HomeMy WebLinkAboutCO 6 CAG-18-068, CO #6-19 Ltd Y 0,t,. kk + + N ° Change Order No. 6 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contractor: Gary Merlino Construction Co., Inc. Contract No. : CAG-18-068 Federal Aid No. : N/A ❑ Ordered by Engineer ►i1 Proposed by the Contractor(VECP) ❑ Unilateral Original Contract Amount: $1,394,565.00 Current Contract Amount: $1,075,044.69 Estimated Net Change This Order: $2,700.00 New Contract Amount: $1,077,744.69 Prepared By: Iss y: Mktr,It I Resi e t Engine•r Date itEngineer(City of Renton Transportation to Design Manager) Reviewed By: Consent By: Engineer of Record Date Surety(Greater than 25%cost and/or 20% Date time increase) Reviewed By: Endorsed By: ay — --�� /-'1-44 ,' o Ci of Kenton Project Manager Date Contractor bite Reviewed By: ( Executed By: City Attorney(Great an$35,000 Date Cit R ton P Works toAi e and/or change in scope) A ministrator/Mayor Change Order No.6 Contract Title:2018 Street Patch and Overlay with Curb Ramps Contract No.CAG-18-068 Page 1 of 4 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The paving and associated work for the roadways shown on Map Number 4, S 26th St and S 27th St, will be suspended until Spring 2019. Reason for Change: The overall condition of the roads in this area warrant dry weather in order to reduce the cost of subgrade repair.A long period of dry weather is needed. Materials: None. Plans: Map Number 4. Extension of Time: The Time for Completion is extended 0 Working Days. Equitable Adjustment: This Change Order includes a significant change: None. Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shall constitute the complete and final settlement for all costs of labor,equipment, materials, overhead, profit, permit fees,and all other claims that may be made by the Contractor as a result of this change. Change Order No.6 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contract No.CAG-18-068 Page 2 of 4 Estimate of Change Order Cost: Bid Item No. Description Quantity Unit Unit Price Estimated Cost Force Account Item description Labor Estimate - Labor Markup 29% - Equipment Estimate _ Equipment Markup 21% Materials Estimate - Materials Markup 21% _ Services Estimate - Services Markup 21% Mobilization Estimate Subcontractor Work Estimate Subcontractor Markup 12%, 10%,7% _ Bid Item Change Equitable Adjustment Per attached determination Estimate $ 2,641.76 Calculated Cost $2,641.76 Estimated Change Order Cost $2,700.00 Change Order No.6 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contract No.CAG-18-068 Page 3 of 4 Attachments: 0 Plans © Construction Change Directive (DOT Form 570-110 EF) 11 Change Order Quotation (DOT Form 570-002) 111 Materials—Project Documentation (DOT Form 550-004 EF) 0 Project Labor List ▪ Applicant-Owned Equipment and Labor Project Documentation (DOT Form 550-003 EF) El Force Account Equipment Rate Request (DOT Form 422-010 EF) • Force Account Summary © Equitable Adjustment Determination Change Order No.6 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contract No.CAG-18-068 Page 4 of 4 r liston Slats VW' Doparturbent of portatiattl Construction Change Directive PROJECT: (Name and Address) 2018 Street Patch and Overlay with Curb Change Directive No.:06 Ramps Change Directive Date: 10/03/2018 TO: (Contractor Name and Address) Contract No.:CAG-18-06$ Gary Merlino Construction Co. Inc. 9125 10th Ave S Contract Date:07/02/2018 Seattle, WA 98108 J You are hereby directed to make the following change(s)in this Contract: Due to the weather, the paving and associated work on the roads shown on Map Number 4 will be suspended until the Spring 2019. Applicable escalation and delay costs will be addressed in Change Order No. 6 that will follow. Proposed Adjustments 1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is: ❑ Lump Sum 0 increase ❑decrease of $ ❑ Unit Price of $ per ❑ As Follows: 2, The Contract Time is proposed to be ❑adjusted ®remain unchanged The proposed adjustment, if any, is an ❑increase ❑decrease of working days. When signed by the State and received by the Contractor,this document becomes effective immediately as a Construction Change Directive(CCD),and the Contractor shall proceed with the change(s)described above. Signature by the Contractor indicates the Contractor's agreement with the proposed adjustments in Contract Sum and Contract Time set forth in this Construction Change Directive. 3. Preparation and execution of an appropriate Change Order will follow. State U+` Contractor By: t/Nik""' An111, Title: Pr^ou�- — Q t j ----------------_-_ Title: pv-qer- sva ft f 0 Q Date: 3/lel Date: /0AA t B - DOT Form 570-110 EF Distribution: Original-Contractor; Copy to Facilities Office Revised 1/99 Cmob A4-4 Contract Title: 2018 Street Patch and Overlay with Curb Ramps Contractor: Gary Merlino Construction Co., Inc. Contract No. : CAG-18-068 Federal Aid No. : N/A Change Order No. : 6 Equitable Adjustment Determination: The overall condition of the roadways in this area warrant dry weather in order to reduce the cost of subgrqade repair. The increase in cost is for the additional surpervision required fo site work that otherwise would have occrred concurrently with other site work. Employee/Equipment Class/Equipment No. Hours Rate Estimated Cost Lyle Bartley Onsite Supervision 24 $69.55 $1,669.20 Kyle West Project Engineer 8 $81.61 $652.88 Truck 22-063 24 $13.32 $319.68 Calculated Cost $ 2,641.76