Loading...
HomeMy WebLinkAboutMFP18007001DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP18007001 IVR Number: 18007001  Permit InformaƟon Permit Name:Puget Sound Energy - Electric Address/LocaƟon:01/01/2019Application Date:1923059104Parcel Number:735 HARDIE AVE SW Permit Type:01/09/2019Issue Date:Franchise Permit Work Class:01/09/2020Expiration Date:Minor Utility Job Number:105083038Franchise Type:Electric Description:Install 3 phase J box, transformer and permanent electric service. Restoration per City of Renton standards.  Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X  General CondiƟons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.  This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements.  Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for AN work in the Right of Way.  Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.  (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT  THE JOB SITE AT  ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105083038 Anish Kumar 253-208-2183 anish.kumar@pse.com 732 Hardie Ave SW 98057 105083038 Crew to install 3 phase J-box, transformer and permanent electric service. No pavement cuts anticipated. Restoration per City of Renton standards. Potelco Inc.253-208-2183 BL005109 Poteli*227PL 12/17/2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105083038 PSE/Potelco Inc. Devendra Kumar 425-516-5486 6905 S 228th St, Kent, WA 98032 devendra.kumar@pse.com 732 Hardie Ave SW TBD 1/15/2019 Anish Kumar 12/17/2018 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). JOB SITE "732" DUTCH BROS. COFFEE SONICHARDIE AVE SWEAR 15 MAPS & RECORDS 70' AØAFT771 BØAFT772 CØAFT773 AØAFT765 BØAFT766 CØAFT767 AØAFT774 BØAFT775 CØAFT776 RAINER AVE SCUST TO EXTEND CONDUIT 3.5' 2' PSE TO RELOCATE XFMR N Vicinity Map N/A Owner / Developer Contact Info officeATTN: DUTCH BROTHERS COFFEE 300 NORTH VALLEY DRIVE GRANTS PASS, OR 97526 BRANDON SMITH (360) 434-3148 101115493THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 506400638 101115493 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service St Lt Service Removal Temporary Job Order Distribution HP Main HP Svc/MSA POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" E-Mail: Cell Phone: Project Manager Contact Information: Manager:ANNETTE WILSON 425-766-3891 ANNETTE.WILSON@PSE.COM DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP A. WILSON 425-766-3891 11/1/18 A. WILSON 425-766-3891 11/1/18 N/A N/A N/A A. CABRERA 425-623-5379 11/1/18 REQUIRED RENTON 735 HARDIE AVE SW TRANSFORMER RELOCATION 735 HARDIE AVE SW, RENTON, WA 98057 N/A N/A N/A 101115493 AS NOTED 1 OF 2 KING N/A N/A CSPSKERE T23N, R05E, NW SEC 19 N/A N/A 2305E074 2305E076 2305E074 EAR-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A SITE PLAN OVERHEAD CIRCUIT MAP (2305E076) SCALE: 6" = 1 MILE CIRCUIT FEET ADDED: 70' SCALE: 1"=40' CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE 132.92142149 0.92-- 132142149 5/6/2016 EAR-15 DEVELOPER CIVIL CONTRACTOR NOTES : ·REQUIRED TO PROVIDE A 6' X 6' 3,7$77+(1(:‘75$16)250(59$8/7#9 CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING ,SELECT BACKFILL ,COMPACTION &RESTORATION PER PUGET SOUND ENERGY STANDARDS.6750.6500 # **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL ** DEVELOPER EXCAVATION NOTES: ·REQUIRED TO EXCAVATE &EXPOSED EXISTING PSE UG FACILITIES 48HOURS BEFORE CONSTRUCTION ·ALL EQUIPMENT MUST BE PROTECTED FROM VANDALS WITH STEEL PLATE 48HOURS BEFORE CONSTRUCTION. ·EXCAVATION MUST BE COMPLETED 48HOURS PRIOR TO CONSTRUCTION . ·REQUIRED TO HAVE EXCAVATION EQUIPMENT ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING FOR THE UG PRIMARY &INSTALLATION OF THE 1PH OR 3PH VAULT . ·BACKFILL /COVER REQUIRED ON PRIMARY . CONTRACTOR TRENCHING IN CITY OR COUNTY OR W .S .DOT RIGHT OF WAY NOTES : PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT . IF A PRE -CON IS REQUIRED BY THE CITY ,COUNTY OR W .S .DOT A PSE PROJECT MANAGER WILL SET -UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS ALL INSPECTIONS ARE REQUIRED BY POTELCO INC ·IF A SECOND INSPECTION IS REQUIRED ,ADDITIONAL FEE 'S WILL BE APPLIED. DEVELPER IS RESPONSIBLE TO PROVIDE CUSTOMER OWNED SERVICE CONNECTION ā DEVELOPER IS REQUIRED TO OBTAIN A CITY OF RENTON ELECTRICAL INSPECTION APPROVAL STICKER FOR 320A METER BASE SITE SPECIFIC NOTES: JO1 (317540-165784) TO VO1 (317557-165780) -REMOVE EXISTING 1/0 PRIMARY UG CABLE EHE441 -CUSTOMER TO PULL OUT SVC CABLE -RELOCATE EXISTING VAULT & TRANSFORMER 4' SOUTH & 2' WEST -EXTEND CONDUIT TO NEW TRANSFORMER LOCATION -CUSTOMER TO EXTEND THEIR CONDUIT TO NEW TRANSFORMER LOCATION -INSTALL 1/0 UG PRIMARY & REUSE CABLE TAG #EHE411 (+/- 90') -INSTALL (2)LOADBREAK ELBOWS -CUSTOMER TO PULL NEW SVC CABLE & GET STATE INSPECTION -POTELCO TO CONNECT CUSTOMER SVC & REENERGIZE TRANSFORMER JOB NOTES: ONSITE CONTACT: MATT UTLEY, ARM & HAMMER CONSTRUCTION PH: 425-381-9153 BRENT KNOLES, ACTIVE ENGINEERING, PH: 206-571-3525 MANDY HURST, DUTCH BROTHERS, PH: 541-218-6717. MAPS & RECORDS U-MAP SHOW J01 LOCATION 25' NORTH AND & 5' EAST OF ITS ACTUAL LOCATION % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 480SQ. 400AMPS ELEC 16KW 1.4% 1.3% New pole at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER TRANSFER Company ID#: Primary phase connected to: Tested Secondary Voltage V01 317557-165780 37.5 N/A N/A N/A EXISTING CABLE TAGS CɸEHE4416X6 WORK PIT EXISTING CABLE TAGS AɸAFT765 BɸAFT766 CɸAFT767 EXISTING CABLE TAGS AɸAFT771 BɸAFT772 CɸAFT773 EXISTING CABLE TAGS AɸAFT774 BɸAFT775 CɸAFT776 EXISTING CABLE TAGS AɸEHE442 BɸEHE443 CɸEHE444 J-BOX AND V02 INSTALLED UNDER 'SONIC DRIVE-IN' W.O.# 105083037 CABLE TAGS AɸEHE445 BɸEHE446 CɸEHE447 90°35'35'3.5' 2' SCALE: NONE CIRCUIT ONE-LINE DIAGRAM PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT PRIMARY CABLE ASBUILT INFORMATION SIZE Qty LENGTH Design (ft) BENDS PULL PULL Cable LENGTH Design (ft) Cable Numbers Please Record Foreman - Complete FROM TO (in)90°45°22°11°(lbs) Rev (lbs)Size A B C Manufacturer Compound Year Actual Amount Installed (Conduit & Cable) J02 V01 2 1 70 1 86 56 1/0 80 EHE441 Owner / Developer Contact Info officeATTN: DUTCH BROTHERS COFFEE 300 NORTH VALLEY DRIVE GRANTS PASS, OR 97526 BRANDON SMITH (360) 434-3148 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts VAULT & EXCAVATION DETAIL Not to scale 6045.1000 1950 lbs Total : 70 = 2" SCH80 Grey PVC Total : 90° Bends = 1 Total Glue = _ _ Qts Total : 80' 1/0 JKT AL INSTALLED Phone & TV Primary Power Cable Direct Buried or in PSE provided Excavated Dirt Pile Final Grade 24" Min 48" Max 18" Backfill for DB 120 Conduit/Direct Buried Cable 4" Min Separation 6" or 12" of sand, 5/8" minus 3" of sand, 5/8" minus, or clean backfill bedding JOINT TRENCH DETAIL 36" Min Cover ROADSIDE Typical To Excavated Dirt Pile (No Rocks over 10" Diameter) or clean backfill shading DB120 Grade Conduit Primary-Direct Buried or DB 120 (NTS) - A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material contains rocks up to 10" in diameter. 6"6" MIN GUARD POST INSTALLATION MIN CONCRETE 2'-6" PAINTED YELLOW 3'-6" 6'-0" The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. LENGTH GUARD POST INSTALLATION Not to scale 0700.1600-03 18" PAD & GUARD POST LOCATIONS XFMR FRONT GUARD POSTS 3' MIN MIN 5' MAX 5' MAX TYPICAL 3' MIN 5' MAX 5' MAX 5' MAX 18" MIN 5' MAX 5' MAX 5' MAX 5' MAX 5' MAX COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 18" MIN 18" MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 6775.0035 Not to scale AT V01 AT V01AT V01 101115493E-Mail: Cell Phone: Project Manager Contact Information: Manager:ANNETTE WILSON 425-766-3891 ANNETTE.WILSON@PSE.COM DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP A. WILSON 425-766-3891 11/1/18 A. WILSON 425-766-3891 11/1/18 N/A N/A N/A A. CABRERA 425-623-5379 11/1/18 REQUIRED RENTON 735 HARDIE AVE SW TRANSFORMER RELOCATION 735 HARDIE AVE SW, RENTON, WA 98057 N/A N/A N/A 101115493 AS NOTED 2 OF 2 KING N/A N/A CSPSKERE T23N, R05E, NW SEC 19 N/A N/A 2305E074 2305E076 2305E074 EAR-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A #735 2424 121224 23 13 11 13 12 10 13 RAINIER AVE SHARDIE AVE SWJ J01 V01 allow 11' minimumM6-2ROADWORKAHEADW20-1RIGHTSHOULDERCLOSEDW21-5aRW1-4LX'X'X'USE MAXIMUM AVAILABLE SPACE FOR SIGNS ROADWORKAHEADW20-1DETO U R M4-9bAHEADUSE OTHER SIDESIDEWALK CLOSEDPLACE SIGN IN SW CORNER OF SW 7TH ST SIDEWALKCLOSEDR9-9SIDEWALK CLOSEDR9-9CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 N PSE PUGET SOUND ENERGY JOB#101115493 735 Hardie Ave SW, Renton, WA December 7th, 2018 patrick.byrne@pse.com 425-424-6618 Sheet 1 of 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW UG/BOX/VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY ROW ROW