Loading...
HomeMy WebLinkAboutpermitDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17004429 IVR Number: 17004429 Permit Informa!on Permit Name:Century Link Permits Address/Loca!on:09/11/2017Applica!on Date:3340403320Parcel Number:1600 LIND AVE SW Permit Type :09/20/2017Issue Date:Franchise Permit Work Class:09/20/2018Expira!on Date :Minor U(lity Job Number:N.257439Franchise Type :Telephone Descrip!on:Century Link to access MH T129, UKN HH & HH1054 to splice and place new fiber. Pre Construc(on mee(ng required Contacts Name Address PhoneTypeBilling C/O QWEST CORP 1801 CALIFORNIA ST #4600 Denver, CO 80202 Applicant Kim Parker QWest Corpora(on 931 14th St, SUITE 1000A Denver, CO 80202 B: (303) 992-0752ContractorX Business License Number: BL.000953Construc!on Contractor : QWESTC*000QG CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 23315 66th Ave S Kent, WA 98032 Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES