HomeMy WebLinkAboutP_Traffic_Control_Plan_N.236745_170605_v1ROADWORKAHEADW20-1ROADWORKAHEADW20-1Project # N.237645 C.02
Designed for CenturyLink by
Sharon Martos
Traffic Control Supervisor
TCS # 007602
Approved 04/20/2017
Phone 253-737-5198
sharon.martos@gmail.com
Sharon Martos
Comments:
SIGN SPACING
MPH "X"
45+ 500'
35 350'
30 200'
25 100'
150' Seattle
200' Sea Tac
Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'
SHIFTING 20 70 75 80
TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'
25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' max
TRAFFIC CONTROL PLAN
JOB # N.237645 C.02
PERMIT #
Date:04/20/2017 Author:Sharon Martos, Traffic Control Supervisor Project:N.237645 C.02
CERT:TCS # 007602 Designed for CenturyLink:By Sharon Martos
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
SW 7TH ST @ LIND AVE SW
MH 113
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 007602 sharon.martos@gmail.com
N
DETOURM4-9bRIGHT LANECLOSEDAHEADW20-5W4-2ROAD
WORK
AHEAD
W20-1
MH 113
WORK AREA
10 X 120 DETOURM4-9bACCESS RDSW 7TH ST
LIND AVE SWComments:
ACCESS MH 113 LOCATED IN SIDEWALK ON THE SOUTH
SIDE OF SW 7TH ST, EAST OF LIND AVE SW.
THIS IS A RIGHT LANE CLOSURE.
SIDEWALK CLOSED IN WORK AREA.
PEDESTRIANS ROUTED AROUND WORK AREA.
CURB TO BE RAMPED AND NON-SKID STEEL
PLATES PLACES ON GRASS TO MEET ADA REQUIREMENTS,
SPOTTER WILL ASSIST PEDESTRIANS.
Legend
Work Area
Cone
Spotter
Arrowboard (Chevron)
truck
www.invarion.com