HomeMy WebLinkAboutCO 1 CAG-1 8-002 , CO #1-1 9 0 1 o o A, % ,...),. 4 ' 4 .." Change Order No. 1 Contract Title: N 27th Place Bridge Scour Repair Project Contractor: SB Structures, !LC Contract No. : CAG 18-002 Federal Aid No. : BHOS-1070(010) 0 Ordered by Engineer El Proposed by the Contractor(VECII) 0 Unilateral Original Contract Amount: $444,783.22 i ..._ Current Contract Amount: $444,783.22 ..._ Estimated Net Change This Order: $23,600.00 New Contract Amount: $468,383.22 Prepared By: Issued 8y): C;5 , fleiclyn't Engineer Date Engineer I I y of Renton Transportation ate ,i- A e All,», f r o; k) AA A."4je., Design Manager) Reviewed By: Consent By: Engineer of Record Date Surety(Greater than 25%cost and/or 20% Date time increase) Reviewed By. _ Endorsed B • /' , x / '44V11$ 104/, *I•City of Renton t Manager f Date Contractor ,te 7.tc.,t 0e,1,14,1 Executed By: Reviewed By: .,), I .1(',1'/ICI I i eV*110\ /pollei City Attorney(Greater an$35,000 Date City ofIlonublic Works ate and/or change in scope) Administrator/Mayor Change Order No. 1 Contract Title: _N 2 7,.Pla.c.e.Bridge Sou r Repair.Prpiest...... ___.. Contract No. _CAG-1 8-OR Page 1 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Remove roots and other obstructions to sheet pile driving at Wall 1. Exploration of soil conditions at Wall 2 to determine alternative to the sheet pile wall that couldn't be driven. Reason for Change: While driving sheet piles in the alignment of Wall 1,the contractor encountered roots that prevented driving. The roots needed to be removed in order to drive the sheet piles at Wall 1. Additionally the contractor attempted to drive sheet piles in the alignment of Wall 2, but could not due to a dense clay layer. The contract did not include provisions for dealing with obstructions encountered during sheet pile driving. The roots and hard soils constitute differing site conditions as defined in Section 1-04.7. This change is written to compensate the contractor for the time and effort to remove the obstructions at Wall 1 and for the time spent attempting to drive piles and determine a viable alternative for Wall 2. The deletion of Sheet Pile Wail 2 and addition of a concrete cutoff wall will be covered under Change Order No. 3. The work to remove obstructions and explore soils occurred over several days with a cumulative impact to the critical path of 5 working days. Materials: N/A Plans: No changes were made to the drawings. Adjustment: This Change Order includes significant changes,Type A,as defined in Section 1-04.4.The adjustment shall be made by force account, the estimate is attached. Extension of Time: The Time for Completion is extended 5 non-compensable Working Days in accordance with Section 1-08.8. Equitable Adjustment: This Change Order does not include an equitable adjustment since overhead and profit are contained in the Force Account markup. Change Order No. __ 1_ Contract Title:..__N 2711 Place Bridge S .ur . t L'anect Contract No._ ._m CAC-j -002 ___A ._____ Page 2 of 3 Sections 1.04.4 and 1-04.5 of the 2016 WSDOTJAPWA Standard Specifications shall govern this Change Order.The Work of the referenced Contract is modified to include the changes detailed herein.The payment provided for herein shalt constitute the complete and final settlement for all costs of labor,equipment,materials,overhead,profit,permit fees,and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order • Plans D Field Directive • Change Order quotation ® Estimated Change Order Cost • Project Labor List ▪ Force Account Equipment Rate Request(DOT Form 422-010 EF) ❑ Equitable Adjustment Determination Forms to be used during Force Account Work • Daily Report of Force Account Labor Daily Report of Force Account Equipment El Daily Report of Force Account Materials Force Account Summary Change Order No. Contract Title: i rxF b Such Repast Project Contract No. w__.e� �: : fl .._ Page 3 of 3 Estimated Change Order Cost Change Order No. 1 Bid Item No. I Description Quantity Unit Unit Price Estimated Cost Force Account Item description ... , Labor 150 Hours $ 73.00 5 10,950.00 Labor Markup 29% $ 3,175.50 Equipment-50 Ton Crane 34 Hours 5 165.10 $ 5,613.40 Equipment-APE Hammer 150T 22 Hours $ 98.06 $ 2,157.32 Equipment Markup 21% 5 1,631.85 Materials Estimate $ Materials Markup 21% $ Services Estimate $ Services Markup 21% $ Mobilization Estimate $ . Subcontractor Work Estimate $ Subcontractor Markup 12%,10%,7% $ Force Account Total $ 23,528.07 Bid Item Change S $ — $ Bid Item Change Total $ Equitable Adjustment 'Per attached determination Estimate 1 $ Calculated Cost $ 23,528.07 Estimated Change Order Cost $ 23,600.00 Change Order No j Contract Title. N ilthplace tic iike Sttoyc,Pepotrytapst, Contract No CAG-18-9.02