3450400330
VASHON AVE NENE 10TH PL ANACORTES CT NEPRE
14
4232
DWY
37.5kVA 120/240v
25kVA 120/240v60'60'60'49'
62'
CUSTOMER SUPPLIED
4' X 4' WORK PIT
CUSTOMER SUPPLIED
1 CUBIC YARD 5/8" CRUSHED ROCK
CUSTOMER SUPPLIED
4' X 4' WORK PIT
3/4" CUBIC YARD SAND
CUSTOMER SUPPLIED
PSE PROVIDED
RED POLY PIPE ± 60'90°
1-3" SCHED'L 80 PVC CONDUIT ± 47'
INST. 1-RUN 350 UG TPX W/ 4/0 WHIP± 182'
CUSTOMER SUPPLIED
SITE PLAN
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
COSMIN SUCIU RESIDENCE
4225 NE 10TH PL
RENTON, WA 98059
SORINA SUCIU 425.802.1790
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
STANDARD EASEMENT PROVISION
An easement is hereby reserved for and conveyed to Puget Sound Energy,
Inc., Telephone Co., Television Cable Co., and their respective successors
and assigns under and upon the private street(s), if any, and the exterior
ten (10) feet of all lots, tracts and spaces with in the plat lying parallel with
and adjoining all street(s) in which to construct, operate, maintain, repair,
replace and enlarge underground or ground-mounted appurtenances
thereto for the purpose of serving this subdivision and other property with
electric, gas, telephone and other utility service, together with the right to
enter upon the streets, lots, tracts and spaces at all times for the purposes
herein stated.101107903FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RUSSELL PAGE
(253) 234-6444
RUSSELL.PAGE@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. PAGE (253) 234-6444 09/18/17
R. PAGE (253) 234-6444 09/18/17
T. MYER (714) 893-2405 09/18/17
N/A RENTON
COSMIN SUCIU RESIDENCE
DEMO REBUILD
4232 NE 10TH PL, RENTON WA 98059
N/A N/A
N/A 101107903
AS NOTED 1 OF 1
KING N/A N/A CSPSKEIN
NW 10-23N-05E N/A N/A
2305E038 2305E040 2305E038 PRE-14
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
101107903504888832
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
08.18.17
368.00 411.00 404.00
0.00 0.00 1.75
368.00 411.00 405.75
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
CIRCUIT FEET ADDED: 0'
SQ. FOOTAGE: 5600 SQ FT
PANEL SIZE: 200A
HEAT TYPE: GAS
EST. DEMAND: 12KW
LRC: 140A
% V. DROP: 2.0%
% FLICKER: 3.6%
NEW CABLE & CONDUIT DIAGRAM
NOT TO SCALE
JOB SITE
JOB SITE
ASPLUNDH CONSTRUCTION CORP.
SITE SPECIFIC NOTES
P01: 318529-167199
-EXISTING POLE TO REMAIN
-REMOVE EX. 25kVA XFMR
-INSTALL 37.5kVA 120/240v (FUSE @ 15T) (TRFPXF) PER STD 6025.1000
-INSTALL 3" SEC RISER (RIS3CSS) PER STD 6042.1000
M01: NEW METER BASE
-INSTALL 200A METER
CUSTOMER & DEVELOPER NOTES
THE CUSTOMER IS RESPONSIBLE TO PROVIDE ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
5(48,5('723529,'( ,167$//´',6&217,182866&+('8/(39&&21'8,7)520P01-M01 +/-132'
5(48,5('723529,'( ,167$//´12132/<38//523(,1$//&21'8,76
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD 5/8" CRUSHED ROCK AT P01
5(48,5('723529,'(¶;¶:25.3,7 &8%,&<$5'2)6$1'$7M01
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-REQUIRED TO EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-RENTON INSPECTION & APPROVAL IS REQUIRED 5 BUSINESS DAYS PRIOR TO CONNECTION
-CUSTOMER TO CONTACT CUSTOMER CARE SERVICE (1-888-321-7779) WHEN READY FOR PERMANENT SERVICESPAN SPECIFIC NOTES
M01 TO X01:
&86720(572,167$//',6&217,18286*5(<6&+
/&21'8,7
X01:
36(726833/<5('32/<3,3()25%25(
X01 TO P01:
&86720(57275(1&+
,162)76+28/'(5
&86720(572,167$//6&+&21'8,7
P01 TO M01:
,167$//5810&08*73;::+,3¶
PLACE PEA GRAVEL
BAGS (MID 9995892)
FOR SEDIMENT TRAP
PLACE STRAW MULCH ON
DISTURBED AREA
AUGERED HOLE
POLE
TYPICAL AUGERED WORK SITE - 0150.3200
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
DITCH OR SENSITIVE AREA
TOP VIEW
ConduitField Face
QuadrantClimbing
Space
Road Face
Quadrant
Climbing
Space
5" Min
CL
LCDirection of Vehicular Traffic
Standoff Bracket
15" Min Length
Conduit Clamp
UNDERGROUND
CABLE CONDUITS
TO THIS QUADRANT
CUSTOMER-CONDUIT & RISER LOC. DETAIL
SCALE: NONE
TV & TEL Electric Service Cable in Conduit
3" Schedule 40 Grey PVC
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Backfill for Conduit
Free of rocks
larger than 8"
in diameter
Separation
6" Min
in Conduit
Schedule 40 White PVC
Gas Service Line
32" Typical
(Power, Gas,
Phone & Cable)
Separation
4" Min
12" Min
Separation
36" MINIMUM COVER
IN RIGHT OF WAY
JOINT TRENCH DETAIL
Joint Service Line in Conduit (NTS)
To Excavated Dirt Pile
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
32"
Typical
24"
Min
24"-36"
24"-36"
4'Top View
Electric & Joint Utility
Work Pit Dimensions
36"
Min
Drainage Pipe
12" Minimum Clearance
from Gas Service Lines
Conduit Depth
24" to 36" Max
Regulator Vent
Gas Meter Assembly
Utility Provided
48"
4'8"
Service (Permanent Detail:)
Not to Scale
Seal
Conduit
Ends
Closed
4'8"
24" Min
36" Typical
3'
To Trench
Property Line
Conduit Stakes
Customer Provided
3" Schedule 40 Grey PVC
Power Cable Conduit
Customer Provided
Gas Service Line Conduit
Sch 40 White PVC
Customer Provided
3" Conduit Service Riser
Customer Provided
Elec. Mtr Base
Elec Mtr
utility provided
Gas Meter
Relief Vent
Building Wall
Elec. Mtr
SCALE: NONE
METER DETAIL @ M01
OUTAGE LIST
-4233 NE 10TH PL, RENTON WA 98059 - BUI HIEP QUY
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P01
318529-167199
37.5kVA
6211300
108102878
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
318529-167199
25kVA
583....
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch
must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working
days in advance.
3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the
underground facilities located.
4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch
and details for locations. Equipment locations must be approved by the Project Manager.
5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which
would restrict construction and/or equipment access, before work can begin.
6.Roads shall be paved or have a compacted , crushed rock base in place.
7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls,
overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE
standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in
the right of way, and at least 1 foot when crossing them.
8.All work is to be done in accordance with local municipal and county permit requirements as applicable.
9.Inclement weather conditions may cause delays in construction times and dates.
10.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this
sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and
24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope
the trench to 1:1.
POWER GENERAL NOTES - RESIDENTIAL PROJECT
1-3" SCHED'L 80 PVC CONDUIT ± 25'
CUSTOMER SUPPLIED