Loading...
HomeMy WebLinkAboutMFP19000326DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19000326 IVR Number: 19000326 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :12/20/2018Application Date:7231501330Parcel Number:319 MAIN AVE S Permit Type:01/18/2019Issue Date:Franchise Permit Work Class:01/18/2020Expiration Date:Major Utility Franchise Type:Electric Description:On Cedar Ave S, trench 15' and bore 15' to connect new conduit between new SW01 and existing SW02. On 3rd St, Trench 15' and bore 15' to connect new conduit between IP03 and IP04 to connect to existing PV03 and SW03. Trenching outside limits will be on a separate WSDOT permit. PSE to trench, backfill and complete restoration. Restoration per City of Renton standards. PRE CONSTRUCTION MEETING REQUIRED Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 101108880 Anish Kumar 253-208-2183 anish.kumar@pse.com 1991 S 3rd St 101108880 On Cedar Ave S, trench 15' and bore 15' to connect new conduit between new SW01 and existing SW02. On 3rd St, trench 15' and bore 15' to connect new conduit between IP03 and IP04 to connect to existing PV03 and SW03. Continued below** Potelco Inc.253-208-2183 BL005109 Poteli*227PL 12/07/2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 101108880 PSE/Potelco Inc. Vasiliy Trofimenko 253-395-6993 6905 S 228th St, Kent, WA 98032 vasiliy.trofimenko@pse.com 1991 S 3rd St TBD 1/7/2019 Anish Kumar 12/07/2018 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). Trenching outside City limits will be on a separate WSDOT permit. PSE to trench, backfill and complete restoration. Restoration per City of Renton standards. RRRRBUS STOP 121213111213111611111111101111111013131210111111111111S 4TH STMAIN AVE S(SR-515)HOUSER WAY SS 3RD ST13191320131315151010RR 13131320S 3RD ST CEDA R A V E S CEDAR AVE SMIL L A V E SS 4TH STBEACON WAY SSW01IP02IP01ARRW-BRD W4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1ROADWORKAHEADW20-1 100'ROADWORKAHEADW20-1DETOURM4-9b R9-11SIDEWALKCLOSEDAHEADDETOURM4-9bSPOTTER WILL DIRECTPEDESTRIANS TO USE PARKING LOTS ASPEDESTRIANS DIVERSION PATHSTOPFLAGG ERDETOURM4-9bSIDEWALKCLOSEDR9-9 SIDEWALKCLOSEDR9-9R9-11SIDEWALKCLOSEDAHEADROADWORKAHEADW20-1I- 4 0 5 Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063NPSEPUGETSOUNDENERGYJOB#1011088801991 S 3rd St, Renton, WASeptember 24, 2018ina.ustemchuk@pse.com425-398-6063SHEET 1 of 7WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWNotes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.0'7035 RRRRBUSSTOP 121213111213111611111111101111111013131210111111111111MAIN AVE S HOUSER WAY SMAIN AVE S 131913201313151513131 3 1 31010RR13131320S 3RD STHOUSER WAY SCEDAR AVE S CEDAR AVE SMIL L A V E SS 4TH STBEACON WAY SS 3 R D S T RENTON AVE SSW01IP02IP01STOPFLAGGERSTOPFLAGGER STOPFLAGGER STOPFLAGG ERONE LANEROADAHEADW20-4ROADWORKAHEADW20-1 W20-7A 100'100'100'ONE LANEROADAHEADW 2 0 - 4ROADWORKAHEADW 2 0 - 1 W 2 0 - 7 A 10 0 ' 10 0 ' 10 0 'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1 W20-7A X'X'X'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1 W20-7A X'X'X'BEPREPAREDTOSTOPW3 - 4 ROADWORKAHEADW2 0 - 1 W2 0 - 7A X ' X ' X 'ROADWORKAHEADW20-1 I-405 I-405Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063NPSEPUGETSOUNDENERGYJOB#1011088801991 S 3rd St, Renton, WASeptember 24, 2018ina.ustemchuk@pse.com425-398-6063SHEET 2 of 7WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROW0'8040Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m. RRRR121213111213111611111111HOUSER WAY SS 