HomeMy WebLinkAboutMFP17002954DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17002954
IVR Number: 17002954
Permit Informa!on
Permit Name:Century Link Permits
Address/Loca!on:06/22/2017Applica!on Date:1323049055Parcel Number:160 OAKESDALE AVE SW
Permit Type :07/21/2017Issue Date:Franchise
Permit Work Class:07/21/2018Expira!on Date :Minor U)lity
Job Number:N.252173Franchise Type :Telephone
Descrip!on:Transfer Facili)es and remove 2 Poles, P13401 & P13431. Restora)on per City of Renton Standards
Contacts
Name Address PhoneTypeBilling
QWest/Century Link - Billing 23315 66th Ave S
Kent, WA 98032
Applicant
Kim Parker
QWest Corpora)on
931 14th St, SUITE 1000A
Denver, CO 80202
B: (303) 992-0752Contact
QWest/Century Link - Billing 23315 66th Ave S
Kent, WA 98032
ContactX
Heather Binkly
Dycom Industries dba North Sky Communica)ons LLC
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: BL.036846Electrical Contractor : NORTHSC958NE
Construc!on Contractor : NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for
ANY work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
160 Oakesdale Ave SW
MFP17002954
Holly Powers
Justin Johnson 7-21-2017
7/21/2017
MFP17002954
Justin Johnson
7-21-2017
8:00 am to 3:00 pm
Monday through Friday
S 134TH ST
S 134TH ST
OAKESDALE AVE SWPOWELL AVE SWSW
L
A
N
G
S
T
O
N
R
D
TRAFFIC CONTROL PLAN
JOB # N.252173.C.12
PERMIT #
Designed for: CENTURYLINK
Project # N,252173.C.12
Darlene Durr
Traffic Control Supervisor
TCS # 008900
Approved 05/22/17
Phone 253-737-5198
darlene.durr@hotmail.com
_______________________
Date:05/22/17 Author:Darlene Durr, Traffic Control Supervisor Project:N.252173.C.12
CERT:TCS # 008900 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)LOC:5357
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'
-----------------------------------
SHIFTING 20 70 75 80
TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #008900, darlene.durr@hotmail.com
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'
25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' MAX
Comments:
SIGN SPACING
MPH "X"
45+ 500'
35 350'
30 200'
25 100'
150' Seattle
200' Sea Tac
X
RO
A
D
W
O
R
K
AH
E
A
D
W2
0
-
1 ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1 BE PREPAREDTO STOPW20-7bBE PREPAREDTO STOPW20-7bBE
PREPARED
TO STOP
W20-7b
W20-7aW20-7aW20-7a100'100'
100'
100'100'100'
100'
100'
100'
100'
P.13401
WORK AREA
8' X 100'
Comments:
THIS IS TO TRANSFER FACILITIES, REMOVE P.13401 LOCATED IN THE WEST SIDE
OF OAKESDALE AVE SW SOUTH OF S 134TH ST AND RESTORE AS REQUIRED.
THIS IS A ONE LANE TWO WAY WITH FLAGGERS.
FLAGGERS WILL ASSIST DRIVEWAYS AND PEDESTRIANS AT WORK AREA.
SPEED
LIMIT25
N
OAKESDALE AVE SW @ S 134TH ST
TRANSFER FACILITIES / P.13401 REMOVAL / RESTORE
Legend
WORK TRUCK
WORK AREA
CONES
FLAGGER
www.invarion.com
S 134TH ST
S 134TH ST
OAKESDALE AVE SWPOWELL AVE SWSW
L
A
N
G
S
T
O
N
R
D
TRAFFIC CONTROL PLAN
JOB # N.252173.C.12
PERMIT #
Designed for: CENTURYLINK
Project # N,252173.C.12
Darlene Durr
Traffic Control Supervisor
TCS # 008900
Approved 05/22/17
Phone 253-737-5198
darlene.durr@hotmail.com
_______________________
Date:05/22/17 Author:Darlene Durr, Traffic Control Supervisor Project:N.252173.C.12
CERT:TCS # 008900 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)LOC:5357
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.
3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ("L") LANE WIDTH
L MPH 10' 11' 12'
-----------------------------------
SHIFTING 20 70 75 80
TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #008900, darlene.durr@hotmail.com
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'
25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' MAX
Comments:
SIGN SPACING
MPH "X"
45+ 500'
35 350'
30 200'
25 100'
150' Seattle
200' Sea Tac
XROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROAD
WORK
AHEA
D
W20-1 BE PREPAREDTO STOPW20-7bBE PREPAREDTO STOPW20-7bBE PREPA
R
E
D
TO ST
O
P
W20-7
b
W20-7
aW20-7a100'
100'
100'100'
100'
100'
100'
100'
P.13431
WORK AREA
8' X 100'
Comments:
THIS IS TO TRANSFER FACILITIES, REMOVE P.13431 LOCATED IN THE WEST SIDE
OF OAKESDALE AVE SW SOUTH OF S 134TH ST AND RESTORE AS REQUIRED.
THIS IS A ONE LANE TWO WAY WITH FLAGGERS.
FLAGGERS WILL ASSIST DRIVEWAYS AND PEDESTRIANS AT WORK AREA.
SPEED
LIMIT25
N
OAKESDALE AVE SW @ S 134TH ST
TRANSFER FACILITIES / P.13431 REMOVAL / RESTORE
100'
Legend
WORK TRUCK
WORK AREA
CONES
FLAGGER
www.invarion.com