Loading...
HomeMy WebLinkAboutP_Traffic Control Plan (TCP)_101103099 Renton_AA _V2_170605RRRR12 12 12 12ONE WAY10 ONE WAY 11 11 11 11ONE W A Y BRON S O N W A Y N MAIN AVE S1515 1212151 0 1 0 1 0 2 0 12 S 2ND ST (SR 900) ONE WAY ONE W A Y 1212S 3RD ST S 3RD S T ONE W A YONE WAYDETOURM4-9bDETOURM4-9bARRW-BRDW4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1W20-7ASTOP FLAGGER RIGHT LANECLOSEDAHEADW20-5R350'350'ROADWORKAHEADW20-1R9-9SIDEWALK CLOSEDR9-9SIDEWALKCLOSEDJob#101103099 207 Main Ave S, Renton, WA June 1, 2017 Sheet 1 of 2 gregory.harwood@pse.com (425) 424-6425 N PSE PUGET SOUND ENERGY CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH = L (feet) LANE WIDTHS POSTED SPEED LIMITS 20 25 30 35 40 45 10 11 12 55 + 60/65 45/55 35/40 30 25 SIGN SPACING "X" 800 500' 350' 200' 100' 28" TRAFFIC CONE LEGEND RESTORATION TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP ARROW BOARD RESTORATION TRAFFIC PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. 8. Restoration sidewalk work will be centered in the west side sidewalk at approx. 225' NCL of S 2nd St. APPROVED 06/22/2017 MFP16006818 RRRR12 12 12 12ONE WAYONE WAY 11 11 11 11ONE W A Y BRON S O N W A Y N MAIN AVE S1515 1212151 0 1 0 1 0 2 0 12 S 2ND ST (SR 900) ONE WAY ONE W A Y ONE W A Y 11 1011101212S 3RD ST S 3RD S T MAIN AVE SHOUS E R W A Y S ONE W A YONE WAYONE WAY 1212ONE WAY1313ONE WAY1313 WELLS AVE SWELLS AVE SWELLS AVE SR9-11SIDEWALKCLOSEDAHEADR9-9SIDEWALKCLOSEDR9-9SIDEWALK CLOSEDW4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1ARRW-BRD ROAD WORK AHEAD W20-1100'POLICE UPO STOP FLAGGER R9-3CROSSWALKCLOSEDDETO U R M4-9bW20-7AW4-2LRIGHT LANECLOSEDAHEADW20-5R 100'100'100'ROADWORKAHEADW20-1 W20-7A RIGHT LANE CLOSED AHEAD W20-5RROAD WORK AHEAD W20-175'75'ROADWORKAHEADW20-1100' Job#101103099 207 Main Ave S, Renton, WA June 1, 2017 Sheet 2 of 2 gregory.harwood@pse.com (425) 424-6425 N PSE PUGET SOUND ENERGY CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MINIMUM TAPER LENGTH = L (feet) LANE WIDTHS POSTED SPEED LIMITS 20 25 30 35 40 45 10 11 12 55 + 60/65 45/55 35/40 30 25 SIGN SPACING "X" 800 500' 350' 200' 100' 28" TRAFFIC CONE LEGEND RESTORATION TRAFFIC FLOW WORK VEHICLE SIGN LOCATION WARNING FLAG FLAGGER UNIFORMED POLICE OFFICERPOLICE STOP ARROW BOARD RESTORATION TRAFFIC PLAN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. 4. Sign size can be a minimum of 48" x 48" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m. 8. Restoration sidewalk and street panel work will be in the SW quadrant of Main Ave S & S 2nd St. APPROVED 06/22/2017 MFP16006818