Loading...
HomeMy WebLinkAboutComplete RFQ Document �iuu�IIIIIIII���I Illllllp��, V City of Renton Request for Qualifications For the Renton Airport Private Lift Station Replacement Project Including Survey, Geotechnical, and Civil Design Submittal Deadline: 4:00 p.m., February 26, 2019 The City of Renton Wastewater Utility(city) is soliciting statement of qualifications (SOQs)from engineering consulting firms interested in providing engineering,geotechnical, and surveying services for the Renton Airport Private Lift Station Replacement Project.The work shall include an alternatives analysis for replacement of the lift station that will include potential locations for a replacement station and an evaluation to determine if gravity service is an available option for this site. Work shall also include survey,geotechnical, design, and construction services for the preferred alternative.The successful firm will have experience in providing professional engineering design services for wastewater lift stations,with specific expertise in package commercial lift station systems. The detailed RFQ, background information, consultant selection criteria, and instructions for submittal of Qualifications may be obtained at the City of Renton website, http://rentonwa.�ov/bids/in the RFQ section, or by contacting Dave Christensen, City of Renton Wastewater Utility at 425-430-7212, or by email at dchristensen@rentonwa.�ov. BACKGROUND The City of Renton owns and operates the Renton Municipal Airport located adjacent to the Boeing 737 Production Facility,the Cedar River, and Lake Washington. At the northwest portion of the airport facility is an existing private sewer lift station that is the responsibility of the Renton Airport to own, operate, and maintain.This lift station serves a number of the lease holders at this portion of the site. The lift station has reached its useful life and needs to be replaced.The Wastewater Utility is assisting Airport Staff with the replacement of the station. SCOPE OF WORK/PROPOSAL Anticipated work for this project includes an initial brief alternative analysis that evaluates whether or not a gravity alternative exists to route the sewer from these existing buildings to the north, to King County's Bryn Mawr Interceptor,which crosses the Airport property. If gravity service is not an available option,then the alternatives analysis will evaluate alternative locations for the replacement lift station. The existing station is approximately 28 feet deep and located in a difficult location for general maintenance.The city will provide all existing mapping available that shows the location of the existing sewer laterals from the lease properties into the lift station. If a gravity option is available, and is determined to be cost effective,then the design shall include plan and profile drawings and C:\Users\lili-wong\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlook\YVUUMOIE\Consultant Selection RFQ.docx Page 1 of 4 specifications for the gravity route. If replacement of the lift station is the preferred option,the design shall include sizing for flow, evaluation of package systems, level of telemetry/notification for system failure, lift station replacement plans and specifications. Under both alternatives,the consultant will assist the city with services during construction. We anticipate this work will be classified as maintenance or under 12-inch pipe sizing, and therefore exempt from SEPA. Anticipated permitting is a Public Works Construction permit and an electrical permit. All work is expected to take place on Renton Municipal Airport property. CONSULTANT SELECTION AND EVALUATION PROCESS City of Renton staff will evaluate the consultant's qualifications based on the project approach, each firm's technical skills and resources,the project team's technical skills, and history of performance. Consultants may use other firms as sub-consultants for work or tasks that they may not have sufficient staff or expertise for. All work by sub-consultants shall be identified. Qualifications and resumes for sub- consultants-shall be included in the SOQ. The city will evaluate the statement of qualifications and select the highest ranking firms for oral interviews. All firms submitting qualifications will be notified in writing as to their status in the selection process. Oral interviews will be held at Renton City Hall and will be scheduled after the short list is determined. The city may choose to forego oral interviews and base selection solely on the SOQ submitted. If oral interviews are held,final determination will be based upon the scoring for the oral interviews only. The city encourages minority-owned and women-owned businesses, socially and economically disadvantaged business enterprises, and small businesses to respond to this Proposal or participate with other firms as partners or sub-consultants in response to this Proposal. DISCLAIMERS • SOQs that do not include all of the submittal requirements outlined herein may not be considered or may be downgraded. • At the city's discretion,the city may amend the Selection Process and Schedule at any time. • The city may revise the evaluation and scoring criteria at any time without providing notice to the Consultants. • At the city's discretion,the city may choose to republish the RFQ. • The execution of the Consultant Agreement is subject to budgeted funds. • Until such time a Consultant Agreement is executed,there are no express or implied obligations or commitments on the part of either the city or the Consultant concerning either this RFQ or any Proposal associated with it. • All materials submitted for the Proposal will become property of the city and will not be returned. • By submitting materials to the city for consideration for this RFQ,the Consultant is waiving any claim of confidentiality,trade secrets,or privilege with respect to materials submitted.All submitted materials are subject to public records disclosure under the State of Washington Public Records Act. • Consultant will be notified of Addenda,however it is the Consultant's responsibility to verify whether any Addenda were issued. C:\Users\lili-wong\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlook\YVUUMOIE\Consultant Selection RFQ.docx Page 2 of 4 • Fax or e-mail submittals will not be accepted or considered. SUBMITTAL REQUIREMENTS To be considered responsive,the respondent must include the following information listed below. Proposals that do not fully comply with these instructions may not be considered.To facilitate evaluation the Statement of Qualifications must be organized in the order of the outline below. Do not exceed 20 pa�es total for sections A, B, C and D. Resumes should be limited to one to two pages for each person. A. PROJECTAPPROACH 1. Describe your proposed approach to the project and the specific tasks that would be included in a proposed Scope of Work for the project as follows: TASK No. TITLE TASK LEAD: SUBCONSULTANTS(if used): RATIONALE: ACTION OUTLINE (Approach/Actions/Results): 2. Provide a preliminary time schedule for carrying out various tasks. 3. Prepare time estimates and availability for key team members used in each of the major tasks. B. PROJECT MANAGEMENT 1. Provide a description of your approach to organize and carry out the work. 2. Provide an organizational chart indicating how the firm's management will interface with this project. Identify the overall Project Manager and task leaders/key team members. C. PROJECTTEAM MEMBERS 1. Identify the Project Manager, each task leader, and key team members. Describe their expertise and their role in this project. Provide their office location,technical expertise, and other pertinent information. Provide a professional resume for each member of the proposed team. 2. Identify sub consultants that you will use on this project, indicate their specific roles, and provide their experience on similar related projects. 3. Describe two to three projects that your firm has completed that are similar to the proposed project. Describe how the projects performed in terms of desired outcome, budget, and schedule. Describe the work that your firm's project team members performed for those projects. D. REFERENCES 1. Provide three recent references (within last ten years)that may be contacted concerning your firm's performance on a project of this type. 2. Provide three recent references (within last ten years)that may be contacted concerning the performance of your firm's proposed Project Manager on projects of this type. E. INSURANCE, RECORDKEEPING,AGREEMENT, AND OTHER REQUIREMENTS C:\Users\lili-wong\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlook\YVUUMOIE\Consultant Selection RFQ.docx Page 3 of 4 The firm that is selected for this project will be required to obtain, at its own expense, professional liability insurance of$1,000,000 per occurrence and $2,000,000 aggregate for Commercial General Liability(CGL)for the term of the contract and other insurance as required by the city(see informational documents).The firm selected will be required to sign the City of Renton Consultant Agreement. All firms working on the project will be required to obtain a city Business License. Indicate if you can meet these requirements. F. SUBMITTAL DEADLINE The deadline for submittals is 4:00 p.m., February 26, 2019. If mailed,the submittal must be postmarked no later than February 26, 2019. Five (5) paper copies and one (1) electronic copy of the Proposal in PDF format on a CD, DVD, or jump drive, shall be mailed or delivered to the following address: City of Renton City Clerk's Office—7t" Floor Attn: RFQ Renton Airport Private Lift Station Replacement Project/Dave Christensen 1055 South Grady Way Renton,WA 98057 G. CITY CONTACT PERSON All questions regarding this request for RFQ should be directed to: City of Renton Attn: Dave Christensen,Wastewater Utility 1055 South Grady Way, 5t" Floor Renton,WA 98057 Phone:425-430-7212, Email: dchristensen@rentonwa.�ov INFORMATIONAL DOCUMENTS • Figure 1—Renton Airport private Lift Station Project Area • Insurance Guidelines for the City of Renton • RFQ Consultant Evaluation Criteria C:\Users\lili-wong\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlook\YVUUMOIE\Consultant Selection RFQ.docx Page 4 of 4