Change Order No. 2
Contract Title: N 27th Place Bridge Scour Repair Project
Contractor: SB Structures, LLC
Contract No. : CAG 18-002
Federal Aid No. : BHOS-1070(010)
0 Ordered by Engineer
l Proposed by the Contractor(VKR)
0 Unilateral
Original Contract Amount: $444,783.22
Current Contract Amount: $468,783.22
Estimated Net Change This Order: I $0.00
New Contract Amount: j $468,383.22
Prepared By: Issu/02y:
z a 4 -IN,,
/07//h
itesicient-Efliaeet. Date Engineer (City of Renton Transportation ate
ity rr,„,0,4 Matntic r
Design Manager)
Reviewed By: Consent By:
Engineer of Record Date Surety(Greater than 25%cost and/or 20% Date
time increae)
Reviewed By: Endorse
(44,44 /4
City of Renton Project Manager ate Contractor 441/ate4;jir
/riftst g Executed By:
Reviewed By:
414 ftfity eliti
City Attorney(Greate an$35,000 Date ity of Re n P ic rks at
and/or change in scope) Administra r/Mayor
Change Order No.
Contract Title: N 21th_Place.Bridge_S aur Repaithoiect
Contract No. CA0487902 Page 1 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
Add 13 working days to the contract time.
Reason for Change:
On August 7, 2018,the International Union of Operating Engineers (WOE) Local 302 went on
strike over a labor dispute with the Associated General Contractors (AGC)of Washington.The
strike made it impossible for the work to continue on the project until the union permitted its
members to resume work on September 7, 2018. The strike delayed work on the project for a
total of 13 working days.
In accordance with 2016 WSDOT Standard Specification Section 1-08.8 Extensions of Time,the
Contractor requested to add 13 non-compensable working days to the contract as a result of
the strike and the City granted the request.
Materials:
N/A
Plans:
N/A
Adjustment:
The added working days are non-compensable.
Extension of Time:
The Time for Completion is extended 13 non-compensable Working Days in accordance with
Section 1-08.8.
Equitable Adjustment:
This Change Order does not include an equitable adjustment since it is only for additional non-
compensable Working Days.
Change Order No. _.
Contract Title: _N27tnpost 1.3 ridge So sr.K ,p irPro,it4t _..
Contract No. AA:L w LC . u._ Page 2 of 3
Sections 1-04.4 and 1-04.5 of the 2016 WSDOT/APWA Standard Specifications shall govern
this Change Order.The Work of the referenced Contract is modified to include the changes
detailed herein.The payment provided for herein shall constitute the complete and final
settlement for all costs of labor,equipment, materials,overhead,profit, permit fees,and all
other claims that may be made by the Contractor as a result of this change.
Attachments:
Forms to be attached to Change Order
0 Plans
O Field Directive
O Change Order Quotation
O Estimated Change Order Cost
0 Project Labor List
Force Account Equipment Rate Request(DOT Form 422-010 EF)
0 Equitable Adjustment Determination
✓ Contractor Time Extension Request
O City Response to Extend Contract Time
o Consent of Surety
Forms to be used during Force Account Work
O Daily Report of Force Account Labor
O Daily Report of Force Account Equipment
O Daily Report of Force Account Materials
O Force Account Summary
Change Order No 2_ _.., ,.
Contract'Title: _NI??0i lace,i3rid e_ .ur K+i?itrp,Project
Contract No. A :JW: .._.__ Page 3 of 3
B
TUR
August 22,2018
City of Renton
1055 South Grady Way
Renton,WA 98057
Attn: Derek Akesson,P.E.Project Manager
Reference: Contract No CAG-18-8002
N 27th Place Bridge Scour Repair Project
1-08.8 Extension of Time
Operating Engineer's Strike
Dear Derek:
This letter is to submit a request for a time extension to the Engineer in writing no later
than 10 working days after the delay occurs. SB Structures,LLC is a party to the
Washington Master Labor Agreement between the Associated General Contractors of
Washington and the operating engineers,and work on the N 27th Place Bridge Scour
Repair Project is performed under this agreement.
All members of the Operating Engineers working under the Washington Master Labor
Agreement between Associated General Contractors of Washington and I.U.O.E Local
302 have been directed by their union to withhold their labor and not report to work for
the duration of a strike,effective at 6:00 am on Tuesday,August 21,2018.
The contract provides the authorized time for completion will be extended for a period
equal to the time the Engineer determines the work was delayed because of strikes. SB
Structures anticipates that all critical path activities will be affected by the strike,and
requests an extension of contract time,beginning today,and continuing until the union
permits its members to resume work.
Thank you for your consideration of the foregoing.
