Loading...
HomeMy WebLinkAboutPN_Seattle City Light 1812641 Shoreline Exemption_v1700 5th Ave., Suite 3200 | P.O. Box 34023 | Seattle WA 98124-4023 TEL (206) 684-3000 TTY/TDD (206) 684-3225 FAX (206) 625-3709 seattle.gov/light twitter.com/SEACityLight facebook.com/SeattleCityLight An equal employment opportunity, affirmative action employer. Accommodations for people with disabilities provided upon request. January 11, 2019 CITY OF RENTON DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT 1055 S. GRADY WAY RENTON, WA 98057 Dear Sir/Madam: I am pleased to submit this letter to request a shoreline exemption for a utility pole replacement project in the right-of-way that crosses the Black River/Springbrook Creek in between Lind Ave SW and Oakesdale Ave SW in Renton, WA. The required permit information appears below. Applicant/Contact: Maura Patterson, Seattle City Light, Environmental Management & Compliance 700 5th Avenue, Suite 3316 Seattle, WA 98104 (206) 684-8461, maura.patterson@seattle.gov Exemption Type: RMC 4-9-190 C.3 Project Location: In the right-of-way in between Lind Ave SW and Oaksdale Ave SW north of SW 27th St (see attached site location map and photo) Property owners: The electric utility assets belong to Seattle City Light. The pole replacement utility project entails work within the street right-of-way. Project Description: Nine (9) Seattle City Light transmission poles within the jurisdiction of Renton need to be replaced. Eight (8) fall within a City of Renton critical area (critical area exemption requested under separate letter). One (1) of the poles falls within the Black River/Springbrook Creek shoreline and will be replaced west of the existing location (approximately 15-25 feet west) away from the shoreline with a fiberglass/composite material poles. Work will include pole replacement and above-ground line work. Crews will follow all best management practices (BMPs) for soil and erosion control and working near sensitive water bodies to prevent deleterious material from entering the nearby Springbrook Creek, as outlined in an internal environmental review given to the project engineer and crews by Seattle City Light Environmental Management and Compliance. The crews will adhere to any requirements as outlined in the ECA exemption administered by the City of Renton. PAGE 2 OF 2 This replacement project falls under RMC 4-9-190 C.3, which exempts activities relevant to the normal maintenance and repair of existing structure and development within shorelines and their buffers provided an application for a no-fee exemption certificate is prescribed from the Planning Division (RMC 4-9-190 D.1). The project includes normal maintenance/repair of existing infrastructure and will be completed in-kind. The wood-treated transmission poles will be replaced with fiberglass/composite poles. Work will not further encroach outside of the existing right-of-way, nor will it alter the existing areas. Enclosed with this letter are project maps and photos as a component of the application. Please feel free to call or email me if you need clarification on any aspect of the project, as we are trying to complete this work as soon as possible. I would also be pleased to provide any additional material that you might require. Please invoice me at the address listed above. Thank you very much for your assistance. Sincerely, Maura Patterson Sr. Environmental Analyst /Enclosures (map, photo) Maura Patterson