to designate a project application as a Planned Action pursuant to RCW
43.21 C.031(2)(a), if the project application meets WAC 197-11-172 and all of the following
conditions:
a) The project is located on Sub -District 1-B, or is an off -site
improvement directly related to a proposed development on Sub -District 1-B; and
b) The project is consistent with the Renton Comprehensive Plan
adopted under RCW 36.70A; and
c) The Director has determined that the project's significant
environmental impacts have been adequately addressed in the EIS by reviewing the
environmental checklist or other project review form as specified in WAC 190-11-315, and
d) The project complies with the Planned Action threshold described
in this Ordinance; and
e) The Director has determined that the project's significant impacts
have been mitigated through the application of the Boeing Development Agreement, as well as
other City requirements, standard mitigation fees, and conditions, which together constitute
sufficient mitigation for any significant environmental impacts associated with Sub -District 1-B
development, and
0 The proposed project complies with all applicable local, state and
federal regulations, and where appropriate, needed variances or modifications or other special
permits have been requested; and
103003-0166-000000110969322_2_DOC] 3
ORDINANCE NO.
g) The proposed project is not an essential public facility.
E. Effect of Planned Action.
1. Upon designation by the Director that the project qualifies as a Planned
Action, the project shall not be subject to a SEPA threshold determination, an environmental
impact statement (EIS), or any additional review under SEPA.
2. Designation as a Planned Action means that a proposed project has been
reviewed in accordance with this Ordinance, and found to be consistent with the development
parameters and environmental analysis included in the EIS.
3. Planned Actions will not be subject to further procedural review under
SEPA. However, projects will be subject to conditions designed to mitigate any environmental
impacts which may result from the project proposal, and projects will be subject to whatever
permit requirements are deemed appropriate by the City under State and City laws and
ordinances.
F. Planned Action Permit Process.
The Director shall establish a procedure to review projects and to determine whether they
meet the criteria as Planned Actions under State laws and City codes and ordinances. The
procedure shall consist, at a minimum, of the following:
1. Development applications shall meet the requirements of RMC Chapters
4-8 and 4-9. Applications shall be made on forms provided by the Department and shall include
a SEPA checklist or revised SEPA checklist [where approved through WAC 197-11-315(2)] or
such other environmental review forms provided by the Planning/Building/Public Work
Department. The checklist may be incorporated into the form of an application;
2. The Director shall determine whether the application is complete as
provided in RMC Chapter 4-8.
3. If the project application is within Sub -District 1-B, the application shall
be reviewed to determine whether the proposed application is consistent with and meets all of the
qualifications specified in section III of this Ordinance.
4. Upon review of a complete application by the City, the Director shall
determine whether the project qualifies as a Planned Action. If the project does qualify, the
Director shall notify the applicant, and the project shall proceed in accordance with the
appropriate permit procedure, except that no additional SEPA review, threshold determination,
or EIS shall be required.
5. Public notice for projects that qualify as Planned Actions shall be tied to
the underlying permit. If notice is otherwise required for the underlying permit, the notice shall
state that the project has qualified as a Planned Action. If notice is not otherwise required for the
underlying permit, no notice is required.
{03003-0166-000000/10869322_2.DOC1 4
a
ORDINANCE NO.
6. If a project does not qualify as a Planned Action, the Director shall notify
the applicant and prescribe an appropriate SEPA review procedure consistent with City SEPA
procedures and state laws. The notice to the applicant shall describe the elements of the
application that result in disqualification as a Planned Action.
7. Projects disqualified as a Planned Action may use or incorporate relevant
elements of the EIS, as well as other environmental documents to assist in meeting SEPA
requirements. The Environmental Review Committee may choose to limit the scope of the
SEPA review to those issues and environmental impacts not previously addressed in the EIS.
SECTION IV. Validity Period. This Planned Action Ordinance shall be
reviewed no later than December 31, 2030 by the Development Services Director to determine
its continuing validity with respect to the environmental conditions of the subject site and
vicinity and applicability of Planned Action requirements. Based upon this review, the
Ordinance may be amended as needed, and another validity period may be specified.
SECTION V. Conflict. In the event of a conflict between the Ordinance or any
mitigation measures imposed pursuant thereto and any other ordinance, or regulation of the City,
the provisions of this Ordinance shall control, EXCEPT that provision of any Uniform Code
shall supersede.
SECTION VI. Severability. Should any section, subsection, paragraph, sentence,
clause or phrase of this Ordinance or its application be declared unconstitutional or invalid for
any reason, such decision shall not affect the validity of the remaining portions of this Ordinance
or its application to any other person or situation.
SECTION VII. This ordinance shall be effective upon its passage, approval, and
five days after publication.
PASSED BY THE CITY COUNCIL this day of June, 2006.
Is/ BONNIE I. WALTON
Bonnie I. Walton, City Clerk
((33003-0366.00(3000J10969322_2.DOC] 5
M
ORDINANCE NO.
APPROVED BY THE MAYOR this day of , 2006-
/s/ KATHY KEOLKER-WHEELER
Kathy Keolker-Wheeler, Mayor
Approved as to form:
(03003-0166-000000/10869322_2.DOC] 6
,NOW
Laura N. Whitaker
PHoNe: 206.359.8584
PAx: 206.359.9584
mMAM:
lhitaker@perkinscoie.com
September 30, 2005
Mr. Neil Watts
Development Services Department
City of Renton
200 Mill Avenue South
Renton, WA 98055
Pzce1 VZD
Oct Q'
Rove
Perkins
Cole
12oi Third Avenue, Suite 4800
Seattle, WA 9810l-3099
PHONE: 206.359.8000
FAx: 2o6.359.9000
www.perkinscoie.com
Re: Boeing Renton Plant Redevelop ment/Application for Conceptual Plan
and Planned Action Approvals for Subdistrict 1B
Dear Mr. Watts:
As you know, the 2003 Development Agreement between the City and Boeing
addresses the process by which land owned by Boeing and located within the UC-N
zone may be segregated. Among other things, the Development Agreement provides
that a Conceptual Plan must be developed and approved for certain "Subdistricts"
prior to their segregation, which Subdistricts include "Subdistrict 1B," an area
commonly known as the 10-80 site, Lot 10 and other Boeing -owned parcels east of
Logan Avenue and south of 8th Street.
Pursuant to the Development Agreement and guided by the development envelope
established by the Environmental Impact Statement prepared in 2003 to disclose
potential impacts of eventual Renton Plant redevelopment, Boeing has developed a
Conceptual Plan for Subdistrict 1B (the "Subdistrict 113 Conceptual Plan" or
"Conceptual Plan") and hereby submits it to the City for review and approval. As you
will see, the Conceptual Plan is consistent with the overall densities assumed by the
EIS for Subdistrict 1B. It is also consistent with the range of uses both allowed within
the UC-N zone and assumed by the alternative, "mix -and -match" development
scenarios analyzed in the EIS.
103003-0166/SBO52700.215]
ANCHORAGE • BEIJING BELLEVUE - BOISE - CHICAGO - DENVER HONG KONG - LOS ANGELES
MENLO PARK • OLYMPIA PHOENIX PORTLAND • SAN FRANCISCO SEATTLE WASHINGTON, Q.C.
Perkins Coie LLP and Affiliates
Mr. Neil Watts
September 30, 2005
Page 2
In addition to Subdistrict 113 Conceptual Plan approval pursuant to the Development
Agreement, Boeing also seeks approval of Planned Action status for the Subdistrict
I Conceptual Plan pursuant to the requirements of the State Environmental Policy
Act and the Renton Municipal Code. Boeing bases its Planned Action request on the
fact that, subject to the development thresholds established by the Development
Agreement and summarized below, environmental impacts of potential
redevelopment of Subdistrict IB have been fully disclosed for purposes of SEPA.
Subdistrict 113 Planned Action/Summary of Conceptual Plan Consistency with 2003
EIS and UC-N Development Standards
1. Building Heights — Building heights proposed within Subdistrict 113 would not
exceed maximum heights allowed in the UC-N I zone. It is anticipated that, relative
to heights reviewed in the EIS, proposed increases in height greater than 10% would
require additional SEPA review addressing aesthetics and shadows.
2. Transportation
a) Trip Ranges: The range of trips proposed in the Subdistrict 1B
Conceptual Plan was reviewed in the EIS.
b) Trip Threshold: The Subdistrict 1B Conceptual Plan proposes a level of
trip generation and distribution consistent with levels analyzed in the EIS. It is
anticipated that development which would exceed the maximum trip levels
shown in the EIS would complete additional SEPA review.
c) Road Improvements: The Planned Action would require on -site and
off -site road improvements. These road improvements have been analyzed in
the EIS. It is anticipated that significant changes to the road improvement plan
that have the potential to significantly increase impacts to air quality, water
quality, fisheries resources, or noise levels beyond the levels analyzed in the
EIS would require additional SEPA review.
3. Earth — The level of development proposed by the Subdistrict 1B Conceptual
Plan is consistent with development levels analyzed in the EIS. It is anticipated that a
significant change in amount of grading assumed in the EIS which has the potential to
adversely affect water quality or fisheries require additional SEPA review.
]03003-0166/SBOS2700.215] 09130/05
Mr. Neil Watts
September 30, 2005
Page 3
4. Air Quality — The EIS addresses air quality impacts generated by traffic levels
associated with redevelopment that are consistent with development levels proposed
by the Subdistrict 1B Conceptual Plan. It is anticipated that a significant change in
configuration, increase in building heights, or significant decrease in setbacks
between residential and manufacturing uses deemed to significantly affect localized
air quality and odor conditions could require additional SEPA review.
5. Water — The level of development proposed by Subdistrict 1B Conceptual Plan
is consistent with development levels analyzed in the EIS. It is anticipated that the
following changes by the Planned Action scenarios to the Alternatives analyzed in the
EIS could require additional SEPA review:
a) Change in peak flows to Johns Creek significantly exceeding the levels
reviewed in the EIS.
b) Increase in number of outfalls to Johns Creek or Lake Washington
relative to the number of required outfalls assumed in the EIS.
6. Public Services and Utilities — The level of development proposed by the
Subdistrict 1B Conceptual Plan is consistent with development levels analyzed in the
EIS. It is anticipated that a significant increase in the number of square feet or
dwelling units beyond the maximum number analyzed in the EIS could require
additional SEPA review to address impacts to fire, police, schools, parks, water,
wastewater or solid waste, as applicable.
7. Cumulative Impacts — When analyzed together with previously approved and
currently proposed Subdistrict lA redevelopment, Subdistrict 1B development levels
do not exceed the level of total development for District 1 analyzed in the EIS.
For the reasons set forth above and in the proposed Subdistrict 1B Conceptual Plan,
we request that the City approve the Subdistrict 1B Conceptual Plan and designate the
Conceptual Plan as a Planned Action for purposes of SEPA. Please don't hesitate to
contact me if you have any questions. Thank you for your consideration of this
request.
10300M 166/SD052700.2151 09/30/05
M
M
Mr. Neil Watts
September 30, 2005
Page 4
Very truly yours,
Laura N. Whitaker
TBH:tbh
cc: Alex Pietsch
Jeff Adelson
Shaunta Hyde
Laura Lohman
(03003-0166/SB052700.215] 0950(05
771
jk
M
EJ
THE BOEING COMPANY
CONCEPTUAL REDEVELOPMENT PLAN
SUB -DISTRICT I-B
Submitted to the City of Renton
October 3, 2005
CONCEPTUAL REDEVELOPMENT PLAN
Sub -District 1-B
Renton, Washington
Background
The Boeing Company has been working with the City of Renton since early 2003 to
-evaluate potential redevelopment strategies associated with its 737 facility in Renton,
Washington (the "Renton Plant Site'). In December 2003, The Boeing Company and
The City of Renton entered into a Development Agreement that established certain roles
and responsibilities for the potential phased redevelopment of all or a portion of the
Renton Plant Site, including:
Renton commitments to fund and construct certain public infrastructure
improvements;
■ Boeing commitments to fund certain private aspects of redevelopment; and
■ Boeing commitments to complete Conceptual Plans when it elects to subdivide,
develop, sell, or otherwise alter any property for uses not related to airplane
manufacturing.
Per the terms of the Development Agreement, Conceptual Planning was anticipated to
occur incrementally, and would be completed for three discrete areas of the Site, known
as Sub -Districts 1-A and 1-B, and District 2 (see Exhibit 1). City Council approved
Boeing's Conceptual Plan for Sub -District 1-A in December 2003 and amended it in
October 2004. Boeing subsequently sold this portion of the Site to Harvest Partners in
December 2004.
Harvest Partners is currently refining its development plan for Sub -District 1-A, which is
also sometimes referred to as both Lots 1 — 4 and Lakeshore Landing. Harvest Partners'
preliminary planning anticipates the development of an urban retail center containing
approximately 800,000 square feet of retail, with the potential for additional hotel, office
'I space and multifamily residential units. Construction of the retail project is anticipated to
begin in 2006.
Sub -District 1-B
Sub -District 1-B is located immediately to the south of Lakeshore Landing, as illustrated
on Exhibit 2, and totals approximately 50.7 acres, net of that portion which has been
reserved for the extension of a four -lane 8`h Avenue between Logan and Park Avenues.
As is outlined within the 2003 Development Agreement, the construction of two new
lanes along this segment of 8a' is necessary to support the redevelopment of Sub -District
1-B (see Exhibit 3).
Page 1 of 9
October 3, 2005
The City of Renton is currently completing its design for this seg
ment of 8`h Avenue, and
expects to begin building at least the two northern -most lanes in March, 2006,
simultaneous with the other infrastructure improvements necessary to support the
redevelopment of Sub -District 1-A. Ultimately, two additional lanes (to the south) along
this same segment of 8th will be required to support the redevelopment of District 2.
Harvest Partners has a Right of First Offer tb purchase a portion of the Sub -District
which totals approximately 21.2 acres (see Exhibit 3). Harvest Partners has indicated
--their interest in developing this portion, known as the ROFO area, with retail uses that are
complementary with the proposed development of Sub -District 1-A as an urban retail
center. The development intent of the ROFO area as depicted with this Conceptual
Redevelopment Plan is based upon feedback from Harvest Partners as to their proposed
project and from The City of Renton as to their goals for redevelopment within the Urban
Center North.
The remainder of Sub -District 1-B contains approximately 29.5 acres and is described
herein as the "Boeing Remainder", as illustrated on Exhibit 2. Portions of the Boeing
Remainder are currently improved with office buildings that Boeing owns and will
continue to utilize as part of on -going airplane manufacturing plant operations.
Interspersed between these existing office buildings are approximately 12.85 acres of the
Boeing Remainder that have been identified as potential development parcels ("DP 1"
through "DP 4") within this Conceptual Plan.
Submittal
Included within this submittal are a narrative description of Boeing's proposal for Sub -
District 1-B, a Conceptual Planning Diagram, and two economic benefit analyses
r demonstrating a range of potential one-time and recurring revenues generated by:
(1) Development illustrated within the Planning Diagram on the ROFO portion of the
Sub -District (beginning in 2007); and
(2) Development illustrated within the Planning Diagram on the Boeing Remainder
(beginning in 2007 for DP 1 and in 2016 for DP 2 — DP 4).
Boeing seeks the City's approval of this Conceptual Plan so that it can complete a
Binding Site Plan creating additional lots, and finalize negotiations with Harvest Partners
related to the acquisition of the ROFO portions of the Sub -District. The timing of a land
surplus decision by Boeing or redevelopment associated with the majority of the Boeing
Remainder (with the exception of DP 1) is not currently envisioned to occur sooner than 5
to 10 years in the future.
Page 2 of 9
October 3, 2005
IF
n
#ZZ soft 13
yam.
nz
1 r
f4 �+•i zavr14
tStr
RA
w
MIN
-01"Aw" St.
z..sE'u 'i F r r � , R7 ♦ �' .' � � ;�'
OEM IrAW,
S: ,1� t'+ ,£ +.x* ..� '" t; SFr S�' i
�y '� -a'j z' k'"" y
a
k,26,2M tk.Wo Iwo
FUUIR-SEARS CDNCEPTUALPLAN "ffZ ZA, r"
ARCHITECTS SUB -DISTRICT 1-B
Not
A
: T_ t!
NOT
A PA 'T".-
-IWO
!SF), PAR
a�?AHi4E
AP9
1-STORY
ae is
aka
'fly
a yl-
NEW
J
U PORTED 13Y.
LAC WR -JARW 0 K, 0
RRETAIL
GARAGE
NOM
MW TM
L
"TORYM_DGS.
LAB
IF OFFICE
(W0.6COBF)
WITH NEW 2.3 STORY
0 OFFICE
PARKING GARAGE
P PARKING GARAGE
M F MULTI -FAMILY
PEDESTRIAN
CONNECTIONS
Conceptual Development Plan
The Conceptual Plan for Sub -District 1-B is comprised of two somewhat distinct parts.
The ROFO area makes up the northern portion of the property along 8thAvenue, has been
identified as surplus by Boeing operations, and is available for near -term redevelopment.
The Boeing Remainder makes up the southern portion of the Sub -District, and contains
660,000 square feet of existing office space with re -use potential and approximately
12.85 acres of land with future redevelopment potential.
ROFO Area
Boeing recognizes that high -quality retail development is essential to the successful
transition of the area from its industrial roots to the City's vision for the Urban Center -
North. Harvest Partners and the City are both committed to ensuring that the
development at Lakeshore Landing is well -designed and initiates redevelopment of a
is
quality and at a scale which consistent with the City's long-term vision for the area.
As planning for Lakeshore Landing has progressed, the land south of 81f' has been
identified as an important component of the overall project. The area, known as the
ROFO portion of Sub -District 1-B, has been illustrated within this Conceptual Plan as an
integral part of the retail development planned to the North.
The ROFO portion of the Sub -District is envisioned to contain a large format
"destination" retailer located along Logan Avenue, with supporting retail shops space
concentrated along both sides of Park Avenue. Generally, the large format retail
development (users with footprints of 50,000 square feet or larger, and building heights
up to 45 feet) is planned to occur along 8tb and Logan, facing eastward toward Park
Avenue. The supporting retail shops space would include a mixture of medium format
retailers (ranging between 10,000 and 50,000 square feet in area, with building heights up
to 40 feet) and some component of smaller, specialty retail shops overlooking Park
Avenue.
The Plan anticipates pedestrian connections to occur internally within the site both east
toward Park Avenue, and south toward 6ib Avenue. Vehicle access would occur off of
Park Avenue, with loading and delivery functions relying upon Garden Avenue and an
internal service road running along the southern edge of the ROFO property line.
At a maximum lot coverage ratio of 30%, the ROFO site could accommodate up to
270,000 square feet of retail space. Harvest's current planning anticipates a total of
225,000 to 230,000 square feet, comprised of a 135,000—140,000 square -foot large
format retailer located along Logan, and 85,000 to 90,000 square -feet of shops space.
Parking is located in well -organized surface parking lots, with primary pedestrian
entrances facing inward or directed toward Park Avenue.
A small portion of the site, containing a data hub for the Boeing Plant, needs to be
retained by Boeing for the foreseeable future. It can be accommodated along the
Page 5 of 9
October 3, 2005
El
9
southern portion of a mid -block parking field without having a negative impact on the
surrounding retail uses.
2 Summary
Redevelopment of the ROFO parcel as envisioned within this Conceptual Plan meets
many of the City's vision and policy statements for the Urban Center -North, which call
for "retail integrated into pedestrian -oriented shopping districts." This site is located
within District 1, where the City identifies its first objective as follows:
"Create a major commercial/retail district developed with uses that add significantly to
Renton's retail tax base, provide additional employment opportunities within the City,
attract businesses that serve a broad market area and act as a gathering place within the
community."
0 Boeing Remainder
This portion of the plan is significantly influenced by the presence of four, 1980s-vintage
office buildings that are located throughout (the 10-13, 10-16, 10-18 and 10-20
buildings). Each structure is 5 — 6 stories in height, ranging between 160,000 and
170,000 square feet. Parking is accommodated in separate, structured garages and in
surrounding surface lots, at an overall ratio of 4.5 stalls per 1,000 square feet. Boeing
currently utilizes these four buildings and anticipates no near -term changes that would
result in significant rehab or sale of the structures.
In addition to the existing office buildings, there is also a 1960s-vintage lab building,
known as the 10-71 building, located along Logan Avenue. Although the condition of
the building and the planned widening of Logan Avenue may impact its potential re -use,
Boeing and the City are interested in exploring viable adaptive re -use opportunities. To
illustrate the potential capacity for redevelopment within the Conceptual Plan, the 10-71
building has been assumed to be demolished, creating a 4.9-acre development parcel
between Logan Avenue and the 10-20 building (DP 1). However, Boeing would like to
retain the flexibility of considering either re -use of the existing structure or
redevelopment in the future.
We have assumed that the existing office buildings remain, but could be supported in the
future by parking at a market -driven ratio of 3.5 stalls per 1,000 square feet, rather than at
Boeing's more conservative rate. As a result, surplus parking stalls exist within the three
existing parking garages, and three additional development parcels are created: a 3.9-acre
site between the 10-18 and 10-20 buildings (DP2); a 1. 8-acre site on the west side of Park
Avenue north of 6th (DP3); and, a 2.2-acre site on the west side of Garden Avenue north
of 6' (DP4).
Page 6 of 9
October 3, 2005
DPI
This 4.9-acre parcel is located along Logan Avenue, immediately south of the ROFO
property. Fronting on 60' Avenue, it is also adjacent to the 10-20 office building and
associated parking structure. Given its location and near -term redevelopment potential,
the Plan envisions its redevelopment as either a mid -rise, multifamily project or,
potentially, a retail development ancillary to that anticipated on the ROFO piece. If,
instead, the existing building were re -used, it is envisioned that it would be of interest
either as a cost-effective research and development or contract manufacturing facility.
' With the demolition of the existing structure, the DP-1 site could support a significant
multi -family project, either incorporated in one or more stories above ground -floor
retailers, or developed at higher densities as a single use project. A five- to six -story
residential project, developed at densities of 110 units per acre, would be both consistent
with the residential development currently planned at Lakeshore Landing and compatible
with the surrounding uses. At this higher density, approximately 535 units could be sited
on DP 1.
Alternately, redevelopment of the DPI parcel could accommodate up to 65,000 square
feet of retail space at a 30% lot coverage ratio, taking the form of additional medium -
format and small, specialty shops space backing up against Logan. Although access
would most likely occur off of 6a'Avenue, the development of DPI could be integrated
with the larger retail development occurring on the ROFO parcel.
DP2 and DP4
These two parcels are both infill opportunities that exist when parking requirements for
the existing office buildings are reduced. Currently underutilized and serving for the
most part as overflow parking areas for Boeing employees, the Plan envisions their
redevelopment with 6-story office or lab buildings, consistent with the current
development pattern.
In some instances where new lab development is planned, surplus parking within existing
garages could fully support new development, and allow for the creation of new, private
open spaces or campus greens within the neighborhood. In order to create this surplus
parking opportunity, the Plan assumes either that the four existing Boeing office
buildings are sold to other users with market -based parking requirements or that Boeing
provides new parking areas on the Plant to accommodate its employees.
The Conceptual Plan illustrates the potential redevelopment of each of these parcels with
laboratory uses, resulting in approximately 720,000 square feet of new space in four
separate structures. Both DP2 and DP4 could accommodate two, 6-story structures
containing 180,000 square feet each. A new 2- to 3-story parking garage would be
constructed between the new buildings on DP2, and the additional parking needs would
M be provided by ear -marking a portion of the stalls within the 10-20 parking garage. On
Page 7 of 9
October 3, 2005
R
tj
M
M
d
DP4, sufficient surplus parking exists within the existing 10-18 parking garage that no
new parking would need to be constructed in this location.
Alternately, either DP2 or DP4 could also be redeveloped with new office uses. Given
the greater parking requirement for office space (3.5/1,000) when compared to lab space
(1/1,000), less development is able to be accommodated on the parcels. On DP2, a
single, 6-story structure would be developed, containing 120,000 square feet. New
structured parking would be developed behind. On DP4, approximately 300,000 square
feet could be constructed in two, 6-story buildings, with all parking still provided within
the existing 10-18 building garage.
DP3
This parcel is located just south of the 10-18 office building, at the corner of 6`h and Park
Avenues. The Plan envisions the development of this parcel with new lab or office uses,
in both cases housed within a single 6-story structure. If developed as lab space, the
building could contain approximately 180,000 square feet, supported by dedicated
parking stalls within a new, multi-user garage constructed on DP2. If developed as office
space, a building of approximately 120,000 square feet could be constructed on site, with
parking either provided in a new garage on DP3 or accommodated by providing
additional parking levels within a DP2 garage.
Alternately, the DP3 parcel could accommodate up to 24,000 square feet of neighborhood
retail space, fronting on Park Avenue and offering amenities to the surrounding workers
and residents. Although no redevelopment of the land on the other side of Park Avenue
is envisioned as part of this Conceptual Plan, redevelopment of DP3 could also lead to
other improvements along Park Avenue at key intersections. It is envisioned that, if
developed with retail uses, DP3 would begin to meet the increased demands for amenities
and services that redevelopment along the 6`h Avenue corridor would require.
Summary
Redevelopment as illustrated within this Conceptual Plan would be consistent with the
City's Urban Center -North vision and long-range planning policies, creating a vibrant,
mixed -use corridor on the north side of 6`h Avenue and along Park, with mid -rise
buildings fronting the streets and structured parking behind. If new development took the
form of multi -family and laboratory space, the corridor would contain a total 535 new
multi -family units and 900,000 square feet of new lab space at full build -out. This new
mix of uses would be at a scale consistent with the 660,000 square feet of existing office
space already located in the corridor.
Page 8 of 9
October 3, 2005
2
I'
34
t
3:
z
�a
F�
t,
4
i
S ..
f _
tt
t •
'j
�i
L
i,
-
m
Ah
0
Economic Benefit Analysis Summary
Boeing's Conceptual Redevelopment Plan for Sub -District 1-B seeks to both allow for
the near -term redevelopment of Boeing's underutilized assets while advocating for a mix
of uses that significantly improves the City's tax and employment base. Two economic
benefit analyses (Exhibit 4) have been completed to support this submittal, demonstrating
the potential one-time and recurring revenues generated by:
(1) Development illustrated within the Planning Diagram on the ROFO portion of the
Sub -District (beginning in 2007); and
(2) Development illustrated within the Planning Diagram on the Boeing Remainder
(beginning in 2007 for DP 1 and in 2016 for DP 2 — DP 4).
The economic benefits to the City of Renton associated with the redevelopment of the
ROFO portion of the site can be summarized as follows:
■ By 2008 (project stabilization), it is estimated that over 1,061 jobs would be
created in the City of Renton alone; of this job total, 859 direct jobs would be
located within the development and 202 would be indirect City jobs;
■ The City is estimated to gain one-time revenues of nearly $667,000 during
redevelopment of the parcels;
■ The City is also forecast to. receive an increase in recurring annual tax revenues of
nearly $856,000, beginning in 2008.
r�
The economic benefits to the City of Renton associated with the redevelopment of the
Boeing Remainder portion of the site (DP 1 — 4) can be summarized as follows:
By 2013 (project stabilization), it is estimated that over 2,100 jobs would be
created in the City of Renton alone if this portion were developed with
multifamily and lab uses as illustrated on the Conceptual Plan; of this job total,
1,700 direct jobs would be located within new buildings and 400 would be
indirect City jobs;
■ Under this same set of land use assumptions, the City is estimated to gain one-
time revenues of more than $6.2 million during redevelopment of the parcels;
■ The City is also forecast to receive an increase in recurring annual tax revenues of
nearly $2.3 million, beginning in 2013.
Page 9 of 9
October 3, 2005
2
Renton — Sub District 1 B
0
ECONOMIC BENEFIT STUDY
BOEING SUB DISTRICT 1-B PROPERTY
RENTON, WASHINGTON
I. PURPOSE
Boeing Realty Corporation (BRC) is seeking to estimate the community economic
benefits of redeveloping certain Sub District 1-B property under option by Harvest
Partners at its Renton, Washington facility into additional retail land uses. This
"right of first option" (ROFO) property is the Phase II expansion of Harvest
Partners' development underway on Boeing's Renton Sub District 113 property
The ROFO Phase II land area being considered for redevelopment as retail space
by Harvest Partners is comprised of 21.20 net acres. It is only a portion of the
50.70 gross acres that comprises Boeing's entire Sub District 1-B Renton property.
The specific purpose of this document is to show City of Renton the economic
benefits derived from Harvest Partners redeveloping this target ROFO property if
fully developed as follows:
Retail —Shop Space 91,000
Retail —Big Box 135,000
Total 226,000 Sq. Ft.
The analysis presents an estimate of economic benefits if Harvest Partners excises
their option to purchase the targeted Renton Boeing parcels. The benefits are
measured by comparing the full redevelopment of this property as retail uses
between 2006 and 2008 versus no action. Economic impacts have been measured
(one-time and recurring) in terms of :
➢ Jobs
➢ Income
➢ Property values
➢ Public revenues
State of Washington
King County
City of Renton
� y�26;zuo�
i
Page I
Deleted: 9/23/7005
•
The economic benefit findings of redeveloping Harvest Partners ROFO parcels
into retail space are only as valid as the underlying assumptions.' These
assumptions reflect reasonable approximations of actual economic experience in
j the marketplace. The economic benefit model developed for this assignment
reflects these assumptions. It is the culmination of a series of computer -based
sensitivity analyses.
1 III. OVERALL ECONOMIC BENEFIT FINDINGS
E Redevelopment of the Harvest Partners ROFO portion of the Boeing Renton Sub
' District 113 property into retail uses will result in positive economic impacts for
the City of Renton, King County and the State of Washington. The text, charts
and tables that follow summarize economic findings by comparing job, income
and property value differences by year 2008 between "redevelopment" of the
Harvest Partners ROFO parcels versus "no use" scenarios. A summary of key
findings follow:
➢ By 2008 (project stabilization), an estimated 1,667 jobs would be created if
the target 21.20 acres comprising Harvests Partners ROFO parcels in Sub
District 1-B are fully redeveloped and absorbed into shop space and big box
i retail uses?
➢ Of this job total, an estimated 859 direct jobs would be created in the
redeveloped buildings and 808 indirect jobs would be created by 2008.
➢ These jobs would generate an additional $ 80 million in recurring annual
income at full occupancy in 2008.
➢ Of this income total, nearly $45 million in direct income would be created
on the redeveloped Sub District 1-B ROFO parcels and over $35 million in
indirect income would be created in 2008 and thereafter.
➢ The corresponding increase in property values for the Harvest Partners
ROFO parcels is forecast at nearly $53 million by 2008.
I Although not guaranteed, the economic benefit estimates expressed in this document are intended to
1 reflect information from sources deemed to be authoritative and reliable. AU monetaryfigures are
expressed in 2005 dollars.
2 This job total includes both direct and indirect jobs. Indirect jobs is the measure of secondaryjob creation
resulting (induced) from expenditures associated with direct job creation.
. 9n3noos 1
9;261200 Page 2
➢ The increase in recurring annual tax revenues by 2008 to the State of
Washington is estimated at nearly $5.1 million. This is in addition to
nearly $3.8 million in one-time state revenues collected during
redevelopment and absorption of the additional retail space on the Harvest
Partners ROFO parcels.
IV. RENTON ECONOMIC BENEFIT FINDINGS
The economic benefits to the City of Renton of Harvest Partners redeveloping this
excess Boeing property in Sub District 1-B are now summarized:
➢ By 2008, it is estimated that over 1,061 jobs would be created in the City of
Renton alone from redeveloping these Harvest Partners ROFO parcels in
Sub District 1-B. Of this job total, an estimated 859 direct jobs would be
created in the redeveloped buildings and 202 indirect City jobs would be
created by 2008.
➢ The City of Renton is estimated to gain one-time revenues of nearly
$667,000 during redevelopment of the Harvest Partners ROFO Sub District
1-B parcels.
➢ The City is also forecast to receive an increase in recurring annual tax
revenues of nearly $856,000 in 2008 and thereafter upon full build -out and
absorption of the new retail space.
Table l summarizes these estimated benefits to the City in terms of new jobs,
income and municipal revenues. These data reflect one-time benefits during
development as well as estimates of annually recurring economic benefits. For
example, during the assumed 2006 through 2008 development period, accrued
City tax revenues are estimated to generate over $66,000 during land development
and over $601,000 during construction of the retail shop and big box space.
Sources for these municipal revenues are sales tax and real estate transfer taxes.
Once the retail space is completed and absorbed (2008 estimate), annually
recurring tax revenues are projected at nearly $856,000. Nearly $187,000 of this
total will result from the City of Renton's share of property taxes. Annual sales
taxes generated from the retail space is estimated to exceed $584,000. The City's
employee head tax is forecast to generate over $58,000 each year and real estate
transfer taxes are estimated at over $26,000 annually.
{ Deleted: 9/23/2005
Page 3
*4W *0
Table 1
CITY OF RENTON ECONOMIC BENEFITS
HARVEST PARTNERS ROFO PARCELS
HARVEST PARTNERS SUB DISTRICT 1-B
I
One-time Land
One-time Building
Recurring
Redevelopment Scenario
Development
Development 2006r2007
in 2008
CITY JOBS
Direct Jobs
42
92
859
Indirect Jobs
16
39
202
Total Jobs
58
131
1,061
ANNUAL INCOME
Direct Income
$
2,121,030
$ 9,432,720
$ 44,657,600
Indirect Income
$
678,445
$ 3,384,707
$ 8,889,439
Total Income
$
2,799,475
$ 12,817,427
$ 53,547,039
CITY TAX REVENUES
Property Tax
$ 186,873
Sales Tax
$
66,379
$ 295,201
$ 584,225
Employee Head Tax
$ 58,346
Real Estate Transfer Tax
$ 306,257
$ 26,325
Total Tax Revenues
$ 601,458
$ 855,769
Chart 1 shows that 1,061 permanent jobs are estimated to be created within the
City of Renton. Of these, 859 would be direct on -site jobs in the City of Renton,
resulting in an estimated 202 additional indirect off -site jobs in the City. This
assumes that one quarter of the indirect jobs created occur within the City of
Renton. This compares to no such jobs without the redevelopment of the Harvest
Partners ROFO property in Boeing's Renton Sub District 1-B area.
Chart 1
City of Renton Permanent Jobs Created In 2008
1,200 1,061
800
400
With Project Without Project
912612004
Page 4
�Deleted; %23/20o5
t
a
a
11
Chart 2 illustrates that these jobs will generate new annual income within the City
of Renton estimated at nearly $54 million. This corresponding income reflects
both indirect off -site as well as direct on -site income creation in 2008 and
thereafter.
rh__# 11
Chart 3 shows the increases in City of Renton property values of redeveloping the
Harvest Partners ROFO parcels in Sub -District 1-B. After redevelopment
completion in 2008, the assessed value of these parcels is estimated to increase
from $8.6 million to nearly $61.3 million —an increase of $52.7 million.
Chart 3
PROPERTY VALUE INCREASES BY 2008
REDEVELOPMENT OF HARVEST PARTNERS ROFO
PROPERTY
Without Project $8.6
With Project $61.3
SO $25 $50 $75
Dollars in millions
W2EN2005
Page 5
Deleted: 91'23120111 ----- - ---
I
Chart 4 shows that the City of Renton will accrue one-time tax revenues from
sales and real estate transfer taxes of nearly $668,000 during the estimated 2006
through 2007 development period. In addition, the City is forecast to increasingly
receive annually recurring tax revenues from redevelopment of the Harvest
Partners ROFO portion of Boeing's Renton Sub District I-B property starting in
2007. This will increase until 2008 where it peaks at nearly $856,000 as an
ongoing annual cash flow to the City.
Chart 4
New City Of Renton Tax Revenues
S1,000,000
S800,000
$600,000 ® Recurring
F S400,000
■ Onetime
U
5200,000
S-
2008 2009 2010 2011 2012 2013
yiZ6 29gS
Pa8e 6
Deleted• 9/23/ZOOs
w
'rrr+ vr'
!
ECONOMIC BENEFIT STUDY
WASHINGTON
I. PURPOSE
Boeing Realty Corporation (BRC) is seeking to estimate the community economic
benefits of redeveloping four parcels in Boeing Sub District 1-B at its Renton,
Washington facility into a new mix of lab and multi -family land uses. The land
area of these redevelopment parcels comprises 12.85 net acres. It is only a portion
of the 50.70 gross acres comprising Boeing's Sub District 1-B Renton property.
The proposed new land use mix for these four Boeing redevelopment parcels
resulted from an evaluation of the holding capacity of these excess properties and
from market potential considerations.
The specific purpose of this document is to show City of Renton economic
benefits derived from redeveloping these four targeted Boeing Renton parcels if
fully developed as follows:
Lab 900,000
Multi -Family 535,500
Total 1, 435,500 Sq. Ft.
The analysis presents an estimate of economic benefits if the targeted Renton
Boeing parcels are entirely redeveloped and absorbed between 2008 and 2013
versus no action. Economic impacts have been measured (one-time and recurring)
in terms of :
➢ Jobs
➢ Income
➢ Property values
➢ Public revenues
State of Washington
King County
City of Renton
II. LIMITATIONS
The economic benefit findings of redeveloping the four Boeing Renton parcels
comprising 12.85 net acres into modern lab and multi -family space are only as
�1-26/2(3Et5� Page 1
fir►`
# valid as underlying assumptions.' These assumptions reflect reasonable
approximations of actual economic experience in the marketplace. The economic
benefit model developed for this assignment reflects these assumptions and is the
culmination of a series of computer -based sensitivity analyses.
III. OVERALL ECONOMIC BENEFIT FINDINGS
Redevelopment of the four Boeing Renton parcels into the proposed uses will
result in positive economic impacts for the City of Renton, King County and the
State of Washington. The text, charts and tables that follow summarize economic
findings by comparing job, income and property value differences by year 2013
between "redevelopment" of the four Boeing parcels versus "no use" scenarios.
A summary of key findings follow:
➢ By 2013 (project stabilization), an estimated 3,300 jobs would be created if
the target 12.85 acres comprising four Boeing parcels in Sub District 1-B
are fully redeveloped and absorbed into lab and multi -family uses.2
➢ Of this job total, an estimated 1,700 direct jobs would be created in the
redeveloped lab buildings and 1,600 indirect jobs would be created by
2013.
➢ These lab jobs would generate an additional $ 158 million in recurring
annual income at full occupancy in 2013.
"- ➢ Of this income total, over $88 million in direct income would be created on
the redeveloped Sub District 1-B parcels and over $70 million in indirect
income would be created in 2013 and thereafter.
➢ The corresponding increase in property values for the four target Renton
redevelopment parcels is forecast at over $550 million by 2013.
➢ The increase in recurring annual tax revenues by 2013 to the State of
Washington is estimated at over $3.6 million. This is in addition to over
$33.5 million in one-time state revenues collected during redevelopment
and absorption of new lab and multi -family space on the four Boeing
i parcels at the Renton Sub District 1-B site.
Although not guaranteed, the economic benefit estimates expressed in this document are intended to
reflect information from sources deemed to be authoritative and reliable. All monetary figures are
expressed in 2005 doUars.
2 This job total includes both direct and indirect jobs. Indirect jobs is the measure of secondaryjob creation
resulting (induced) from expenditures associated with direct job creation.
Deleted: 9/23/2005
9/26ZOf)- Page 2
i
IV. RENTON ECONOMIC BENEFIT FINDINGS
The economic benefits to the City of Renton of redeveloping Boeing's four parcels
of excess property in Sub District 1-B are now summarized.
➢ By 2013, it is estimated that over 2,100 jobs would be created in the City of
Renton alone from redeveloping these four Boeing parcels in Sub District
1-B. Of this job total, an estimated 1,700 direct jobs would be created in
the new lab buildings and 400 indirect jobs in the City would be created by
2013.
➢ The City of Renton is estimated to gain one-time tax revenues of over $6.2
million during redevelopment ofthe four Boeing Sub District 1-B parcels.
➢ The City is also forecast to receive an increase in recurring annual tax
revenues of over $2.3 million in 2013 and thereafter upon full build -out and
absorption of the new lab and multi -family space.
Table 1 summarizes these estimated benefits to the City in terms of new jobs,
income and municipal revenues. These data reflect one-time benefits during
development as well as estimates of annually recurring economic benefits. For
example, during the assumed 2008 through 2012 development period, accrued
City tax revenues are estimated to generate over $40,000 during land development
and over $6,168,000 during construction of lab buildings and multi -family
structures. Sources for these one-time municipal revenues are sales tax and real
estate transfer taxes.
Once the lab and multi -family buildings are completed and absorbed (2013
estimate), annually recurring tax revenues are projected at over $2,343,000.
Nearly $1,953,000 of this total will result from the City of Renton's share of
property taxes. The City's employee head tax is forecast to generate over
$115,000 each year and real estate transfer taxes are estimated at over $275,000
R annually.
De10Eed: 923/2005
__.- __..I
9126/20Q Page 3
A
Table 1
CITY OF RENTON ECONOARC BENEFITS
BOEING SUB DISTRICT 1-B DEVELOPMENT PARCELS
One-time Land
One-time Building
Recurring
Redevelopment Scenario
I Development
Development Z008-2012
in 2013
CITY JOBS
Direct Jobs
25 381
1,700
Indirect Jobs
9 159
400
Total Jobs
34 540
2,100
ANNUAL INCOME
Direct Income
$ 1,285,625 $ 49,960,680
$ 123,146,400
Indirect Income
$ 411,248 $ 34,962,754
$ 17,596,700
Total Income
$ 1,696,873 $ 94,923,434
$ 140,743,100
CITY TAX REVENUES
Property Tax
$ 1,952,593
Sales Tax
$ 40,234 $ 3,049,318
$ -
Employee Head Tax
$ 115,496
Real Estate Transfer Tax
$ 3,118,965
$ 275,071
Total Tax Revenues
$ 40,234 $ 6,168,283
$ 2,343,160
t]
Chart 1 shows that 2,100 permanent jobs are estimated to be created within the
City of Renton. Of these,0 would be direct on -site lab jobs in the City of
Renton, resulting in an esti ted 400 additional indirect off -site jobs in the City.
This assumes that one quarter of the indirect jobs created occur within the City of
Renton. This compares to no such jobs without the redevelopment of the four
Boeing Sub District 1-B parcels.
Chart 1
City of Renton Permanent Jobs Created In 2013
3,000
2,100
2,000
1,000
With Project Without Project
9 26!20U Page 4
j DCleted: 9l23/2005
Chart 2 illustrates that these jobs will generate new annual income within the City
of Renton estimated at nearly $141 million. This corresponding income reflects
both indirect off -site as well as direct on -site income creation in 2013 and
thereafter.
Chart 2
Chart 3 shows the increases in City of Renton property values of redeveloping the
four Boeing parcels in Sub -District 1-B. After redevelopment completion in 2013,
the assessed value of these parcels is estimated to increase from under $74 million
to nearly $624 million —an increase of $550 million.
Chart 3
PROPERTY VALUE INCREASES BY 2013
BOEING SUBDISTRICT 1-B DEVELOPMENT PARCELS
Without Project $73.7
With Project $623.8
$0 $200 $400 $600
Dollars in millions
4/262005�
Page 5
Deleted: 9/23/2005
*%W °ter 0
•
Chart 4 shows that the City of Renton will accrue one-time tax revenues from
sales and real estate transfer taxes of over $6,208,000 during the estimated 2008
through 2012 development period. In addition, the City is forecast to increasingly
receive annually recurring tax revenues from redevelopment of the four Sub
District i-B parcels starting in 2009. This will increase each year until 2013
where it peaks at over $2,343,000 million as an annual flow into the City.
Chart 4
New City Of Renton Tax Revenues
$3,000,000
a�
v
� $2,000,000
■ Recurring
® Onetime
$1,000,000
Al
S-
2008 2009 2010 2011 2012 2013
y/a6, 2005,
Page 6
Dele6ed: 9/23/2005
4
w
Table 1
CITY OF RENTON ECONOMIC BENEFITS
FOUR BOEING DEVELOPMENT PARCELS
BOEING RENTON SUB DISTRICT 1-11 PROPERTY
ment Scenario
CITY JOBS
Direct Jobs
Indirect Jobs
Total Jobs
ANNUAL INCOME
Direct Income
Indirect Income
Total Income
CITY TAX REVENUES
Property Tax
Sales Tax
Employee Head Tax
Real Estate Transfer Tax
.,.
Total Tax Revenues
A
2008-2012 1 in 2013
25 381 1,700
9 159 400
34 540 . 2,100
$
$
1,285,625
411,248
$
$
49,960,680
34,962,754
$
$
123,146,400
17,596,700
$
1,696,873
$
84,923,434
$
140,743,100
$
1,952,593
$
40,234
$
3,049,318
$
-
$ ,
115,496
$
3,118,965
$
275,071
$
40,234
$
6,168,283
$
2,343,160
HARVEST PARTNERS ROFO PARCELS
BOEING RENTON SUB DISTRICT 1-11 PROPERTY
ment Scenario
CITY JOBS
Direct Jobs
Indirect Jobs
Total Jobs
ANNUAL INCOME
Direct Income
Indirect Income
Total Income
CITY TAX REVENUES
Property Tax
Sales Tax
Employee Head Tax
Real Estate Transfer Tax
Total Tax Revenues
Land
2006-2007 1 in 2008
42
92
859
16
39
202
58
131
1,061
$
2,121,030
$
9,432,720
$
44,657,600
$
678,445
$
3,384,707
$
8,889,439
$
2,799,475
$
12,817,427
$
53,547,039
$
186,873
$
66,379
$
295,201
$
584,225
$
58,346
$
306,257
$
26,325
$
66,379
$
601,458
$
855,769
FINAL --Combined Benefits—Rev1P 9/26/2005
The data and caicuMons presented i>wAn whila not miarantoan nova heen r"Wneet from M b ,.N.Wn REAL ESTATE ECONOMICS
M
cm
COMBINED ECONOMIC BENEFITS
HARVEST PARTNERS ROFO PARCELS & BOEING DEVELOPMENT PARCELS
BOEING RENTON SUB DISTRICT 1-B PROPERTY
One-time Land One-time Building Recurring
RaefPvs%1nnmpnt Scenario I Develooment I Development 2006-2012 1 in 2013
CITY JOBS
Direct Jobs
67
473
2,559
Indirect Jobs
25
198
602
Total Jobs
92
671
3,161
ANNUAL INCOME
Direct Income
$
3,406,655
$
59,393,400
$
167,804,000
Indirect Income
$
1,089,693
$
38,347,461
$
26,486,139
Total income
$
4,496,348
$
97,740,861
$
194,290,139
CITY TAX REVENUES
Property Tax
$
2,139,466
Sales Tax
$
106,613
$
3,344,519
$
584,225
Employee Head Tax
$
173,842
Real Estate Transfer Tax
$
3,425,222
$
301,396
Total Tax Revenues
$
106,613
$
6,769,741
$
3,198,929
FINAL —Combined Benefits—Rev1 P 9/26/2005
The data and calculations presented herein while not guaranteed, have been obtained from sources believed to be reliable. REAL ESTATE ECONOMICS
s�
TOTAL CITY OF RENTON ECONOMIC BENEFITS
BOEING & HARVEST PARTNERS PARCELS
COMBINED DEVELOPMENT IN SUB DISTRICT 1-B
City of Renton Permanent Jobs Created In 2013
4,000
3,161
3,000
2,000
1,000
With Project Without Project
New Job Annual Income in 2013
$200 $194
$150
c $100
S50
S-
With Project Without Project
New City Of Renton Tax Revenues
$4,000,000
S3,000,M
$2,000,000 ® Recurring
■ Onetime
E�
$1,000,000
$-
2006 2007 2008 2009 2010 2011 2012 2013
FINAL —Combined Benefits—Rev1 P 9/26/2005
The data and calculations presented herein while not guaranteed, have been obtained from sources believed to be reliable. REAL ESTATE ECONOMICS
TOTAL CITY OF RENTON ECONOMIC BENEFITS
BOEING & HARVEST PARTNERS PARCELS
COMBINED DEVELOPMENT IN SUB DISTRICT 1-B
City of Renton Permanent Jobs Created In 2013
4,000
3,161
3,000
2,000
1,000
With Project Without Project
New Job Annual Income in 2013
$200 $194
$150
c $100
S50
S-
With Project Without Project
New City Of Renton Tax Revenues
$4,000,000
S3,000,M
$2,000,000 ® Recurring
■ Onetime
E�
$1,000,000
$-
2006 2007 2008 2009 2010 2011 2012 2013
FINAL —Combined Benefits—Rev1 P 9/26/2005
The data and calculations presented herein while not guaranteed, have been obtained from sources believed to be reliable. REAL ESTATE ECONOMICS
COMMITTEE OF THE WHOA'`
COMMITTEE REPORT
November 14, 2005
F_
Boeing Subdistrict 1B Conceptual Plan
Referred October 17, 2005
APB-Pe.€`ED BY N
0TV COUNCIL
Date //- aDOS
The Committee of the Whole recommends concurrence with the staff recommendation to adopt the
Conceptual Plan proposed by The Boeing Company for the potential redevelopment of 50.7-acres of
Boeing property in the South Lake Washington area known as Subdistrict 113 with the conditions
outlined below. The northern 21.2 acres of the property is expected to become surplus and brought
forward for redevelopment in the immediate future. This property is under a "right of first refusal"
agreement with Harvest Partners, the owner and developer of the 46 acres of property formerly owned
by Boeing immediately adjacent to this property to the north. Boeing proposes that this intial parcel be
developed with as much as 270,000 square feet of retail. The remaining property is expected to be
retained by Boeing for five to 10 years. However, upon redevelopment, as much as 900,000 square feet
of lab and/or'office, as well as some additional `retail°and multi -family housing, could be developed in
and around the 660,000 square feet of existing office buildings, which are anticipated to be sold and re-
occupied by other companies. -
To enhance the plan and its consistency with the Vision and ;Policies for the Urban Center —North
adopted in the Comprehensive Plan, the following ettaaditions : should be imposed on the Conceptual
Plan:
1) That Park Avenue be designated a "Pedw striao-,oriented Street," to ensure an urban form of
development and provide pedestrian linkages between the subdistrict and the planned
retail/entertainment center expected to be developed to the north, and
2) That a transit facility would be allowed use in the immediately available property, if funding for
such a facility emerged and it could be developed in a way ,that was supportive of surrounding
redevelopment and supported by the property owner(s).
The envisioned retail and employment center resulting from the redevelopment proposed under the
conditioned Conceptual Plan will have positive economic and social impacts for the City as a whole.
As outlined in the 2003 Development Agreement with The Boeing Company, all subsequent land use
applications related to this property will be checked against this document for consistency prior to
approval.
i
Terri Briere, C uncil President
ec: Alex Pietsch
Gregg Zimmerman
Neil Watts
Jennifer Henning
Nency'Weil