Loading...
HomeMy WebLinkAboutMFP16006422DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP16006422 IVR Number: 16006422 Permit Informa!on Permit Name:PSE - Gas Address/Loca!on:12/02/2016Applica!on Date:0088000280Parcel Number:16204 114TH AVE SE Permit Type :12/02/2016Issue Date:Franchise Permit Work Class:12/31/2018Expira!on Date :Minor Ulity Est. Comple!on:12/31/2016Job Number:107051075Franchise Type :Natural Gas Descrip!on:Tie into existing gas main and extend new main. Hart surface cuts anticipated. NOTE: On site pre con required. Please call 72 hours prior to schedule. PROJECT NAME: Limelite Short Plat Contacts Name Address PhoneTypeBilling Aurelie Johannson PSE/Infrasource - Billing 1660 Park Ln Burlington, WA 98233 B: (425) 466-4771ContactX INFRASL871C2 / BL.033545 INFRASOURCE SVCS B: (206) 949-5846Contractor Construc!on Contractor : INFRASL871C2 Kari Roller City of Renton 1055 S Grady Way Renton, WA 98057-3232 B: (425) 430-6851 C: (425) 430-6931 Owner General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES