HomeMy WebLinkAboutMFP19000312DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000312
IVR Number: 19000312
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :01/17/2019Application Date:7222000150Parcel Number:2206 TALBOT RD S
Permit Type:01/22/2019Issue Date:Franchise
Permit Work Class:01/22/2020Expiration Date:Minor Utility
Job Number:101116934Franchise Type:Electric
Description:At P02: PSE to install 3" secondary electric service riser and install 1 run of 4/0 UG TPX wire from P02 to M01.
Developer to open 4'X4' workpit at P02 next to property line and trench within private property to M01. Restoration per
City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
101116934
Anish Kumar
253-208-2183
anish.kumar@pse.com
2206 Talbot Rd S 98055 101116934
At P02: PSE to install 3" secondary electric service riser and install 1 run of 4/0 UG
TPX wire from P02 to M01. Developer to open 4'x4' workpit at P02 next to property line and trench within
private property to M01. No pavement cuts anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
1/09/2019
MFP19000312
Scott Warlick 1/17/2019
Holly Powers 1/22/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
101116934
PSE/Potelco Inc.
Michael Been 425-757-0550
6905 S 228th St, Kent, WA 98032
michael.been@pse.com
2206 Talbot Rd S
TBD
1/31/2019
Anish Kumar 1/09/2019
MFP19000312
9:00am - 2:30pm
Monday - Friday
Scott Warlick
1/17/2019
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
#2206
11
11
101018
11
11
1010
TALBOT RD SS 23RD ST TALBOT RD SS 21ST
S
T
P02
P01
M01
STOP
FLAGGER
STOP
FLAGGER
W20-7ARO
A
D
WO
R
K
AH
E
A
D
W20-1W20-4ONE
L
A
N
E
RO
A
D
AHE
A
D200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'ROADWORKAHEADW20-1100'SID
E
W
A
L
K
CL
O
S
E
D
R9-9SIDEWALKCLOSEDR9-9R9-11SIDEWALKCLOSEDAHEADR9-11SID
E
W
A
L
K
CL
O
S
E
D
AH
E
A
D
FLAGGERS WILL ASSIST
PEDESTRIAN AROUND WORK
ZONE.
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
PSE PUGET
SOUND
ENERGY
JOB#
safaa.neema@pse.com
(425) 398-6077
Sheet 1 of X
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425N
TRENCH
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP19000312
2206
ROWRO
W
ROWTALBOT RD SS 23RD ST
PARCEL #
7222000150
D/W
30'60'317064-165960
25 kVA 120/240V (C)317065-165931
SLAG7062
317074-165942
317084-165940 T1/10
37.5 kVA 120/240V (B)
317100-165952
317102-165948 T1/9
25 kVA 120/240V (A)
SLAG7086
317093-165940
317085-165943
317064-165945
SLAG7063
55'
VIC
16
#2 TPX
4' X 4' WORK PIT
CUSTOMER SUPPLIED
317085-165943
CUSTOMER SUPPLIED
3/4" CUBIC YARD SAND
4' X 4' WORK PIT
CUSTOMER SUPPLIED
1 CUBIC YARD 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
PSE INST. 1-RUN 4/0 UG TPX ± 90'
CUSTOMER SUPPLIED
1-3" DB120 DISCONTINUOUS PVC CONDUIT ± 60'
10'30'20'
45°
R=30"
45°
R=30"
SITE PLAN
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
JOB SITE
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
00 1"2"
00 50'100'
POWER GENERAL NOTES - RESIDENTIAL PROJECT
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P02
-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01
TRENCHING & CONDUIT.
-INSTALL ± 60' OF 1-3" DB120 GREY PVC CONDUIT FROM P02 TO M01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
SITE SPECIFIC NOTES
AT P01: 317084-165940
-EXISTING POLE & 37.5kVA XFMR TO REMAIN
AT P02: 317085-165943
-EXISTING POLE TO REMAIN
-INSTALL (1) 3" SEC RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS)
BBB
$&78$/
M01 AT "2206": NEW METER BASE
-INSTALL 200A METER
SPAN SPECIFIC NOTES
P02 TO M01:
,167$//5818*73;
BBB
$&78$/
___
___
METER DETAIL @ M01
SCALE: NONE
32"
Typical
24"
Min
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator
Gas Meter
Assembly
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
Vent
Utility
Provided
Seal
24"-36"
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
M. BEEN 253-395-6848 12/10/18
M. BEEN 253-395-6848 12/10/18
E. SCHOTT 714-893-2405 12/10/18
N/A RENTON
BEBAWI RESIDENCE
OH TO UG CONVERSION
2206 TALBOT RD S, RENTON, WA 98055
N/A N/A
N/A 101116934
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
SE 19-23N-05E N/A N/A
2305E076 2305E076 2305E076SE VIC-16
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:MICHAEL BEEN
253-395-6848
MICHAEL.BEEN@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#101116934SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2305E076
Owner / Developer Contact Info
officeATTN:
MOKHTAR BEBAWI
12725 SE 86TH PL
NEWCASTLE, WA 98055
MIKE ABRAHAM 206-427-5745
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
0'
2,285 SQ FT
200A
NATURAL GAS
8kW
50A
2.4%
1.9%
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
Phone & TV
Excavated Dirt Pile
Final Grade
24" Min
48"
Max
18"
Backfill for DB 120 Conduit
12" Min
Separation
6" or 12" of sand, 5/8" minus
3" of sand, 5/8" minus, or clean backfill bedding
JOINT TRENCH DETAIL
36"
Min
Cover
ROADSIDE
Typical To Excavated Dirt Pile
(No Rocks over 10" Diameter)
or clean backfill shading
DB120 Grade Conduit
DB 120 (NTS)
- A 6" layer of sand, 5/8" minus, or clean shading is allowed when excavated native material
contains rocks no larger than 8" in diameter.
Trench and backfill requirements for electric line extension trenches (No PSE gas)
- A 12" layer of sand, 5/8" minus, or clean shading is required when excavated native material
contains rocks up to 10" in diameter.
Field Face
Quadrant
Road Face
Quadrant
Climbing
Space
5" MinC
LDirection of Vehicular TrafficCL
TOP VIEW
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit
CONDUIT RISER PLACEMENT DETAIL (P02)
SCALE: NONE
4'x4' Work Pit
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
VIC-16
6/2018
265.00 192.00 218.00
0.00 1.17 0.00
265.00 193.17 218.00
506396089Superior 101116934
108110650Removal
MFP19000312