HomeMy WebLinkAboutMFP19000250DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000250
IVR Number: 19000250
Permit InformaƟon
Permit Name:Puget Sound Energy - Electric
Address/LocaƟon:01/15/2019Application Date:3223059104Parcel Number:17808 108TH AVE SE
Permit Type:01/16/2019Issue Date:Franchise
Permit Work Class:01/16/2020Expiration Date:Minor Utility
Job Number:108110655Franchise Type:Electric
Description:Remove overhead temporary service. Remove OH wire from pole P01 to P02. Remove P02. Restoration per City of
Renton Standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General CondiƟons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for AN
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
108110655
Anish Kumar
253-208-2183
anish.kumar@pse.com
17808 108th Ave SE 98055 108110655
Crew to remove OH wire section from P01 to P02, remove pole at P02 and
remove OH temp service from P02 to M01. No pavement cuts anticipated. Restoration per City
of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
1/09/2019
MFP19000250
Holly Powers 1/15/19
Justin Johnson 1-16-2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
108110655
PSE/Potelco Inc.
Bobby Gallaher 253-395-6829
6905 S 228th St, Kent, WA 98032
robert.gallaher@pse.com
17808 108th Ave SE
TBD
2/15/2019
Anish Kumar 1/09/2019
MFP19000250
Justin Johnson
1-16-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
17808 108th Ave SE
Renton
WA 98055
USA
P01
M01
12
12
ARRW-BRD
RIGHT LANE
CLOSED
AHEAD W20-5RW4-2LROAD
WORK
AHEAD W20-1350'350'350'X'X'PLACE W20-1 SIGNS ON ALL
ADJACENT STREETS WITHIN
FEET OF WORK AREA
ROAD
WORK
AHEAD W20-1ROADWORKAHEADW20-112 12 9 11 11ROADWORKAHEADW20-1350'SE 180TH ST BENSON RD S 108TH AVE SESE CARR RD SE PETROVITSKY RD
ROADWORKAHEADW20-1
Job#108110655
17808 108TH AVE SE & SE 180TH ST,
RENTON, WA
December 13, 2018
Sheet 1 of 1
Yuriy.Bashtovoy@pse.com
(425) 424-6603
N
PSE PUGET
SOUND
ENERGY
PRINT ON
11X17" SHEETS ONLY
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MINIMUM TAPER LENGTH = L (feet)
LANE
WIDTHS
POSTED SPEED LIMITS
20 25 30 35 40 45
10
11
12
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
Puget Sound Energy
Traffic Control Supervisor:
Yuriy S. Bashtovoy
Card No. 011687
Card Exp. 06/30/2022
Yuriy.Bashtovoy@pse.com
(425)424-6603
TRAFFIC BARRELS
WITH BEACONS
TRAFFIC FLOW
SIGN LOCATION
LEGEND
POLE
CHEVRON
ARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the
MUTCD and City of RENTON standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP19000250
3223059104
17808
PARCEL #
316867-166328
50 kVA 120/240V (A)
316438-166327
150 kVA 120/208V (ABC)
316465-166293
112 kVA 120/208V (ABC)108TH AVE SE316867-166317
112.5 kVA 120/208V (ABC)
316443-166290
75 kVA 120/208V
316438-166326 109TH AVE SE316462-166332
UNK (65T)
17654
17660
17804
17810
17818
17826
17816
17655
17642
17636
17661
17654
17660
17804
17810
17818
17826
17816
17655
17642
17636
17661 JJ
ROL
15
316443-166298
OH TEMP
JOB SITE
GAS
PHONE
CABLE TV
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
HP Main
HP Svc/MSA
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)108110655N
Vicinity Map
NOT TO SCALE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
N. LANIER 253-234-6437 12/12/18
N. LANIER 253-234-6437 12/12/18
A. CABRERA 562-292-0135 12/12/18
N/A RENTON
PAN-15 / 17808 108TH AVE SE
DISCON OH TEMP
17808 108TH AVE SE, RENTON, 98055
ASPLUNDH CONSTRUCTION CORP.
108110655
AS NOTED 1/1
KING CSPSKERE
NE 32-23N-05E
2204E081 2204E084 PAN-122204E081
506686392 108110655
SITE MAP
SCALE: 1" = 50'
CIRCUIT FEET ADDED: NONE SCOPE OF WORK
P01
POLE TO REMAIN
P02
REMOVE POLE
P01-P02
REMOVE OH SEC
P02-M01
REMOVE OH TEM SVC
M01
PULL METER
THOMAS GUIDE
686-D1
POLE TABLE (REMOVAL)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P02 316443-166298 PSE Equip #
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:NICHOLAS LANIER
253-234-6437
NICHOLAS.LANIER@PSE.COM
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
FLOWING DITCH or BODY OD WATER
SLOPE
Secure bottom of fence
with gravel bags
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Adjacent to flowing ditches or bodies of water
Install silt fence around
pole excavation
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
Not to Scale
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2305E136
Owner / Developer Contact Info
officeATTN:
RPI SKIPPERS LLC
2618 2ND AVENUE
SEATTLE, WA 98121
Eric Pierce 425-485-4321
MFP19000250