Loading...
HomeMy WebLinkAboutInspection Report Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type EX SSMH SSMH 6 Laiton 8 PVC MH Depth ID Backup TapeTape Counter Date Time ed ISheet I 11 9/10/2018 —1 1:34 PM I I Yes Length Precipitation Ground Surface_ Weather I___ None P Dry [ Unpaved Clear 40' Downstream Manhole Structure '35.9' Service Connection Left Structure 110.8' Service Connection Left Structure ---"\ 125.9' Upstream Manhole Structure Page 4 of 4 Generated on 9/10/2018 at 1:58 PM by the PipeTech®TV inspection system. • Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton I 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type EX SSMH SSMH 6 LLalton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 1 9/10/2018 1:34 PM Yes Length Precipitation Ground Surface Weather I None Dry Unpaved Clear [-Ftg•:_condition_ • Category - - Garments_ 1 0.0'Downstream Manhole Structure [_35 .9rService Connection.Left_ _Structure _ v — l 110.8 Service Connection Left AStructure„ [125.9:Upstream.Manhole_ Structures V ' Page 3 of 4 Generated on 9/10/2018 at 1:58 PM by the PipeTectf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type EX SSMH SSMH 6 Lefton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 I 9/10/2018 1:34 PM Yes Length Precipitation Ground Surface Weather None Dry r Unpaved ] [_ Clear Incident Code: DNMH Incident Code: SCL, Incident Description: Downstream Incident Description : r1'Vice. Manhole Connection Left Feet : 0000.0 Severity: 0 Position: 9 Feet: 0035 .9 `r. 00[I2 . 0 10/18 11 : 06a 0035.9 F 09/10/18 11 : U6a DNMH - Downstream Manhole @ 0.0 ft. SCL - Service Connection Left @ 35.9 ft. Incident Code: SCL dent Code: UPMH Incident Description: Service dent Description : Upstream Connection Left die Severity : 0 It 0125.9 Position: 9 Feet . 0110 . 8 4 0110.8 F 09/10/18 11 :06a '5 . 9 F 09/10/18 11 :06a SCL - Service Connection Left @ 110.8 ft. UPMH - Upstream Manhole @ 125.9 ft. Page 2 of 4 Generated on 9/10/2018 at 1:58 PM by the PipeTectiTV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type EX SSMH SSMH 6 P Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 9/10/2018 L 1:34 PM 7 IYes Length Precipitation Ground Surface Weather None r Dry H I Unpaved 1 Clear Ftg. Condition Category Comments °0.0 Downstream Manhole Structure VialV °35.9 Service Connection Left Structure I p 111V 110.8 Service Connection Left Structure 125.9 Upstream Manhole Structure Page 1 of 4 Generated on 9/10/2018 at 1:58 PM by the PipeTecrr TV inspection system. i Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer _ Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 1 SSMH 2 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 9/10/2018 1:17 PM 11 Yes Length Precipitation Ground Surface Weather I None Dry Unpaved E Clear 7 0' Downstream Manhole Structure 49.5' Upstream Manhole Structure ----\ ----\ Page 4 of 4 Generated on 9/10/2018 at 1:34 PM by the PipeTectl'TV inspection system. Drain-Pro , 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539- 4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4 h St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 1 SSMH 2 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 1 9/10/2018 1:17 PM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Clear LEtg,_Condition ,Category Comments---------1 0.0 Downstream Manhole Structure.___ r.:49.57,Upstream.Manhole__._ Structure_ i Page 3 of 4 Generated on 9/10/2018 at 1:34 PM by the PipeTectf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 1 SSMH 2 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 F9/10/2018 1 1:17 PM Yes Length Precipitation Ground _ Surface Weather L____ None Dry P Unpaved r _ Clear Incident Code : DNMH Incident Code.:_ UPMH Incident Description: Downstream IncidentV,' - '• tioii Upstream Manhole Manhole': Feet : 0000.0 Feet: 0f',. « f i MI kil r i °, 0002 . ii I- "'' 0/10/18 11 :06a 0049.5 F 09/10/18 11 :06a DNMH - Downstream Manhole @ 0.0 ft. UPMH - Upstream Manhole @ 49.5 ft. Page 2 of 4 Generated