3RD STMAIN AVE S 13191320131313131 3 1 31010RR13 ONE WAYRR11111313201213S 3RD STHOUSER WAY SHOUSER WAY SMILL AVE SCEDAR AVE S CEDAR AVE SMIL L A V E S S 3 R D S T RENTON AVE SIP04SW03PV03IP03STOPFLAGGE R STOPFLAGG E R STOPFLAGG ER ONE L A N E ROAD AHEA D W20-4ROAD WORK AHEA D W20-1W20-7A100'100'100'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7A100'100'100'BEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7A100'100'100'ROADWORKAHEADW2 0 - 1 W2 0 - 7 A X' X' X'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1 W20-7A X'X'X'BEPREPAREDTOSTOPW3 - 4 ROADWORKAHEADW20-1I- 4 0 5 Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063NPSEPUGETSOUNDENERGYJOB#1011088801991 S 3rd St, Renton, WASeptember 24, 2018ina.ustemchuk@pse.com425-398-6063SHEET 3 of 7WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROW0'8040Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m. 13111613191320131313131 3 1 31010RR13 ONE WAYRR11111313201213S 3 R D S THOUSER WAY SHOUSER WAY SMILL AVE SCEDAR AVE S CEDAR AVE SMILL AVE S S 3 R D S T RENTON AVE SIP04SW03STOPFLAGG E R STOPFLAGGE R STOPFLAGG ERBEPREPAREDTOSTOPW3 - 4 ROADWORKAHEADW2 0 - 1 W2 0 - 7 A 1 0 0 ' 1 0 0 ' 1 0 0 'ONE LANEROADAHEADW20-4ROADWORKAHEADW20-1 W20-7A 100'100'100'SIDEWALKCLOSEDR9-9DETOURM4-9bSIDEWALKCLOSEDR9-9 R9-11SIDEWALKCLOSEDAHEAD FLAGGERS WILL ASSISTPEDESTRIANS TO CROSSA WORKING ZONEONE LANEROADAHEADW20-4ROADWORKAHEADW20-1W20-7AX'X'X'RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREI- 4 0 5 Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063NPSEPUGETSOUNDENERGYJOB#1011088801991 S 3rd St, Renton, WASeptember 24, 2018ina.ustemchuk@pse.com425-398-6063SHEET 4 of 7WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROW0'8040Notes:1. All signs and spacing to conform to theMUTCD and King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwiseindicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m. RRR1112131116111113191320131313131 3 1 31010RR13 ONE WAYRR11111313201213S 3RD STHOUSER WAY SHOUSER WAY SMILL AVE SCEDAR AVE S CEDAR AVE SMILL AVE S S 3 R D S T RENTON AVE SIP04SW03TMATMATMAC L E A R A R E A ( S E E NO T E S ) " C H A S E R " V E H I C L E , L A S T V E H I C L E I NQU E TO I N S U R E S A F E T Y (W S P )2.0 SEC2.0. SECROLLINGSLOWDOWNBEPREPAREDTO STOPFIELD LOCATE 1 MILE (+/-) INADVANCE OF LANE CLOSUREPCMS BOARDGAP = 10 Min (20/60) = 3.33 MilesCLEARANCE = 3.33 Miles (60-20/60) = 5.0 MinDISTANCE = 5 Min (60/60) = 5.0 MilesALL VEHICLES REQUIRED TO HAVEWARNING BEACONS & ARROWBOARDS IN CAUTION MODE(TMA'S RECOMMENDED)POLICEK9 UNITSRMP 3.65TMA TM A TMA C L E A R A R E A ( S E E NO T E S ) " C H A S E R " V E H I C L E , L A S T V E H I C L E I NQU E TO I N S U R E S A F E T Y (W S P )POLICEK9 UNIT2.0 SEC2.0. SECROLLINGSLOWDOWNBEPREPAREDTO STOPFIELD LOCATE 1 MILE (+/-) INADVANCE OF LANE CLOSUREPCMS BOARD2.0 SEC 2.0. SECORSTOPPEDVEHICLESTRUCK MOUNTED PCMSCAUTIONSLOWINGTRAFFICNPSEPUGETSOUNDENERGYJOB#1011088801991 S 3rd St, Renton, WASeptember 24, 2018ina.ustemchuk@pse.com425-398-6063SHEET 5 of 7Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431Notes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egresses shall becompletely clear unless otherwise indicated.3. Alert affected residents and businesses if existing onWSDOT roadway.4. Work area will be Approx. SRMP 3.65 for Cable work.5. See sheet X for WSDOT Notes and Tables.0'100'50'VICINITY MAPWORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROW 2.1.3.4.WORKAREA5.6.7.8.9.10.RAMP CLOSURES NB1). NE 44th St2). NE 30th St3). SR 900 (Park Av)4). Sr-169/ Sunset Blvd/SR 900RAMP CLOSURES SB5). SR 515/Talbot Rd S6). SR 167 & I-405 (N & SB)7). SR 181 & I-405 (N & SB)8). Tukwila Pkwy & I-405 W & E Approaches to Ramp9). 1-5 & SR 518 (N & S I-5 Ramps)10). PACIFIC HWY S & SR 518NPSEPUGETSOUNDENERGYJOB#1011088801991 S 3rd St, Renton, WASeptember 24, 2018ina.ustemchuk@pse.com425-398-6063SHEET 6 of 7Puget Sound EnergyTraffic Control Supervisor:Stephen R GadkeCard No. 010741Exp.5/31/2021stephen.gadke@pse.com(425) 424-6431 NPSEPUGETSOUNDENERGYJOB#1011088801991 S 3rd St, Renton, WASeptember 24, 2018ina.ustemchuk@pse.com425-398-6063SHEET 7 of 7””– GASPHONECABLE TV101108880THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Correct QC Checklist(s) reviewed.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.Vasiliy Trofimenko425-457-9001Project Manager Contact Information:Owner / Developer Contact InfoofficeATTN:WSDOTI-405 ProgramRandy Norberg425-456-8578PHONECABLE TV11344129101108880PROJECT PHASEPWRNOTIF#ORDER#SuperiorRemovalUG ExpenseJOB SITE-BSEE PG 5S 3RD ST BRIDGEPUBLIC IMPROVEMENTCONFLICT UI1630S 3RD ST BRIDGEPUBLIC IMPROVEMENTCONFLICT UI1630GENERAL NOTES1.PRE-CONSTRUCTIONNOTIFY APPROPRIATE CITY OR COUNTY 48 TO 72 HOURS OR AS REQUIRED BY PERMITTING AGENCYBEFORE STARTING WORK ON ANY RIGHT-OF-WAY INVOLVING A PERMIT.FOLLOW ALL REQUIREMENTS AS OUTLINED BY THE PERMITTING AGENCY.LOCATE AND MARK ALL UNDERGROUND UTILITIES PRIOR TO START OF CONSTRUCTION. IF THERE IS ACONFLICT WITH THE INTENDED TRENCH ROUTE AS SHOWN ON THE SITE PLAN AND EXISTING UTILITIESOR OBSTRUCTIONS, TRENCH ROUTE MAY NEED TO BE MOVED TO OPPOSITE SIDE OF STREET.COOPERATION WITH QUALITY INSPECTOR, PUGET SOUND ENERGY CONTRACTOR, CITY OR COUNTYAUTHORITIES DURING PRE-CONSTRUCTION MEETING WILL DETERMINE THE FINAL TRENCH ROUTE.2.EXISTING UTILITIESHAND EXCAVATE (POTHOLE) ALL MARKED UTILITY CROSSINGS TO VERIFY EXACT LOCATION ANDDEPTH AT POINT OF CROSSING. PROTECT UNDERGROUND UTILITIES DURING EXCAVATION. USE HANDEXCAVATION METHODS IF NECESSARY TO AVOID DAMAGE. FABRICATE AND INSTALL ADEQUATETEMPORARY STRUCTURES TO SUPPORT AND PROTECT UNDERGROUND UTILITIES WHILE EXPOSEDDURING CONSTRUCTION.MAINTAIN 6" MINIMUM CLEARANCE AT CROSSINGS BETWEEN EXISTING UTILITIES AND NEW DUCTINSTALLATIONS. TRANSITION TRENCH OR TUNNEL PROFILE GRADUALLY AS REQUIRED ATCROSSINGS. MAINTAIN 24" MINIMUM SEPARATION BETWEEN NEW TRENCH OR TUNNEL AND PARALLELEXISTING UTILITIES OR AS REQUIRED BY THE PERMIT AGENCY.IN THE EVENT OF DAMAGE TO AN UNDERGROUND UTILITY, NOTIFY PUGET SOUND ENERGY AT ONCE.CONTRACTOR AGREES TO MAKE WORK FORCE AND RESOURCES AVAILABLE AT ONCE TO PUGETSOUND ENERGY OR MUNICIPAL AUTHORITIES TO REPAIR DAMAGE AT NO COST.3.WORK DRAWINGSMAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF ALL WORK DRAWINGS. THESEDRAWINGS SHALL BE AVAILABLE AT ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE.CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE RECORDED CONTINUOUSLY ONTHESE DRAWINGS. ALL UNDERGROUND ELECTRICAL FACILITIES SHALL HAVE A MINIMUM OF 36INCHES OF COVER. ANY CHANGE MUST BE APPROVED BY THE PSE ENGINEER OR PROJECT MANAGER.FURNISH PUGET SOUND ENERGY A COMPLETE SET OF AS BUILT PRINTS (FOREMAN'S COPIES) AT THEEND OF THE JOB.4.SAFETYPROVIDE SIGNS, BARRICADES, AND TRAFFIC CONTROL IN CONFORMANCE WITH LOCAL JURISDICTIONSAND REGULATIONS. PROVIDE FLAGGING AND OR OTHER VEHICLE TRAFFIC CONTROL AS NEEDED INCONFORMANCE WITH LOCAL REGULATIONS. (SEE SPM # 100.4000) PROVIDE ADEQUATE SIGNAGE ANDPROTECTION TO TRAFFIC DURING NON-WORKING HOURS. MAINTAIN