Loading...
HomeMy WebLinkAboutMFP19000317DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19000317 IVR Number: 19000317 Permit Informaon Permit Name:Verizon - MCI Address/Locaon :01/03/2019Application Date:3340403645Parcel Number:234 SW 16TH ST Permit Type:01/25/2019Issue Date:Franchise Permit Work Class:01/25/2020Expiration Date:Minor Utility Job Number:Cross bore @ Franchise Type:Telephone Description:Excavate and repair existing utilities. Restoration per City of Renton standards. PRE CONSTRUCTION MEETING REQUIRED APPROVED WITH SOMMENTS OR REDLINES CAMERA INSPECTION OF UTILITIES REQUIRED Contacts Name Address PhoneTypeBilling HOLLY NORTH MGC TECHNICAL CONSTULTING, INC 8521 154th Ave NE REDMOND, WA 98052 B: (206) 618-0651Applicant Matthew Sapp Verizon - MCI Contact Heather Binkly Dycom Industries dba North Sky 11770 Us Hwy 1, SUITE 101 Palm Beach Gardens, FL 33408 B: (360) 254-6920 O: (360) 450-3287 Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 Louise Popelka Verizon MCI Buisness - Billing 3245 158th Ave SE Bellevue, WA 98008 B: (425) 240-0238Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date VERIZON BUSINESS/MCI METRO SCOTT CHRISTENSON 425.636.6046 SCOTT.CHRISTENSON@VERIZON.COM 234 SW 16TH ST, RENTON, WA 98057 VERIZON - CROSS BORE AT SW 16TH ST EXCAVATE AND REPAIR EXISTING UTILITIES. North Sky Communications, LLC 601973572 BL.036846 1/3/19 RESTORATION PER CITY OF RENTON STANDARDS MFP19000317 Scott Warlick 1/17/2019 Justin Johnson 1-23-2019 applicant shall camera inspect the utilities after work is complete. Pre-construction meeting required CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: VERIZON - CROSS BORE AT SW 16TH ST North Sky Communications, LLC SCOTT CHRISTENSON 425-636-6046 11311 NE 120TH ST, KIRKLAND WA 98034 SCOTT.CHRISTENSON@VERIZON.COM 234 SW 16TH ST W OF MAPLE AVE SW Reset FormPrint Form CHRISTOPHER MARTINEZ MGC TECHNICAL CONSULTING 1/3/2019 MFP19000317 Justin Johnson 1-23-2019 8:00 am to 3:00 pm Monday through Friday SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). NO.123PROJECT NAME: CROSS BORE AT SW 16TH STCLIENT ENGINEER: SCOTT CHRISTENSONENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 234 SW 16TH ST RENTON, WA 98057DRAWING NAME: VERIZON - CROSS BORE AT SW 16TH ST - TCPs.dwgPERMIT NUMBER: CONFIDENTIAL/PROPRIETARYSHEET: OF 11Know what'sbelow.before you dig.CallRSHORT-TERM STATIONARY WORK ZONE - LANE CLOSURE (FOR BUSINESS DISTRICT ROADWAY)TRAFFIC CONTROL PLAN #1 - USE SET-UP WHERE APPLICABLE ALONG SW 16TH ST (WEST BOUND LANE)JURISDICTION TCP REQUIREMENTS1. SIGNS DEVICES AND SPACING SHALL CONFORM TO THE MUTCD.2. PRIORITY PASSAGE SHALL BE PROVIDED TO EMERGENCY VEHICLES.3. NOTIFY TRANSIT 5 DAYS IN ADVANCE OF CARPOOL SPACE / BUS ROUTE & STOPIMPACTS.4. MUTCD DEFINED PROTECTIVE VEHICLE TO BE PLACED IN AN EFFECTIVE LOCATION TOPROTECT WORKERS (RECOMMENDED).5. MAINTAIN 11' VEHICLE TRAVEL LANE WIDTH AT ALL TIMES.6. MAINTAIN 4' OF UNAFFECTED PEDESTRIAN TRAVEL LANE ON OPEN SIDEWALKS.7. MAINTAIN 6' LANDING BEHIND OPEN ADA RAMPS AT ALL TIMES WHEN WORKING INTHEIR VICINITY.8. FLAGGERS SHALL CONDUCT PEDESTRIAN TRAFFIC CONTROL AND ARE TO MAINTAINOPEN SIDEWALKS AND ADA RAMPS.9. IF OPEN SIDEWALKS AND ADA RAMPS CANNOT BE MAINTAINED, CONTRACTOR IS TOPROVIDE A PATH FOR PEDESTRIAN TRAVEL THROUGH / AROUND STAGING AREA ASDEFINED BY THE MUTCD.10. ALL ADVANCED WARNING SIGNS SHALL BE MINIMUM 48"X48" BLACK ON FLUORESCENTORANGE UNLESS SPECIFIED OTHERWISE.11. CHANNELIZATION DEVICES ARE TO CONFORM TO THE MUTCD (28" RETROREFLECTIVECONES ARE SUGGESTED).12. ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE AT GRADE INTERSECTIONS ANDDRIVEWAYS.13. STREET SHALL BE COMPLETELY CLEAR TO FULL WIDTH BETWEEN 3PM & 9AMWEEKDAYS, UNLESS EXTENDED HOURS ARE ALLOWED BY WRITTEN PERMISSIONFROM LOCAL DOT AND TC.14. LAW ENFORCEMENT OFFICERS ARE TO BE USED IN LIEU OF FLAGGERS TO CONTROLINTERSECTION TRAFFIC. MULTIPLE OFFICERS ARE TO BE USED FOR INTERSECTIONSON HIGH IMPACT STREETS.15. "NO PARKING" SIGNS TO BE PLACED ON CURB SPACE, INCLUDING PAID PARKING.16. CONTRACTOR IS TO COORDINATE / FACILITATE DRIVEWAY / LOADING ZONE ACCESS.17. PROTECTIVE VEHICLE SHALL MAINTAIN 500'-1000' OF SIGHT DISTANCE TOAPPROACHING TRAFFIC.18. CONTACT REGIONAL TRAFFIC OFFICE STAFF FOR ASSISTANCE WITH SPECIFIC IN LANEOPERATIONS SUCH AS STRIPING, FOG SEAL, ETC. THAT REQUIRE ADDITIONAL PLANSAND DETAILS.LEGEND SCOPE OF WORK:USE WORKZONE TO EXCAVATE AND REPAIREXISTING UTILITIES.STREET USE PERMIT #: TBD BY CITYHOURS: TBD BY CITYHIGH VISIBILITY WARNING BEACON(REQUIRED)SIGN LOCATION ANDIDENTIFICATION NUMBERW20-1ARROW BOARD - SEQUENTIALCHEVRON MODE (REQUIRED)CHANNELIZING DEVICES35 / 40 MPH25 / 30 MPH350' ±200' ±**ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.RURAL ROADS, URBAN ARTERIALSRESIDENTIAL & BUSINESS DISTRICTSRURAL ROADS & URBAN ARTERIALS45 / 55 MPH500' ±RURAL ROADS60 / 65 MPH800' ±RURAL HIGHWAYS55 / 70 MPHFREEWAYS & EXPRESSWAYS25 MPH or LESS 100' ±**URBAN STREETS1500' ±(OR PER THE MUTCD)* ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGERAMPS, AT-GRADE INTERSECTIONS, AND DRIVEWAYS.** ADVANCED WARNING SIGNS IF FEASIBLE.SIGN SPACING = X (FEET)*TEMPORARY TRAFFIC CONTROL ZONE ELEMENTS25 30 35 40 45 50 55 60 65 70MINIMUM LONGITUDINAL BUFFER SPACE = B (FEET)155 200 250 305 360 425 -MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED > 45 MPHPOSTED SPEED < 45 MPHL=W•S (W = LANE WIDTH & S = POSTED SPEED)L=(W•S²)/60 (W = LANE WIDTH & S = POSTED SPEED)POSTED SPEED (MPH)LENGTH (FEET)- - -ROLL-AHEAD DISTANCE = R (FEET)R = 30' MINIMUM - 100' MAXIMUMMAXIMUM CHANNELIZING DEVICE SPACING (FEET)50 / 7035 / 4525 / 30206080404030POSTED SPEED (MPH)TAPERTANGENTROADWORKAHEADSIGN LEGEND VERIZON CONTACT:SCOTT CHRISTENSON11311 NE 120TH STKIRKLAND, WA 98034C.425.636.6046SCOTT.CHRISTENSON@VERIZON.COMONLYRIGHT LANEMUSTTURN RIGHTRIGHTLANECLOSEDAHEADCENTERLANECLOSEDAHEADSIDEWALKCLOSEDSIDEWALK CLOSED AHEADCROSS HERESW 16TH STLWORKVEHICLEW20-1W20-5RW4-2RXXXR3-502R3-7RW20-1XXW20-5CR3-2XW20-1W20-1W20-12' MINR9-9R9-9W4-119LR9-11aMAPLE AVE SW LIND AVE SW 234 SW 16TH STPARCEL NO.3340403645 RENTONPARCEL NO. : 3340403890 1600 LIND AVE SWPARCEL NO. 3340403320 500 SW 16TH STPARCEL NO.3340404035 316 SW 16TH STPARCEL NO.3340403885R3-6ROKWORK AREA22'X10' NO.123PROJECT NAME: CROSS BORE AT SW 16TH ST VERIZON ENGINEER: SCOTT CHRISTENSONENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 234 SW 16TH ST RENTON, WA 98057DRAWING NAME: VERIZON - CROSS BORE AT SW 16TH ST - PLANS.dwgPERMIT NUMBER: © 2018 Microsoft Corporation © 2018 HERE SITE LOCATIONSHEET INDEX1. COVER SHEET / SITE LOCATION2. LEGEND3. GENERAL NOTES4. DESIGN VIEW A5. RESTORATION VIEW ASCOPE OF WORK:EXCAVATE AND REPAIR EXISTING UTILITIES.SHEET 4CONFIDENTIAL/PROPRIETARYSHEET: OF 15CONTACTSJAKE CARPENTERMGC TECHNICAL CONSULTING, INC.6244 185TH AVE NEREDMOND, WA 98052C.425.305.1785JAKE@MGCTECHNICAL.COMVERIZON CONTACT:SCOTT CHRISTENSON11311 NE 120TH STKIRKLAND, WA 98034C.425.636.6046SCOTT.CHRISTENSON@VERIZON.COMKnow what'sbelow.before you dig.CallRADDRESS: 234 SW 16TH ST, RENTON, WA 98057PROJECT NAME: VERIZON - CROSS BORE AT SW 16TH STSTARTMFP19000317 NO.123PROJECT NAME: CROSS BORE AT SW 16TH ST VERIZON ENGINEER: SCOTT CHRISTENSONENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 234 SW 16TH ST RENTON, WA 98057DRAWING NAME: VERIZON - CROSS BORE AT SW 16TH ST - PLANS.dwgPERMIT NUMBER: CONFIDENTIAL/PROPRIETARYSHEET: OF 25#F#F#F##LEGENDKnow what'sbelow.before you dig.CallRMFP19000317 NO.123PROJECT NAME: CROSS BORE AT SW 16TH ST VERIZON ENGINEER: SCOTT CHRISTENSONENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 234 SW 16TH ST RENTON, WA 98057DRAWING NAME: VERIZON - CROSS BORE AT SW 16TH ST - PLANS.dwgPERMIT NUMBER: GENERAL NOTESKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 35GENERAL NOTES:UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTINGAND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTINGTHE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THEDISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED.TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK ISFOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALLOTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THECONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.SPECIFICALLY STATED OTHERWISE.CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCHALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE CITY OF RENTON ENGINEERINGALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTHThe locations of utilities shown on these drawing are only approximate. MGC TECHNICAL CONSULTING, INC. hereby disclaims any responsibilityto third parties for the accuracy of this information. Persons working in the area covered by this drawing must contact the statewideCall-Before-You-Dig System to ascertain the location of underground utilities prior to performing any excavation.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORKSTANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE CITY OF RENTON REGULATIONS AND APPLICABLE STATEAND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLESTANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIREINSPECTED AND APPROVED BY THE CITY OF RENTON INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TOBE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ONTHESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THEFIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCALUTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTION POINTSUTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.CONTRACTOR SHALL NOTIFY THE CITY OF RENTON INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTHTHE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE CITY OF RENTON AND ALL UTILITY COMPANIES WITH REGARDACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLETHE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDSTIMES.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION,TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, ORALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESSFOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE CITY OF RENTON, THE CONTRACTOR SHALL SUBMIT ATRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIESWITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFICCONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BEHELD WITH CITY OF RENTON.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THEINTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVEDOR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALLCONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT ATTHE CONSTRUCTION SITE AND AVAILABLE TO THE CITY OF RENTON INSPECTOR AT ALL TIMES.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATIONALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TOTIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THETIME PERIOD APPROVED BY THE CITY OF RENTON.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.MFP19000317 NO.123PROJECT NAME: CROSS BORE AT SW 16TH ST VERIZON ENGINEER: SCOTT CHRISTENSONENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 234 SW 16TH ST RENTON, WA 98057DRAWING NAME: VERIZON - CROSS BORE AT SW 16TH ST - PLANS.dwgPERMIT NUMBER: CONFIDENTIAL/PROPRIETARYSHEET: OF 45Know what'sbelow.before you dig.CallRCONSTRUCTION NOTES1PROPOSED EXCAVATE AND REPAIR EXISTING UTILITIES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #7 FOR SITE PHOTOGRAPHS.DESIGN VIEW A 61'14'80' 12'35'32'36'11'12'12'12' 234 SW 16TH STPARCEL NO. : 3340403645SW 16TH ST RENTONPARCEL NO. : 3340403890MAPLE AVE SW 95'25'43'27'15'28'12'7'1CONTRACTOR NOTES1.ALL EXCAVATION WITHIN DRIP LINE OF TREE SHALL BECOMPLETED VIA VAC TRUCK. PROTECT ROOTS GREATER THAN2" WITH BURLAP. REMOVE BURLAP AFTER CONSTRUCTION.(WHEN WORKING WITHIN DRIP LINE OF TREES)2.LOCATE AND PROTECT ALL GASFACILITIES. MAINTAIN 1’ VERTICAL AND 3’ HORIZONTALCLEARANCE WHEN WORKING NEAR EXISTING GAS FACILITIES.3.LOCATE AND PROTECT ALL STREET LIGHT INFRASTRUCTUREPRIOR TO CONSTRUCTION.MFP19000317 NO.123PROJECT NAME: CROSS BORE AT SW 16TH ST VERIZON ENGINEER: SCOTT CHRISTENSONENGINEERING FIRM: MGC TECHNICAL CONSULTING INC.LOCATION: 234 SW 16TH ST RENTON, WA 98057DRAWING NAME: VERIZON - CROSS BORE AT SW 16TH ST - PLANS.dwgPERMIT NUMBER: CONFIDENTIAL/PROPRIETARYSHEET: OF 55Know what'sbelow.before you dig.CallRRESTORATION VIEW A RESTORATION NOTES80' 12'35'32' 12'12'12' 234 SW 16TH STPARCEL NO. 3340403645SW 16TH ST RENTONPARCEL NO. 3340403890MAPLE AVE SW 61'14'36'11'95'25'43'27'15'28'GRESTORE SIDEWALK PANEL PER CITY OFRENTON STANDARDS.12'7'GMFP19000317