Loading...
HomeMy WebLinkAboutMFP17003286DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17003286 IVR Number: 17003286 Permit Informa!on Permit Name:Century Link Permits Address/Loca!on:07/12/2017Applica!on Date:7223000010Parcel Number:540 GARDEN AVE N Permit Type :07/26/2017Issue Date:Franchise Permit Work Class:07/26/2018Expira!on Date :Minor U’lity Job Number:N.259330Franchise Type :Telephone Inspector:Todd Freih 206-999-1832 Descrip!on:Revision: Trench from MH 18 to bore pit ACCESS MH523, MH19, MH18, & MH553. PLACE 4 BORE PITS AND BORE FROM NE CORNER OF PARK AVE N & N 6TH ST TO BIG SHOT PED, AND OVERSET UP1248 WITH BIG SHOT PED. PLACE NEW UP1248. TRENCH 10' FROM MH533 TO BORE PIT. REMOVE/REPLACE SIDEWALK RAMP & 5'X4' SIDEWALK PANEL. DISTURBANCE OF HARD SURFACE. Required to pot hole and locate exis’ng u’lity depths prior to boring . Restora’on per City of Renton Standards . Contacts Name Address PhoneTypeBilling AAn : Dana Smith QWest /Century Link - Billing 5018 85th Ave E, Bldg F9 Puyallup, WA 98371 ApplicantX Kim Parker QWest Corpora’on 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Heather Binkly Dycom Industries dba North Sky Communica’ons LLC 11770 Us Hwy 1, SUITE 101 Palm Beach Gardens, FL 33408 B: (360) 254-6920 O: (360) 450-3287 Contractor Business License Number: BL.036846Construc!on Contractor : NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner AAn : Dana Smith QWest /Century Link - Billing 5018 85th Ave E, Bldg F9 Puyallup, WA 98371 Specialized Billing General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES