Change Order No. 3
Contract Title: N 27th Place Bridge Scour Repair Project
Contractor: SB Structures,LLC
Contract No. : CAG 18-002
Federal Aid No. : BHOS-1070(010)
- -
El Ordered by Engineer
D Proposed by the Contractor(VECP)
0 Unilateral
- _
Ori!g $444,783 22
inal Contract Amount:
Current Contract Amount: $468,383.22
Estimated Net Change This Order: $1,100.00
,New Contract Amount:
.
$469,483.22
Prepared By: Issuect,By:
( .f
,
.f.,.1,40,-
Pla,k . 2 IL izA",,5,
, ,e pvt. z ---- b.44451
---,—r'
.-
Date Engine ((Ay of Renton Transportation ate
6 4> fri /44 t...4.1 r Design Manager)
Reviewed By: Consent By:
Engineer of Record Date Surety(Greater than 25%cost and/or 20% Da e
thn ncrease)
Reviewed B , Endorsed
, .
ity o Rent n " Manager Date Cot tractor te
Executed By:
Reviewed By'
City Attorney(Grea r than$35,000 Date City Re on blic Works ate
and/or change in scope) mi istrator/Mayor
Change Order No. 3
Contract Title:_ .N 27th Place Bridge 5.„QUr Repairiroiect
Contract No. CAG-18-Q02, Page 1 of 5
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
• Delete the following bid items from the contract:
o Bid Item No. 35,Topsoil Type A, Quantity= 1 C.Y.
o Bid Item No. 37, Plant Selection Acer Circinatum/Vine Maple, Quantity= 12
• Add the following bid items to the contract:
o Plant Selection Physocarpus capitatus/Pacific Nine Bark, Quantity= 10
o Plant Selection Ribes sanguineum/Red Flowering Currant, Quantity= 10
o Plant Selection Lavandula/Lavender,Quantity=8
o Plant Selection Rosmarinus officinalis'prostratus'/Rosemary,Quantity=8
o Plant Selection Teucrium chamaedrys/Pink Germander, Quantity=2
• Add quantity to the following bid items to the contract:
o Bid Item No. 36, Plant Selection Thuja Plicata/Western Red Cedar,Add Quantity=3
• Delete special provision section 8-02.3(4)A Topsoil Type A.
• Replace special provision section 8-02.3(8)A Plant Sizes with the following:
8-02.3(8)A Plant Sizes
When the following bid items are included in the Proposal,the plant sizes are as follows:
Plant Selection Thuja Plicata/Western Red Cedar: minimum size 1 gallon
Plant Selection Physocarpus capitatus/Pacific Nine Bark: minimum size 1 gallon
Plant Selection Ribes sanguineum/Red Flowering Currant:minimum size 1 gallon
Plant Selection tavandula/lavender: minimum size 1 gallon
Plant Selection Rosmarinus officinalis`prostratus'/Rosemary: minimum size 1 gallon
Plant Selection Teucrium chamaedrys/Pink Germander:minimum size 1 gallon
• Delete special provision section 8-02.4 Measurement.
• Replace special provision section 8-02.5 Payment with the following:
8-02.5 Payment
Section 8-02.5 is supplemented with the following:
Change Order No. 3
Contract Title: 'hPlace Cfridgc Sour l ciM sal c ._ . .. .�
Contract No. CAC 002�. Page 2 of 5
"Bark or Wood Chip Mulch", per cubic yard
"Plant Selection Thuja Plicata/Western Red Cedar", per each
"Plant Selection Physocarpus capitatus/Pacific Nine Bark", per each
"Plant Selection Ribes sanguineum/Red Flowering Currant",per each
"Plant Selection Lavandula/Lavender", per each
"Plant Selection Rosmarinus officinalis'prostratus'/Rosemary", per each
"Plant Selection Teucrium chamaedrys/Pink Germander",per each
Reason for Change:
Some of the work was located within a native growth protection easement. Prior to clearing
and grubbing, the existing ravine had established cottonwoods in the immediate vicinity of the
culvert. Invasive species were also present within the clearing and grading limits, most notably
Himalayan blackberry.The steep slopes of the ravine are an erosion hazard with the existing
plants providing slope stability.Therefore,complete removal of the invasive species would
require extensive landscaping and erosion control measures that would need to be maintained
for many years.This was not viewed as very feasible given the steep slopes of the ravine.
In order use a crane to deliver material and equipment to the culvert,the cottonwoods had to
be cut down.The stumps were left in the ground because the extensive roots support the
ravine slopes.The cottonwoods will very likely start to grow again with their roots continuing to
support the steep slopes.With the additional sunlight,the Himalayan blackberry would
potentially overwhelm the vine maples due to a faster growth rate.Additionally, dry summer
conditions result in dry soil conditions along the slopes of the ravine. As a result, the City
decided to replace the Vine Maples with Pacific Nine Bark and Red Flowering Current which will
have a better chance of competing with the Himalayan blackberry and can get established
quickly to survive dry conditions next summer.
Upon completion of major construction activities and cleanup of the site, the neighborhood
HOA was contacted to review conditions in an area of the native growth protection easement
that the HOA has landscaped.This area resides with the HOA donated Temporary Construction
Easement(TCE)for the project.This area was disturbed by construction activities. Originally,
the City anticipated placing bark or wood chip mulch over disturbed areas. However,the HOA
did not want this as the landscapers who maintain the area for the HOA would likely blow the
bark back into the ravine. Instead the HOA requested plants including Lavender,Rosemerry and
Pink Germander be placed in the disturbed areas.The City agreed to do so in lieu of placing
bark.
Topsoil Type A was removed from the contract since the existing native soil is sufficient for
planting and plant establishment.
Change Order No._
Contract Title: tn�tepairProject
Contract No._CA -1B-tlC:__,__ Page 3 of
Materials:
• Physocarpus capitatus/Pacific Nine Bark, Quantity= 10
• Ribes sanguineum/Red Flowering Currant, Quantity= 10
• Lavandula/Lavender,Quantity=8
• Rosmarinus officinalis 'prostratus'/Rosemary, Quantity=8
• Teucrium chamaedrys/Pink Germander, Quantity=2
Plans:
No changes were made to the drawings.
Adjustment:
This Change Order includes changes as defined in Section 1-04.4. Specifically,the deletion of
work, altering specifications(e.g.changing plant types)and increased quantities.The estimated
cumulative total cost of these changes is$1,100.
Extension of Time:
The Time for Completion is extended 0 Working Days
Equitable Adjustment:
This Change Order does not include an equitable adjustment for any of the bid items deleted or
added to the contract by this change order. Prior to the Work, the City and Contractor agreed
to replace and/or add plants using the unit prices in the original bid,which was the same for
both plants listed in the original bid.
i r ,...---PIFWKI r°r M9L ,—L1LAd
Change Order No. 3
Contract Title: a_N 27th Place Bridge5Qur
Contract No._____CAtatjAIQL Page 4 of 5
Sections 1-04.4 and 1-04.5 of the 2016 WSDOT/APWA Standard Specifications shall govern
this Change Order.The Work of the referenced Contract Is modified to include the changes
detailed herein.The payment provided for herein shall constitute the complete and final
settlement for all costs of labor,equipment,materials,overhead,profit,permit fees, and all
other claims that may be made by the Contractor as a result of this change.
Attachments:
Forms to be attached to Change Order
0 Plans
0 Field Directive
O Change Order Quotation
O Estimated Change Order Cost
• Project Labor List
O Force Account Equipment Rate Request(DOT Form 422-010 EF)
O Equitable Adjustment Determination
Forms to be used during Force Account Work
O Daily Report of Force Account Labor
0 Daily Report of Force Account Equipment
El Daily Report of Force Account Materials
• Force Account Summary
�_. .--13L a.,ts.:,L w
Change Order No. 3
Contract Title: N 27th Place DridimabikrbliMiliPliQjta_
Contract No. CA 8.402 ._, Page 5 of S
Estimated Change Order Cost Change Order No. 3
Bid Item No. Description Quantity Unit Unit Price Estimated Cost
Force Account
Item description
Labor
Estimate $
Labor Markup 29% $
Equipment Estimate $
Equipment Markup 21% $
Materials Estimate _ $ -
Materials Markup 21% $ -
Services Estimate $
_—m., Services Markup 21% $
Mobilization Estimate $
Subcontractor Work Estimate $
Subcontractor Markup 12%,10%,7% $
Bid Item Change
35 TOPSOIL TYPE A -1 C.Y. $ 100.00 $ (100.00)
36 PLANT SELECTION THUJA PLICATA/ -12 EACH $ 40.00 $ (480.00)
WESTERN RED CEDAR
37 PLANT SELECTION ACER CIRCINATUM/VINE 12 EACH $ 40.00 $ (480.00)
MAPLE
3 01 PLANT SELECTION PHYSOCARPUS 10 EACH $ 40.00 $ 400.00
CAPITATUS/PACIFIC NINE BARK
3 02 PLANT SELECTION RIBES SANGUINEUM/RED 10 EACH Y $ 40.00 $ 400.00
FLOWERING CURRANT
3-03 PLANT SELECTION LAVANDULA/LAVENDER 8 EACH $ 40.00 $ 320.00
3 04 PLANT SELECTION ROSMARINUS 8 EACH $ 40.00 $ 320.00
OFFICINALIS'PROSTRATUS'/ROSEMARY
3-05 PLANT SELECTION TEUCRIUM 2 EACH $ 40.00 $ 80.00
CHAMAEDRYS/PINK GERMANDER
3 06 PLANT SELECTION THUJA PLICATA/ 15 EACH $ 40.00 $ 600.00
WESTERN RED CEDAR
Equitable Adjustment
Per attached determination Estimate $
Calculated Cost $ 1,060.00
Estimated Change Order Cost $ 1,100.00