on 9/1012018 at 1:34 PM by the PipeTectf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH _ Crew Truck Pipe Size Pipe Type I SSMH 1 SSMH 2 Laiton 8 PVC _ MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 9/10/2018 1:17 PM Yes Length Precipitation Ground Surface Weather 1 r- None I r Dry Unpaved Clear t. Ftg. Condition Category Comments 0.0 Downstream Manhole Structure V • V I 0 49.5 Upstream Manhole Structure Page 1 of 4 Generated on 9/10/2018 at 1:34 PM by the PipeTectf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type L. SSMH 2 SSMH 3 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 9/10/2018 L 1:05 PM I 1 Yes J Length Precipitation Ground Surface Weather I [ None I Dry Unpaved L Clear •0' Downstream Manhole Structure 104.6' Service Connection Left Structure 139' Upstream Manhole Structure -\ \ Page 4 of 4 Generated on 9/10/2018 at 1:17 PM by the PipeTech5 TV inspection system. Drain-Pro ' 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Constructior� Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 2I SSMH 3 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 9/10/2018 1:05 PM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Clear Etg.,.COI)dltlon � -. -- - -=,Categoi:y"`7,. '. . QominenEsS 0.0_Downstream Manhole ,Structure , __ _v—,.�_.________ L104. 6,Service Connection.Left .:Structure ' 139.0__Upstream Manhole____________Structure _ ! Page 3 of 4 Generated on 9/10/2018 at 1:17 PM by the PipeTecha TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 2 SSMH 3 Laiton 8 P PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 9/10/2018 1:05 PM I I Yes _ Length Precipitation Ground Surface Weather None P Dry Unpaved Clear Incident Code : DNMH Incident Code: SCL Incident Description.: Downstream Incident Description: Service Manhole Connection Left • Feet : 0000.0 +, Severity: 0 Position: 9 stj Feet: 0104 .6 ]r • 0002 . 0 F in— 0/18 11 : 06a 11104 . 6 F 09/10/18 11 : 06a DNMH - Downstream Manhole @ 0.0 ft. SCL - Service Connection Left @ 104.6 ft. Incident Cd.•, ,'.• , Incident0 r upstream Manhole Feet : 013 „ 0139.0 F 09/10/18 11 : 06a UPMH - Upstream Manhole @ 139.0 ft. Page 2 of 4 Generated on 9/10/2018 at 1:17 PM by the PipeTech®N inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH _Crew Truck _ Pipe Size Pipe Type SSMH 2 SSMH 3 Laiton _ 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 1 9/10/2018 1:05 PM MOM Length Precipitation Ground Surface Weather None II Dry Unpaved Clear Ftg. Condition Category Comments 0.0 Downstream Manhole Structure V V I 104.6 Service Connection Left Structure I 139.0 Upstream Manhole Structure Page 1 of 4 Generated on 9/10/2018 at 1:17 PM by the PipeTectf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 3 SSMH 4 Laiton I 8 1 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 5 9/10/2018 2:09 PM I I Yes Length Precipitation Ground Surface Weather P None ] r— Dry Unpaved Clear -0' Downstream Manhole Structure 39.8' Ponding 3/8"Pipe' 43.9' Upstream Manhole Structure ------\ ----\ Page 4 of 4 Generated on 9/10/2018 at 2:29 PM by the PipeTech�TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 I ' ' Customer Project City Street L_1on construction I I Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe 8 P e Size �Pi T e SSMH 3 SSMH 4 Laiton - C� MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 5 9/10/2018 2:09 PM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Clear bftg._Condition Category Comments. - - 1 0.0_Downstream Manhole .Structure `39.8'_Ponding3/8": °.Pipe_"� . --�---�--� I 43.9_Upstream Manhole 'Structure l Page 3 of 4 Generated on 9/10/2018 at 2:29 PM by the PipeTectia TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project _ City Street Hoffman Construction Sewer Final r Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 3 SSMH 4 Laiton 8 PVC MH Depth r Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 5-1 I I I 9/10/2018 2:09 PM I I Yes Length Precipitation _ Ground _ Surface Weather (___ L None 1 r Dry I Unpaved [ Clear Incident Code: DNMH Incident Code: P38 Incident Descr,.,\ptIon: Downstream Incident Desc iption: Po ding 3/ Manhole \', Feet : 0039.8 Feet: 0000.0 4 4 . ,.. .... . Via:�' • ;� / r, ,-*. ) ' •' Z *I 4. : ' ID 4 :-. .- 01107. .tt F }09 R_. `: 0 - .06a 039 . (1 ( ' - ; /1t i 1 :0 6 a DNMH - Downstream Manhole @ 0.0 ft. P38 - Ponding 3/8" @ 39.8 ft. Incident Code: UPMH Incident Description: U ream Manhole .., Feet: oese.s I • 4 0043 .9 F 09/10/18 11 : 06u UPMH - Upstream Manhole @ 43.9 ft. Page 2 of 4 Generated on 9/10/2018 at 2.29 PM by the PipeTectf°TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 3 SSM_4 Laiton 8 PVC 1 MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed [ Sheet 5 J 9/10/2018 2:09 PM Yes _ Length Preci station _ Ground Surface Weather None ( Dry Unpaved Clear Ftg. Condition Category Comments 0.0 Downstream Manhole Structure V V 39.8 Ponding 3/8" Pipe 0110 •43.9 Upstream Manhole Structure Page 1 of 4 Generated on 9/10/2018 at 2:29 PM by the PipeTech TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 _ Customer _ Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH 5 L Latton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Timeed I —1 1 Sheet 6 I I 9/10/2018 I I 2:29 PM I I Yes Length Precipitation Ground Surface Weather P None i L Dry I_ Unpaved -] C Clear 90' Downstream Manhole Structure '36.8' Service Connection Left Structure '103.9' Service Connection Left Structure •155' Service Connection Right Structure 218.3' Service Connection Right Structure 238.8' Service Connection Left Structure ----\ --\ 259.6' Upstream Manhole Structure 0 0 Page 5 of 5 Generated on 9/10/2018 at 2:55 PM by the PipeTecii TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final I Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type I SSMH 4 _I SSMH 5 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 6 9/10/2018 2:29 PM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Clear LEtg„Condition - Category Comments-- . I 0.0 Downstream Manhole t Structure L 36.8.Service Connection _Left Structure _ 103.9.ServiceConnection Left Structure J..155.0_ServiceConnection.Right :Structure 1 218.3 .Service Connection Right______ Structure____________ ____ _____ [238.8_Service Connection Left Structure 1 r259.6 Upstream ManholeStructure _ ___--i. .1 Page 4 of 5 Generated on 9/10/2018 at 2:55 PM by the PipeTecif TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project Cites Street Hoffman._Construction Sewer Final .1 [ ___ Renton ] P _. 62O1 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH 5 Laiton _ 8 [ PVC 1 MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 6 r __j 9/10/2018 2:29 PM Yes Length Precipitation Ground Surface Weather None 1 L Dry P Unpaved Clear Incident Code: $CR Incident Code: SCL Incident Description: Service Incident Description : Service Connection Right Connection Left Severity: 0 Severity : 0 Position: 3 Position : 9 Feet : 0218.3 Feet: 0238. 8 • 09/10' 1 : 06a 0238.8>= -"• 89/10/18 11 :06a SCR - Service Connection Right © 218.3 SCL - Service Connection Left @ 238.8 ft. ft. .ent Code: UPMH .ent Description: Upstream 0259.6 0 F 09/10/18 11 : 06a UPMH - Upstream Manhole @ 259.6 ft. Page 3 of 5 Generated on 9/10/2018 at 2:55 PM by the PipeTecti TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction 1 F Sewer Final Renton 6201 NE 4th St Start MH End MH Crew _ Truck Pipe Size Pipe Type SSMH 4 SSMH 5 Laiton 1 8 J PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 6 9/10/2018 2:29 PM I : Ye Length _P_ reci itation Ground Surface Weather I I r Non Dry Unpaved [_ Clear J Incident Cod-ij: DNMH Incident Code: SCL Incident Description : Downstream Incident Description: Service Manhole A. Connection Left Feet: 0000.0 Severity : 0 Position : 9 Feet : 0036.0 0 jt R 44101 . ' • • v0002 -4j _ '06a'tl•. 0036 . 8 F 09/10/18 11 : 06a r 7 •• . DNMH - Downstream Manhole @ 0.0 ft. SCL - Service Connection Left @ 36.8 ft. Incident Code: SCL Incident Cede : STR Incident Description: Service Incident Description . Service Connection Left Connection Right Severity : 0 Severity : 0 • Position : 9 Position. 