HomeMy WebLinkAboutP_Traffic Control Plan (TCP)_101103099 Renton_AA _V2_170605RRRR12 12 12
12ONE WAY10
ONE WAY
11 11 11 11ONE
W
A
Y
BRON
S
O
N
W
A
Y
N
MAIN AVE S1515
1212151
0
1
0
1
0
2
0
12
S 2ND ST (SR 900)
ONE WAY
ONE
W
A
Y
1212S 3RD ST
S 3RD
S
T
ONE
W
A
YONE WAYDETOURM4-9bDETOURM4-9bARRW-BRDW4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1W20-7ASTOP
FLAGGER RIGHT LANECLOSEDAHEADW20-5R350'350'ROADWORKAHEADW20-1R9-9SIDEWALK
CLOSEDR9-9SIDEWALKCLOSEDJob#101103099
207 Main Ave S, Renton, WA
June 1, 2017
Sheet 1 of 2 gregory.harwood@pse.com
(425) 424-6425
N
PSE PUGET
SOUND
ENERGY
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MINIMUM TAPER LENGTH = L (feet)
LANE
WIDTHS
POSTED SPEED LIMITS
20 25 30 35 40 45
10
11
12
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
28" TRAFFIC CONE
LEGEND
RESTORATION
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
ARROW BOARD
RESTORATION TRAFFIC PLAN
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
8. Restoration sidewalk work will be centered in the
west side sidewalk at approx. 225' NCL of S 2nd St.
APPROVED
06/22/2017
MFP16006818
RRRR12 12 12
12ONE WAYONE WAY
11 11 11 11ONE
W
A
Y
BRON
S
O
N
W
A
Y
N
MAIN AVE S1515
1212151
0
1
0
1
0
2
0
12
S 2ND ST (SR 900)
ONE WAY
ONE
W
A
Y
ONE
W
A
Y
11 1011101212S 3RD ST
S 3RD
S
T
MAIN AVE SHOUS
E
R
W
A
Y
S
ONE
W
A
YONE WAYONE WAY
1212ONE WAY1313ONE WAY1313
WELLS AVE SWELLS AVE SWELLS AVE SR9-11SIDEWALKCLOSEDAHEADR9-9SIDEWALKCLOSEDR9-9SIDEWALK
CLOSEDW4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1ARRW-BRD
ROAD
WORK
AHEAD W20-1100'POLICE
UPO
STOP
FLAGGER R9-3CROSSWALKCLOSEDDETO
U
R
M4-9bW20-7AW4-2LRIGHT LANECLOSEDAHEADW20-5R
100'100'100'ROADWORKAHEADW20-1 W20-7A
RIGHT LANE
CLOSED
AHEAD W20-5RROAD
WORK
AHEAD W20-175'75'ROADWORKAHEADW20-1100'
Job#101103099
207 Main Ave S, Renton, WA
June 1, 2017
Sheet 2 of 2 gregory.harwood@pse.com
(425) 424-6425
N
PSE PUGET
SOUND
ENERGY
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
MINIMUM TAPER LENGTH = L (feet)
LANE
WIDTHS
POSTED SPEED LIMITS
20 25 30 35 40 45
10
11
12
55 +
60/65
45/55
35/40
30
25
SIGN SPACING
"X"
800
500'
350'
200'
100'
28" TRAFFIC CONE
LEGEND
RESTORATION
TRAFFIC FLOW
WORK VEHICLE
SIGN LOCATION
WARNING FLAG
FLAGGER
UNIFORMED
POLICE OFFICERPOLICE
STOP
ARROW BOARD
RESTORATION TRAFFIC PLAN
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
4. Sign size can be a minimum of 48" x 48" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m.
8. Restoration sidewalk and street panel work will
be in the SW quadrant of Main Ave S & S 2nd St.
APPROVED
06/22/2017
MFP16006818