TRAFFIC FLOW AS REQUIRED BYPERMITTING AGENCY. PROVIDE SIGNS AND BARRICADES TO WARN PEDESTRIANS, MOTORCYCLESAND BICYCLES.INSTALL WARNING BARRICADES AT LEAST EVERY 50 FEET ALONG THE TRENCH ROUTE FROM THE TIMETHE TRENCH IS OPENED UNTIL THE TRENCHING IS COMPLETE.5.EXISTING SYSTEMSMAINTAIN EXISTING ELECTRICAL SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE, TESTED, ANDREADY FOR SERVICE. DISABLE EXISTING SYSTEM ONLY TO MAKE CUTOVERS AND CONNECTIONS ASDIRECTED BY PUGET SOUND ENERGY'S REPRESENTATIVE.PROVIDE TEMPORARY WIRING AND CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICEDURING CONSTRUCTION; IF A SCHEDULED OUTAGE IS NOT POSSIBLE. WHEN WORK MUST BEPERFORMED ON ENERGIZED EQUIPMENT OR CIRCUITS, USE QUALIFIED PERSONNEL FOR SUCHOPERATIONS.EARTHWORKSEE PUGET SOUND ENERGY SPM 6800.40501.BACK HOE, HAND DUG EXCAVATIONSPAVED SURFACES:CUT THE EDGES OF THE TRENCH PRIOR TO DIGGING. USE THE NARROWEST BUCKET PRACTICAL ORPLOW OFF THE EDGE OF PAVED SURFACE FAR ENOUGH TO MINIMIZE ASPHALT DISTURBANCE. REPAIRANY BLOW OUT AREAS (WHERE EDGE HAS BEEN BROKEN) BY SAWING. THE DEPTH OF THE TRENCHSHALL BE ENOUGH TO ALLOW 36" OF COVER . BACKFILL MATERIAL SHALL BE CONTROLLED DENSITYFILL (CDF) COVER OR SELECT FILL (5/8" MINUS) TO MEET PERMIT REQUIREMENTS.UNPAVED SURFACES:CONDUIT/CABLE TRENCHES ARE TO BE EXCAVATED JUST OFF THE EXISTING ROAD EDGE OR IN THESHOULDER OF THE ROAD BEHIND THE EXISTING DITCH LINE. CONTRACTOR SHALL USE A BACK HOEWITH THE NARROWEST WIDTH BUCKET PRACTICAL OR PLOW. TRENCH SHALL BE DEEP ENOUGH TOALLOW A MINIMUM OF 36" OF COVER OVER THE TOP MOST CABLE. ALL DITCH CROSSINGS SHALL HAVEA MINIMUM OF 36" COVER FROM THE LOWEST POINT WITHIN THE EXISTING DITCH LINE.CULVERTS; WHEN INSTALLING FACILITIES UNDER A CULVERT, EXCAVATION MUST BE FILLED WITHPACKED CRUSH ROCK. IF ANY CULVERT IS DAMAGED IT WILL BE REPAIRED OR REPLACED INACCORDANCE WITH PERMITTING AGENCY AND CONTRACTORS RESPONSIBILITY.SPOILS SHALL BE REMOVED QUICKLY TO MINIMIZE BLOCKING OF TRAFFIC. ALL SPOILS AND WASTESBECOME THE PROPERTY OF THE CONTRACTOR IMMEDIATELY UPON REMOVAL. REMOVE SPOILS ANDWASTES PROMPTLY TO AN APPROVED DISPOSAL SITE. REMOVE SPOILS CONTAINING ASPHALT ORCONCRETE TO A DISPOSAL SITE SPECIFICALLY APPROVED FOR SUCH MATERIALS. PROVIDE PUGETSOUND ENERGY WITH A DISPOSAL RECEIPT FOR ALL SPOILS.2.BACKFILLUNPAVED ROAD SURFACESBACKFILL FOR UNPAVED ROAD CROSSINGS SHALL CONSIST OF 1-1/2" TO 2-1/2" MATERIAL COMPACTEDTO 95% DENSITY. BACKFILL FOR UNPAVED ROAD SECTIONS SHALL CONSIST OF NATIVE MATERIALCOMPACTED TO 95% DENSITY.AT THE END OF EACH WORKDAY, BACKFILL OR PLATE ALL TRENCH, REMOVE ALL SPOILS AND CLEANROADWAY SURFACE OF LARGE HAZARDOUS DEBRIS.3.SURFACE RESTORATIONUNPAVED SURFACESRESTORE GROUND SURFACE TO ORIGINAL CONTOUR. RESTORE TO ORIGINAL CONDITION OR BETTER.4.LANDSCAPINGARRANGE AND PERFORM WORK TO MINIMIZE IMPACT TO EXISTING LANDSCAPING. RESTORELANDSCAPING THAT HAS BEEN DISTURBED DURING THE COURSE OF WORK, INCLUDING SEEDING OFBANKS AND FILLS. VAULTS SET IN BANK AREAS MAY REQUIRE RE-SLOPING THE SURROUNDING LANDTO AVOID SLOUGHING. LEAVE AREA IN ITS ORIGINAL STATE OR BETTER AT THE END OFCONSTRUCTION. HAND DIG IF REQUIRED TO PREVENT DAMAGE TO TREE ROOTS.ELECTRICAL1.CONDUITCONDUIT FOR INSTALLATION IN UNPAVED AREAS SHALL BE 2", 3", 4", OR 6" PVC DB120 OR 2", 3", 4", OR6" DB120 FOR DIRECT BURIAL. MAINTAIN 36" MINIMUM COVER ABOVE TOP CONDUIT AT ALL TIMES ORAS REQUIRED BY THE PERMITTING AGENCY.WHERE CONDUIT IS ROUTED FROM ROAD EDGE TO VAULT LOCATION, MAINTAIN 36" MINIMUM COVERABOVE TOP CONDUIT AT ALL TIMES OR AS REQUIRED BY THE PERMITTING AGENCY. BENDS SHALL BEMADE WITH AS LONG A RADIUS AS POSSIBLE (48" MINIMUM). AVOID MAKING SHARP BENDS OR KINKSIN CONDUIT DURING INSTALLATION. OBTAIN EXACT LOCATION OF CONDUIT ENTRANCE INTO VAULTFROM PUGET SOUND ENERGY BEFORE PENETRATING VAULT. PENETRATE THE VAULT USINGEXISTING KNOCKOUT OR USE CORE DRILLED HOLES. STUB THE 4" OR 6" PVC 2"-3" INTO VAULTINTERIOR AND GROUT BETWEEN THE CONDUIT AND VAULT WALL. LEAVE A 10' MINIMUM OF EXTRAPULL ROPE IN EACH END OF INSTALLED CONDUIT WHERE 4" OR 6" PVC IS INSTALLED AND CAPCONDUIT TO PREVENT THE ENTRY OF DIRT AND MOISTURE.ARRANGE WORK SO CONDUIT PLAYS DIRECTLY OFF REEL INTO TRENCH. PLACE THE CONDUIT IN THETRENCH AS STRAIGHT AS POSSIBLE. AVOID VERTICAL AND HORIZONTAL "SNAKING" OF THE CONDUIT.MULTIPLE CONDUIT RUNS MAY BE STACKED VERTICALLY. WHERE CONDUIT MUST BE PULLEDTHROUGH A TRENCH TO ALLOW A CROSSING UNDER AN EXISTING UTILITY, CAP CONDUIT ENDBEFORE PULLING TO AVOID CONTAMINATION. IF A KINK OCCURS, CUT THE CONDUIT AHEAD OF KINKAND SPLICE TO NEW CONDUIT TO CONTINUE RUN.2.UNDERGROUND PRIMARY CABLEPRIMARY CABLE SHALL BE 1/O ALUM SOL JACKETED CABLE RATED FOR 15 KV SERVICE WITH APOLYETHYLENE JACKET. PRIMARY CABLE SHALL BE 61 STRAND 750 MCM ALUMINUM CONDUCTORRATED FOR 15 KV SERVICE WITH A COPPER TAPE NEUTRAL CONDUCTOR AND POLYETHYLENEJACKET. A 4/0 COPPER NEUTRAL SHALL BE RUN WITH EACH 3 PHASE CIRCUIT OF 750 MCM.INSTALL CABLE INTO EXISTING OR NEW CONDUIT SYSTEMS USING APPROVED INSTALLATIONEQUIPMENT. APPROVED EQUIPMENT INCLUDES EITHER CABLE PULLERS AND/OR CABLE PUSHERS.PULLING SOCKS SHALL BE NON-CONDUCTIVE OR SIMILAR MATERIAL. STEEL PULLING SOCKS AREPROHIBITED. BARE STEEL CABLE SHALL NOT BE USED TO PULL CABLE. CABLE PULLING EQUIPMENT(WINCHES, HOIST, DRIVEN REELS, ETC.) SHALL BE EQUIPPED WITH INSTRUMENTATION TOCONTINUALLY MONITOR AND RECORD PEAK TENSION ENCOUNTERED DURING A PULL. BEFOREINSTALLING CABLE, OBTAIN RATED PULLING TENSION FOR CABLE FROM PUGET SOUND ENERGY. DONOT EXCEED RATING AT ANY TIME DURING INSTALLATION. NOTIFY PUGET SOUND ENERGYIMMEDIATELY IF PULLING TENSION EQUALS OR EXCEEDS RATING (828/1657LBS FOR 1/0 OR 5000LBSFOR 750 .) DO NOT EXCEED MINIMUM BEND RADIUS OF CABLE OR IMPOSE KINKS OR SHARP BENDS ONCABLE DURING PULLING OPERATIONS. INSTALL CABLE DIRECTLY OFF REEL WITHOUT DRAGGING ITON THE GROUND. APPLY PUGET SOUND ENERGY APPROVED LUBRICANT TO CABLE CONTINUALLYDURING PULLING TO REDUCE PULLING TENSION AND TO PERMIT FUTURE REMOVAL.INSTALL ADEQUATE AMOUNTS OF 3/4 " PLYWOOD ON EXISTING SIDEWALK AREAS TO SUPPORTPULLING EQUIPMENT AND PREVENT UN-NECESSARY DAMAGE TO SIDEWALKS.TRAIN AND COIL CABLES IN VAULTS AS REQUIRED TO FORM A SMOOTH TRANSITION FROM CONDUIT TOTERMINATION. IF TERMINATIONS ARE TO BE PERFORMED BY OTHERS, COIL 15' OF CABLE IN VAULTAND CAP END.3.TERMINATIONS AND SPLICESINSTALL APPROVED TERMINATIONS ON CABLES IN ACCORDANCE WITH PUGET SOUND ENERGY SPM2247.5115- 5119. UNLESS OTHERWISE DIRECTED, APPROVED TERMINATIONS WILL BE LOAD BREAKELBOWS IN VAULTS AND COLD SHRINK PIN TERMINALS ON POLE RISERS PER PUGET SOUND ENERGYSPM 2247.9317.SPLICE CABLE WITH APPROVED SPLICE KITS IN VAULTS, HAND HOLES OR SIMILAR ENCLOSURES. DONOT SPLICE CABLES IN RUNS BETWEEN VAULTS. SEE PUGET SOUND ENERGY SPM 2233.2075-2076.4.CONCRETE VAULTSEXCAVATE, INSTALL BASE MATERIAL, AND COMPACT BASE MATERIAL IN ACCORDANCE WITH PUGETSOUND ENERGY SPM 6775.0040.INSTALL AND SEAL PRECAST SECTIONS IN ACCORDANCE WITH PUGET SOUND ENERGY SPM 6775.0040.USE PRECAST NECK AND SHAFT SECTIONS TO BRING MANHOLE ENTRANCE TO PROPER ELEVATION.INSTALL MANHOLES PLUMB. SET THE TOP OF EACH MANHOLE TO FINISHED ELEVATION OR NOHIGHER THAN 6" ABOVE EXISTING ROAD ELEVATION. INSTALL HILLHOLDERS AS REQUIRED ON SKETCHOR BY CONSTRUCTION NOTES.5.GROUNDINGINSTALL GROUND ROD PER PUGET SOUND ENERGY SPM 6275.6100 AT EACH VAULT IN WHICH PRIMARYCABLE IS TERMINATED. LOCATE ROD IN TRENCH EXCAVATION WHEREVER POSSIBLE TO OBTAINMAXIMUM DRIVEN DEPTH IN UNDISTURBED SOIL. CONNECT EACH GROUND INDIVIDUALLY TO GROUNDLOOP INSIDE VAULT WITH BARE NO. 2 COPPER JUMPER OR TO CONCENTRIC NEUTRAL AT EACHSPLICE VAULT LOCATION. MINIMUM GROUNDING REQUIREMENT IS 4 GROUNDS PER MILE.6.EXISTING UNDERGROUND PRIMARY CABLE (IF APPLICABLE)ABANDON EXISTING PRIMARY CABLE IN PLACE. CUT OFF OLD CABLE ENDS INSIDE VAULT FLUSH WITHWALL. BEFORE CUTTING, PIGTAIL CONCENTRIC NEUTRAL STRANDS AND CONNECT TO GROUND LOOPINSIDE VAULT. RETURN SCRAP CABLE AND EXISTING CABLE TAGS TO PUGET SOUND ENERGY.REMOVE OR FILL EXISTING VAULTS AS REQUIRED BY PERMITTING AGENCY.7.TRAFFIC CONTROLALL TRAFFIC CONTROL TO COMPLY WITH CURRENT SPECIFICATIONS IN M.U.T.C.D.GENERAL OVERHEAD NOTES:-POLES, CONDUCTORS, DEVICES TO BE INSTALLED PER PSE STANDARDS & SPECIFICATIONS.-POLES ARE TO BE INSTALLED OR RELOCATED AS STAKED.-ALL NEW POLES SET SHALL BE THE CLASS INDICATED ON THE SKETCH OR BETTER.-INSTALL GROUND PLATE ASSEMBLY ON ALL NEW POLES.-INSTALL GRID NUMBERS ON ALL NEW AND EXISTING POLES AS SHOWN ON SKETCH.-TREAT ALL FIELD-DRILLED POLES WITH COPPER NAPHTHENATE WOOD PRESERVATIVE.-CUSTOMER/DEVELOPER TO COORDINATE BETWEEN UTILITIES.NVicinity MapARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS.OVERHEAD CIRCUIT MAPSCALE: NONEJOBSITEYesYesYes"Flagging Required""Outages Required""Locates Required"EXISTING PROPERTY LINEEXISTING UG RISERNEW UG RISERSVC STUBJ-BOXNEW TRENCH LINEEXISTING 3Ø WIREEXISTING CENTER LINEEXISTING CONDUCTOR TO BE REMOVEDDISCONNECT - FUSEDEXISTING 1Ø WIREEXISTING RIGHT OF WAYEXISTING PULL VAULTEXISTING POLEDOWN GUYEXISTING SECONDARY SERVICE LINEDISCONNECT - UNFUSEDEXISTING STREETLIGHTNEW POLENEW PADMOUNT TRANSFORMEREXISTING PADMOUNT TRANSFORMERNEW TOTAL UNDERGROUND TRANSFORMEREXISTING TOTAL UNDERGROUND TRANSFORMERHANDHOLEPRIMARY METERING POINTPJELECTRIC SYMBOLS LEGENDUG Expense584043578594043578108109139DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV TROFIMENKO425-457-90012/5/18V TROFIMENKO425-457-90012/5/18KEANG LIM253-395-69162/5/18RW-CITY OF BELLEVUES 3rd St Bridge & I-405(UI1630)Renton, WAPI TEAM101108880AS NOTED1/6KINGCSPSKEPMSW17 T23 R05E2305E0672305E0882305E067GRA-16JOB SITE-ASEE PG 3 & 4 101108880DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV TROFIMENKO425-457-90012/5/18V TROFIMENKO425-457-90012/5/18KEANG LIM253-395-69162/5/18RW-CITY OF BELLEVUES 3rd St Bridge & I-405(UI1630)Renton, WAPI TEAM101108880AS NOTED2/7KINGCSPSKEPMSW17 T23 R05E2305E0672305E0882305E067GRA-16UNIVERSAL CIRCUIT MAPSCALE: NONEJOBSITE 54 9 0 54 9 0 10 8 CED A R A V E S MAIN AVE S317760166115317760166116SW01317762166125NEW 317787166118PV02EXISTIP02IP01U81188WA L L 0 3 . 5 0 L 10'X30'REQUIREDEASEMENT"7231501310""323""317""319"U2544WSD O T R O W RENTON ROW RENTON ROWPV01317699166115EXIST 101108880DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV TROFIMENKO425-457-90012/5/18V TROFIMENKO425-457-90012/5/18KEANG LIM253-395-69162/5/18RW-CITY OF BELLEVUES 3rd St Bridge & I-405(UI1630)Renton, WAPI TEAM101108880AS NOTED3/7KINGCSPSKEPMSW17 T23 R05E2305E0672305E0882305E067GRA-16JOB SITE-ASCALE: 1"=20'AMATCH LINE SEE PAGE 4AAAPPROX. 