3 Feet : 0103.9 Feet : 0155 . 0 0103 .9 F 09/10/18 11 :06a 0155 . 0 F 09/10/18 11 :06a SCL - Service Connection Left @ 103.9 ft. SCR - Service Connection Right @ 155.0 ft. Page 2 of 5 Generated on 9/10/2018 at 2:55 PM by the PipeTeclf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH 5 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 6 9/10/2018 2:29 PM Yes Length Precipitation Ground Surface Weather None Dry _ Unpaved Clear _ Ftg. Condition Category Comments 0.0 Downstream Manhole Structure V 36.8 Service Connection Left Structure 103.9 Service Connection Left Structure 1/ •155.0 Service Connection Right Structure '218.3 Service Connection Right Structure 238.8 Service Connection Left Structure ti .259.6 Upstream Manhole Structure Page 1 of 5 Generated on 9/10/2018 at 2:55 PM by the PipeTectP TV inspection system. Drain-Pro • 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 I ' ' Customer - I Project City Street L_ offt ar1Const cILoJ Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH 8 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 7 9/10/2018 2:55 PM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Clear 0' Downstream Manhole Structure -'44' Service Connection Right Structure r45.9' Service Connection Left Structure 138.1' Service Connection Left Structur 143.2' Service Connection Right Structuri 176.6' Upstream Manhole Structure o:: _A,p Page 5 of 5 Generated on 9/10/2018 at 3:25 PM by the PipeTectP TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street I Hoffman Construct ons Sewer Final I Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH 8 Lefton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 7 7 9/10/2018 2:55 PM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Clear Leg-Condition Category Comments — 0.0 Downstream Manhole Structure _ r_44.0..ServiceConnection Right— _.Structure��__. __. ______ r- 7- 45.9. Connection Left Structure T___.___.. _� 1.,138.1_Service Connection..Left_ _Structure _. • i143.2Service Connection:Right _,Structure______ _-�. L176.6:Upstream Manhole.____ _Structure_ U.... Page 4 of 5 Generated on 9/10/2018 at 3:25 PM by the PipeTeclle TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction ] Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH 8 Lofton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 7 9/10/2018 2:55 PM I ! Yes Length Precipitation Ground Surface Weather None ] _ Dry Unpaved P Clear tnc.dent Code: SCR Incident Code: UPMH Incident Description: Service Incident Description;: Upstream Connection Ri9ht Manhole Severity: 0 Feet: 0170 . 0 Position : 3 Feet : 0141:2 nti 7 1 09/10/18 11 : 06a 0176 . 6 F 09/10/18 11 : 06a SCR - Service Connection Right @ 143.2 UPMH - Upstream Manhole @ 176.6 ft. ft. Page 3 of 5 Generated on 9/10/201 S at 3:25 PM by the PipeTecti5 TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction I Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH8 Laiton 8 PVC 1 MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed L Sheet 7 ( 9/10/2018 2:55 PM I I Yes Length Precipitation Ground Surface Weather 1 None L Dry 1 IUnpaved ) L__ Clear • 'NMH Incident Code :" SCR - - , 1ion: Irownstream Incident Description : Ser Connection Right Severity: 0 Pdsition: 3 .Feet: 0044. 0 1 r' 1, , I , ot 1 ' • ,... „, 0002. 0 F , 0/18 11 : 011 0044 . 0 f 09/10/18 11 : 06a DNMH - Downstream Manhole @ 0.0 ft. SCR - Service Connection Right @ 44.0 ft. IncidentCode: SC Incident Code.: SCL ` ; Incident Descriptia Incident Description: S.eruite ':Connection Left .. ._. Connection Left _ Severity: 0 Severity: 0 ' Position: 9 Position: 9 • Feet: 0045. 9 Feet: 0138 . 1 1 1 0045.9 F 09/10/18 11 :06a 0138. 