Respectful ,1
t=
1 ifar
Joel Garcia
Project Manager
1
P.O.Box 68847• Seattle,WA 98168-0697•Tel:(253)872-6750 • Fax:(253)872-7171
WA Lic.#SBSTRSL947LW
Denis Law Mayor ,
N
August 30,2018 Public Works Department Gregg Zimmerman,P.E.,Administrator
Joel Garcia
SB Structures,LLC
P.O. Box 68847
Seattle,WA 98168
RE: SB Structures August 22, 2018 letter requesting a contract time extension for the N 27th Place
Bridge Scour Repair Project,Contract CAG-18-002,due to the strike by the IUOE Local 302
Dear Mr.Garcia,
As we discussed at the weekly meeting on Wednesday, August 29, 2018, the City will grant a time
extension for the above referenced contract.The number of additional working days will depend upon
the duration of the strike by the IUOE Local 302.Since the strike is on-going as of the date of this letter,
the total number of additional working days that are being requested remains unknown.
Please note that the 2016 WSDOT Standard Specification Section 1-08.8 requires the surety to consent to
the time extension if it equals 20 percent or more of the original contract time.The original contract called
for 35 working days.Therefore,the addition of 7 working days would reach the 20 percent threshold.The
strike started on August 21,2018.Since that time,8 working days have occurred.Of those working days,
some work was performed on Thursday,August 23,2018 and Monday,August 27,2018.
After the strike has ended,the City proposes the following steps to finalize the contract time extension:
1. SB Structures,LLC sends a letter to the City requesting a number of additional working days.The
letter shall address the requirements of Section 1-08.8,Including consent from the surety.
2. Upon receipt of the request, the City will evaluate the request and provide a written response
granting some,if not all,of the requested additional working days.
If you have any questions,comments or concerns about this letter or proposed approach,please contact
me at 425-430-7337(office)or 206-818-9966(work cell)or by e-mail at dakessonrentonwa.Rov.
Sincerely,
TRANSPORTATION SYSTEMS DIVISION
ta.4)-4.. eR
Derek R Akessson, PE
Project Manager
cc Bob Hanson,Transportation Design Manager
Mike Niehl,BergerABAM
1055 South Grady Way,Renton,WA 98057• rentonwa.gov
11
TRUCTL4.
September 10,2018
City of Renton
1055 South Grady Way
Renton,WA 98057
Attn: Derek Akesson,P.E.
Project Manager
Reference: Contract No CAG-18-8002
N 27th Place Bridge Scour Repair Project
1-08.8 Extension of Time
Operating Engineer's Strike-Surety Consent
Dear Derek:
Enclosed,please fmd the Consent of Surety that was requested by letter on August 30,
2018, from the City of Renton.
Respectfully,
ogiih Neito;en,,,
Jenifer Morrison
Executive Assistant
P.O.Box 68847•Seattle,WA 98168-0697 •Tel:(253)872-6750 • Fax:(253)872-7171
WA Lic.#SBSTRSL947LW
CONSENT OF SURETY
To: City of Renton
Project: N.27th Place Bridge Scour Repair
Contract No.: CAG-18-002
Bond: #023206865
Contract Date:
Contractor: SB Structures,LLC
Gentlemen:
Liberty Mutual Insurance Company(hereinafter"Surety"),as Surety for SB Structures,LLC,the principal on the above
referenced performance and payment bonds,hereby consents and agrees to:
The time extension agreed upon by City of Renton and SB Structures,LLC for additional working days due to strike
by I11OE Local 302
All other terms and conditions of the above-referenced performance bond and payment bond shall remain unchanged
and in full force and effect.
IN WITNESS WHEREOF,the Surety has set its hand this 6th day of September,2018.
Liberty Mutual Insurance Company
Bye m -
Cynthia 1.Jay,Attorney-in-FaEt
THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
This Power of Attorney Wks the acts of those named herein,and they have no authority to bind the Company except to the manner and to the extent herein stated,
Certificate No,814S127
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENT&That The Ohio Casually Insurance Company Is a corporation duly organized under the laws of the Stale of New Hampshire,that
Liberty Mutual Insurance Company Is a corporation duly organized under the laws of the State of Massachusetts,and West American Insurance Company is a corporation duly
organized under the lewd of Ile State of Indiana(herein collectively tatted the'Companies').pursuant to and by authority herein set forth,does hereby name,constitute and appoint,
Heather L.Allen;James B.Binder t3randon K.Bush;Peter J.Comfort;Carley Espiritu;.Iocob T.Haddock;Diane M.Harding;Brent E.Heileman;Kyle J.
{ HowatL Cynthia L.Jay;Aticeon A.Kenner;Christopher Orion;Jamie L.Marques;Mary S.Norrel1LJon J.Otis,Annelies M.Fiichie:Karen C.Swanson.
-Eric A.Zimmerman
errrnan
all of the city of Tacoma ,state of WA each indlvldualy if there be more than one named,its true and lawful attorney to make,execute,seal,acknowledge
and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,In pursuance of these presents and shall
be as binding upon the Companies as If they have been duly signed by the president and attested by the secretary of the Companies In their an proper persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seats of the Companies have been affixed
thereto this 5th day of July , 2018 ,
`aV Ir'Stiy. so is snip,• �rI.4iy Z
f y 1...