440'ACONSTRUCTION NOTES:AT IP01/IP02 EXPOSE AND INTERCEPT EXISTING 6" CONDUIT BETWEEN PV01 AND PV02 AND EXTEND 2-6" WEST TO SW01.AAVault & Equipment TableSiteGridNumberVault Size& CoverType & SizeEquipmentIn VaultPrimary BushingsTransformerID Numbers(Company ID)ASBUILT INFORMATIONForeman-CompleteLBDCSW0131776216612511'4"X5'10"X8'2" w/3' Sq St Plate Door androtated access holeMatid: 9996803PMH-11Padmount SwitchMat id: 78338009-INSTALL (9) TER750CPV01317699166115Existing5106 Pull Vault with (2)42" Ø handholes600A CableSplicesINSTALL (3) SPL750PV02317787166118Existing5106 Pull Vault with (2)42" Ø handholes600A CableSplicesINSTALL (3) SPL750CommunicationsExcavated Dirt PileFinal Grade24" Min6" Min Sand Cover Over Power Conduits12" MinSeparation36"MinCover48"MaxBackfill(No rocks over 6" diameter)NOTE: Install 12"shading if the backfillcontains rocksgreater than 10" dia.Separation12" MinGas3" Sand BeddingVEHICLEACCESSSIDE6"4"(Power, Gas, andCommunications)(When Present)1-6, 1-4" Power ConduitsTYPICAL TRENCH EXCAVATION DETAILSCALE: NONEPADMOUNTTOP VIEWSWITCH10' MIN4' MINNot to scale6775.0035.03PM SWITCH CLEAR WORKING SPACE AT SW01ACCESSDOORSACCESSDOORS24"MINACCESSDOORSACCESSDOORS24"MIN2"Excavation - 50-1/2 cubic yardsSIDE VIEW8'-6"Crushed6"RockTOP VIEW10'16'7'-6"8"6'-2"Cover3,930 lbs8,430 lbsTopSection11,600 lbsBase5'-10"11'-4"54" or 603' Sq DiamondPlate Door54"or60"5106 PMH SWITCH VAULT EXCAVATION DETAILSCALE: NONE MID # 7906902 OR 9996803 M P 3 . 5 5 MP 3 . 6 0 7 4 9 015 777 1817 CEDAR AVE S CEDAR AVE S MI L L A V E S S 3 R D S T CEDAR AVE SCEDAR AVE S MILL AVE S S. 6TH ST SW02317776166183EXISTU0146317777166183WA L L 0 3 . 5 6 L WALL 03.55LWS D O T R OW WSDOT ROWWSDOT ROW"1203"RENTON ROW JOB SITE-ASCALE: 1"=20'AMATCH LINE SEE PAGE 3A101108880DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV TROFIMENKO425-457-90012/5/18V TROFIMENKO425-457-90012/5/18KEANG LIM253-395-69162/5/18RW-CITY OF BELLEVUES 3rd St Bridge & I-405(UI1630)Renton, WAPI TEAM101108880AS NOTED4/7KINGCSPSKEPMSW17 T23 R05E2305E0672305E0882305E067GRA-16BRIDGE INSTALLATION NOTESCITY TO DESIGN BRIDGE AND INCORPORATE BRIDGE HANGERS THAT MEET PSE BRIDGESTANDARDS.FROM ABUTMENT TO ABUTMENT CITY TO INSTALL CONDUIT USING PSE SUPPLIED SCH80CONDUIT AND EXPANSION COUPLINGS (MID# 9998216).EXPANSION COUPLINGS (MID# 9998216) TO BE INSTALLED EVERY 100'.Vault & Equipment TableSiteGridNumberVault Size& CoverType & SizeEquipmentIn VaultPrimary BushingsTransformerID Numbers(Company ID)ASBUILT INFORMATIONForeman-CompleteLBDCSW02317776166183Existing5106 PadmountSwitch VaultPMH-11 PadmountSwitchInstall 3-TER750C MP 3 . 6 5 7 4 9 5 5495 354 9 5CEDAR RIVER TRAILS 3RD STBNSF RRS 3RD STS 4TH STSW03317796166220EXISTU2554317796166220X5003PV03317803166154EXIST100T-X7178X7177317820166169317804166152IP03IP04EXIST 4-6"WA L L 0 3 . 6 5 LWA L L 0 3 . 6 0 L WALL 03.63L WA L L 0 3 . 6 4 LWSDOT ROWWSDOT ROWWSDOT ROWWSDOT ROWWSDO T ROW I - 4 0 5 I - 4 0 5 RENTON ROWRENTON ROWJOB SITE-BSCALE: 1"=20'101108880DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV TROFIMENKO425-457-90012/5/18V TROFIMENKO425-457-90012/5/18KEANG LIM253-395-69162/5/18RW-CITY OF BELLEVUES 3rd St Bridge & I-405(UI1630)Renton, WAPI TEAM101108880AS NOTED5/7KINGCSPSKEPMSW17 T23 R05E2305E0672305E0882305E067GRA-16BRIDGE INSTALLATION NOTESCITY TO DESIGN BRIDGE AND INCORPORATE BRIDGE HANGERS THAT MEET PSE BRIDGESTANDARDS.FROM ABUTMENT TO ABUTMENT CITY TO INSTALL CONDUIT USING PSE SUPPLIED SCH80CONDUIT AND EXPANSION COUPLINGS (MID# 9998216).EXPANSION COUPLINGS (MID# 9998216) TO BE INSTALLED EVERY 100'.CONSTRUCTION NOTES:AT IP03 EXPOSE AND INTERCEPT EXISTING 4-6" CONDUITS AND EXTEND NORTHEAST TO IP04.AT IP04 EXPOSE AND INTERCEPT EXISTING 4-6" CONDUITS AND EXTEND SOUTHWEST TO IP03.Vault & Equipment TableSiteGridNumberVault Size& CoverType & SizeEquipmentIn VaultPrimary BushingsTransformerID Numbers(Company ID)ASBUILT INFORMATIONForeman-CompleteLBDCPV03317803166154Existing5106 Pull Vault600A CableSplices-Install (3) SPL750SW03317796166220Existing5106 Pull VaultPME-11 Switch3Install (3) ELB750 SSW02EXISTNEWEXIST 1-6"IP02SW01EXISTPV01MAIN AVE SSU81188IP01EXISTPV02I-405JU0146EXIST 1-6"NEW 2-6"/2-4"S 3RD STNEW 1-6"NEW 1-6"EXIST 1-6"CEDAR AVE SSSW02EXISTNEWEXIST 2-6"SW01EXISTPV01MAIN AVE SSU81188 EXISTPV02JU0146S 3RD ST ADE295-AADE296-BADE297-C51611-A51612-B51613-CABH351-AABH352-BABH353-CPV03EXISTEIC543-AEIC544-BEIC545-CEIC546-AEIC547-BEIC548-CABH341-AABH342-BABH343-CEIC543-AEIC544-BEIC545-C51617-A51618-B51619-CABH351-AABH352-BABH353-CN.O.I-405 CEDAR AVE S101108880DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV TROFIMENKO425-457-90012/5/18V TROFIMENKO425-457-90012/5/18KEANG LIM253-395-69162/5/18RW-CITY OF BELLEVUES 3rd St Bridge & I-405(UI1630)Renton, WAPI TEAM101108880AS NOTED6/7KINGCSPSKEPMSW17 T23 R05E2305E0672305E0882305E067GRA-16PRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITPRIMARY CABLEASBUILT INFORMATIONSIZEQtyLENGTHDesign(ft)BENDSPULLPULLCableLENGTHDesign(ft)Cable NumbersForeman Please RecordForeman - CompleteFROMTO(in)90°45°22°11°(lbs)Rev(lbs)SizeABCManufacturerCompoundYearActual Amount Installed (Conduit & Cable)SW01IP0161151SW01PV01750 KCMIL240ABH351ABH352ABH353SW01IP0261151SW01PV02750 KCMIL240EIC543EIC544EIC545SW01SW026211202210750 KCMIL630EIC546EIC547EIC548NORMAL OPEN AT SW02SW01SW024211202210CONDUIT DIAGRAM-CEDAR AVE SSCALE: NONECABLE ONE-LINE DIAGRAM-CEDAR AVE SSCALE: NONE AØ - ABH351 BØ - ABH352 CØ - ABH353317762-166125U81188PMH11FROM PV01TO SW02TO PV02PMH-11 SWITCH CONNECTION DIAGRAM AT SW01NOT TO SCALE&‘(,&%‘(,&$‘(,&&‘(,&%‘(,&$‘(,& AØ - 51611 BØ - 51612 CØ - 51613321321123321 CØ - ADE297 BØ - ADE296 AØ - ADE295 AØ - 51617 BØ - 51618 CØ - 51619317776-166183PMH-11 SWITCH CONNECTION DIAGRAM AT SW02NOT TO SCALEU0146PMH-11FROM SW01&‘(,&%‘(,&$‘(,& SSW03EXISTPV03EXISTEXIST 4-6"IP03U2554IP04EXIST 4-6"I-405ABANDON 4-6"NEW 4-6"S 3RD STSSW03EXISTU2554ABH342-AABH343-BABH344-CPV03EXIST51863-A51864-B51865-C51611-A51612-B51613-CABH351-AABH352-BABH353-CEIC543-AEIC544-BEIC545-CI-405S 3RD ST101108880DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPV TROFIMENKO425-457-90012/5/18V TROFIMENKO425-457-90012/5/18KEANG LIM253-395-69162/5/18RW-CITY OF BELLEVUES 3rd St Bridge & I-405(UI1630)Renton, WAPI TEAM101108880AS NOTED7/7KINGCSPSKEPMSW17 T23 R05E2305E0672305E0882305E067GRA-16CONDUIT DIAGRAM-S 3RD STSCALE: NONECABLE ONE-LINE DIAGRAM-S 3RD STSCALE: NONEPRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITPRIMARY CABLEASBUILT INFORMATIONSIZEQtyLENGTHDesign(ft)BENDSPULLPULLCableLENGTHDesign(ft)Cable NumbersForeman Please RecordForeman - CompleteFROMTO(in)90°45°22°11°(lbs)Rev(lbs)SizeABCManufacturerCompoundYearActual Amount Installed (Conduit & Cable)IP03IP046456016PV03SW03750 KCMIL560EIC543EIC544EIC545321321123321317796-166220PME-11 SWITCH CONNECTION DIAGRAM AT SW03NOT TO SCALE AØ - 51863 BØ - 51864 CØ - 51865 CØ - 51613 BØ - 51612 AØ - 51611U2554PME-11FROM PV03CØ - ABH353BØ - ABH352AØ - ABH351&‘(,&%‘(,&$‘(,& CABLE REMOVAL TABLECABLENO.LOCATIONSCABLE(LF) ESTCABLE TYPEYEAR INSTFROMTOABH351-52-53PV03SW03760750 KCMIL