1 F 09/10718 1,4 : 06a SCL - Service Connection Left @ 45.9 ft. SCL - Service Connection Left @ 138.1 ft. Page 2 or 5 Generated on 9/10/2018 at 3:25 PM bythe Pi eTectf®TV inspection system. P P Y Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 _ _Customer _ Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH —� End MH Crew Truck Pipe Size Pipe Type SSMH 4 SSMH 8 Laiton 8 PVC MH Depthment ID Backup Tape Tape Counter Date Time Dyed Sheet 7-1 I I 9/10/2018 I 2:55 PM Yes Length Precipitation Ground Surface Weather None J P Dry Unpaved Clear Ftg. Condition Category Comments 0 0 Downstream Manhole Structure I/ II •44.0 Service Connection Right Structure -•45.9 Service Connection Left Structure I: V 11. 138.1 Service Connection Left Structure •143.2 Service Connection Right Structure 176.6 Upstream Manhole Structure Page 1 of 5 Generated on 9/10/2018 at 3:25 PM by the PipeTecll TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction _ Sewer Final I Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type I SSMH 6 I SSMH 7 1 Laiton 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 I 9/10/2018 I I 1:58 PM Yes Length Precipitation Ground Surface Weather [__ None J [ Dry J Unpaved I Clear '0' Downstream Manhole Structure `13.4' Ponding 3/8"Pipe '17.8' Ponding 3/8"Pipe •17.9' Service Connection Left Structure ----\ 32.5' Upstream Manhole Structure Page 5 of 5 Generated on 9/10/2018 at 2:09 PM by the PipeTecfh TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street I Hoffman Construction Sewer Final Renton t 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 6 P SSMH 7 Laiton 8 PVC ] MH Depth Segment ID Backup Tape Tape Counter Date Time D ed Sheet 1 9/10/2018 1:58 PM Yes Length Precipitation Ground Surface Weather None Dry Unpaved Clear LEtg Condition Category Comments 0.0 Downstream Manhole Structure___ _,., L13.4LP.onding3/8' ,.Pipe_ `----�---�—" ___�— __l 17.8_Pondina.3/8- __ Pipe E17.9„Service.Connection,Left, Structure 32.5_Upstream Manhole Structure Page 4 of 5 Generated on 9/10/2018 at 2:09 PM by the PipeTectf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 6 I SSMH 7 Laiton 8 PVC MH Depth Segment ID Backup Tape , Tape Counter Date Time Dyed I 1 1 Sheet 1 r I I 9/10/2018 1 1:58 PM I I Yes Length -- Pr�eciPitation Ground Surface Weather IL None ] _ Dry -1 P Unpaved Clear Incident Code: UPMH Incident Descri .. .n: Upstream Manhole Feet : 00 0032.5 F 09/10/18 11 : 0(;,1 UPMH - Upstream Manhole @ 32.5 ft. Page 3 of 5 Generated on 9/10/2018 at 2:09 PM by the PipeTectP TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St J Start MH End MH Crew Truck Pipe Size Pipe Type l SSMH 6 SSMH 7 Laiton 8 _i L PVC MH Depth Segment ID Backup Tape Tape Counter Date Time Dyed Sheet 1 H I _ 91101201.8 1 I 1:58 PM H Yes Length Precipitation Ground Surface Weather I None [ Dry Unpaved [._ Clear Incident Code: ONMH Incident Code : P311 Incident Descriptiori',0 Downstream Incident Description: Ponding 3/8" Manhole Feet: 0013. 4 Li Feet: 0000.0 VC ii'' '' Sr \\ i 0002 .0 F - �` 9i10i18 11 : 06a 0013. 6 F 19i10i19 11 :06a DNMH - Downstream Manhole @ 0.0 ft. P38 - Ponding 3/8" @ 13.4 ft. iir Incident Code: P30-,; Incident Code: SCL Incident Descriptiron: Ponding 3/8" Incident Description : Service Feet: 0017 .8 ,Ii Connection Left Severity: 0 Position: 9 Feet: 0017.9 J1 0017 . 8 F IL 'i/18 11 : 06a 0017.9 f 09/10/18 11 : 06a P38 - Ponding 3/8" @ 17.8 ft. SCL - Service Connection Left @ 17.9 ft. Page 2 of 5 Generated on 9/10/2018 at 2:09 PM by the PipeTecrf TV inspection system. Drain-Pro 2901 72nd Street E Tacoma, WA 98411 Phone: 253-539-4498 Fax: 253-539-4497 Customer _ Project City Street Hoffman Construction Sewer Final Renton 6201 NE 4th St Start MH End MH Crew Truck Pipe Size Pipe Type SSMH 6 SSMH 7 Laiton 1 8 PVC MH Depth Segment ID Backup Tape Tape Counter Date Time f Dyed Sheet 1 9/10/2018 1:58 PM Yes j Length Precipitation Ground Surface Weather 1 I None I r Dry I I Unpaved Clear_ 1 Ftg. Condition Category Comments 0.0 Downstream Manhole Structure IDV 4 •13.4 Ponding 3/8" Pipe . _ •17.8 Ponding 3/8" Pipe 17.9 Service Connection Left Structure V 32.5 Upstream Manhole Structure Page 1 of 5 Generated on 9/10/2018 at 2:09 PM by the PipeTech5 TV inspection system.