Loading...
HomeMy WebLinkAboutP_Traffic_Control_Plan_N.236745_170605_v1ROADWORKAHEADW20-1ROADWORKAHEADW20-1Project # N.237645 C.02 Designed for CenturyLink by Sharon Martos Traffic Control Supervisor TCS # 007602 Approved 04/20/2017 Phone 253-737-5198 sharon.martos@gmail.com Sharon Martos Comments: SIGN SPACING MPH "X" 45+ 500' 35 350' 30 200' 25 100' 150' Seattle 200' Sea Tac Comments: MERGING TAPER LENGTH TAPER ("L") LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80 TAPER 25 105 115 165 1/2 L 30 150 165 180 35 205 225 245 SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L Comments: CHANNELIZATION SPACING MPH TAPER TANGENT 35 / 45 30' 60' 25 / 30 20' 40' ONE LANE TWO WAY TAPER 50' TO 100' max TRAFFIC CONTROL PLAN JOB # N.237645 C.02 PERMIT # Date:04/20/2017 Author:Sharon Martos, Traffic Control Supervisor Project:N.237645 C.02 CERT:TCS # 007602 Designed for CenturyLink:By Sharon Martos Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements. 2. Channelizing devices are 28" traffic cones with retroreflective material. 3. All signs are 48" x 48" B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum of 11' for lane width. 6. Work hours will be ____am to ____pm. SW 7TH ST @ LIND AVE SW MH 113 UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: SHARON MARTOS, TCS# 007602 sharon.martos@gmail.com N DETOURM4-9bRIGHT LANECLOSEDAHEADW20-5W4-2ROAD WORK AHEAD W20-1 MH 113 WORK AREA 10 X 120 DETOURM4-9bACCESS RDSW 7TH ST LIND AVE SWComments: ACCESS MH 113 LOCATED IN SIDEWALK ON THE SOUTH SIDE OF SW 7TH ST, EAST OF LIND AVE SW. THIS IS A RIGHT LANE CLOSURE. SIDEWALK CLOSED IN WORK AREA. PEDESTRIANS ROUTED AROUND WORK AREA. CURB TO BE RAMPED AND NON-SKID STEEL PLATES PLACES ON GRASS TO MEET ADA REQUIREMENTS, SPOTTER WILL ASSIST PEDESTRIANS. Legend Work Area Cone Spotter Arrowboard (Chevron) truck www.invarion.com