: /{ ` "'�4°: The Ohio Casualty Insurance Company r
"ea 191 z 1991 Liberty Mutual insurance Company ;
:� s s �r West ratan Insurance Company
e By. 1 Cf�, J
g STATE OF PENNSYLVANIA ss David M.Care ,AssiMant Secretary I
ij-kgo COUNTY OF MONTGOMERY
ISdayOn this bah tali 2018 — r
of _. ,before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of liberty Mutual Insurance
v 0 Company,The Ohio Casualty Company,end West American Insurance Company,and that he,as such,being authorized so to do,execute the for E Instrument for the purposes e
2 therein containedsigning on behalf of the eo �o p Ale
a by g rig rporationa by himself ore a duly authorized officer. d
_ IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day end year fist above written. j
,y� pq+`? 4raark00.4WEALTH on PENNSYLVANIA 114,4
// Q
e.
2 4+eww LtC7L
U
rip +v >yI`i' NvnMN Seal . 1 '�O or s reuses paata&a,Nooxy PubFc By. �'"� O
tipper M.mon Twp,.MoneQnmary tunny Teresa Pricers,Notary Public, 1
— G a�'f My >e�l Esimes March 2e,2021
'.� �a�Rf' p„6.�.`'' ',Umbel P e,w 4 a,,Aaocn, ,of Nnranee Q I
cThis Power of Attorney is made and executed pursuant`o end by authority of ttne following Bylnrws end Aulhorizalbns of The Ohio Casualtyinsurance r
Insurance Company,and Went American Insurance Co g Company,Liberty Mutual 1l1 2
mpany which reeoludons era now in full farce and eNeG raadln ore folbws: �e
ARTICLE IV-OFFICERS Section 12.Power of AttorneyAnyofficer or other officinal of the Co
, rporatirun authorized for that purpose In writing by the Chairman or On Presider(,arc!subject O r
to such Imitation as the Chairman or the President may prescribe,shall appoint each ettomeysfil-fact,as may be necessary to act in behalf el the Corporation to make,execute,seal, , t
2 ne sei lodge and delver as surety any and ell undertakings,bonds,recognlrances and other surety obtigatione. Such attorneys-inn•tad,subject to the Imitations set forth in their respective •p
vi powers of attorney,shall have full power to bind the Corporation by their signature and execution of any such Instruments and to attach thereto the seal of the Corporatism. Whin so
I executed,such Instruments shalt be as bimdh,g as if signed by the President and attested lob the >J
w Y Secretary�Y P°�of authority granted to any representative w allomey�in-fact under >a
the provisions of this article may be revoked at any time by the Board,the Chairman,the Presklunl or by the officer or officers granting such power or authority,ay a ARTICLE AN-Erecuhon of Contracts.SECTION 5 Surety Bonds and Undertakings Any officer of the Company authonzed for that purpose in writing by the chairman or the president, FF c
Z> i and subject to such Imitations as the chairman or the president may prescribe,shark appoint such attorneys•irrfaet,as may be necessary to act in behalf of the Company to make,execute, C r
seal.ecknoetedge and deliver as surety arty and all undertakings,bonds,recognizances and other surety obligators Such attorneys-in-fact sutlject to the limaatiorru set truth inn thetr E o
respective powers of attorney.sham hem lilt power to bind the Company by thee signature and execution of any such instruments and to attach thereto the seal of the Company Who so g a
executed such instruments shell be as binding as if sigma by the president and attested by the secretary 4
- Certificate of Designation-The President of the Company,acting presume to the Bylaws of ten company,authorizes Oavid M.Carey,Assistant Secretary to appoint ouch attlrntrys im M•e
fed as may be necessary to act on behalf of the Company to make,execute,seal.acknowledge and delver as surety any and ad undertakings,hands,reengnirnnces and ether surety
obligations
Au hortzation-By unanimous connsere of the Company's Board of Directors,the Company consents that Ipcsimi a or mechanically reproduced signature of any assistant secretary of the
Company wherever appearing upon a certttked copy of any prover of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company Mei
the seine false and effect as though manually affixed.
I, Renee c. Llewellyn, the undersigned, Assistant Secretary, The Otto Casually Insurance Company, Liberty Mutual insurance Company, and West American Insurance Company do
hereby catufy the the original power of attorney of which the foregoing is a full,true end coned copy of the Power of Attorney executed by said Companies,is In full kern and rifled and
has rat been revoked, /'>` .
IN TESTIMOIlY WHEREOF,I have hereunto set my hand and affixed the seals of said Compares this H✓ day of ..a (? k s
_ a, "�� 41` tip ��L ,,a4 ,
I"'y 1912 a a. i991 i w�
°y�i+ ..,0on u.A9 a- a. = Renee C,Ile Install Secretary
e r p q.r.
LM5_12e73_022017
185 or 500