Loading...
HomeMy WebLinkAboutP_Design_107053965_V1_1710051 2 3 121314 TRACT D TRACT A 4 5 6 7 8910 TRACT CTRACT B11 FLOW2" STW IP 18'W67E082812 60'53'53'60' Owner / Developer Contact Info officeATTN: HARBOUR HOMES, LLC 400 N. 34TH ST., STE. 300 SEATTLE, WA 98103 JAMLE WALLIER 206.315.8130 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105084548107053965Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-7. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr B.HARMON 425.495.5528 4.14.17 E. ORTIZ .9.7.17 E. ORTIZ .9.7.17 REDT # ( RW-100305 )RENTON THE PINES AT HIGHLANDS 2" MPE-7 GAS MAIN EXTENSION - 14 S/F LOTS 850 MONROE AVE NE, RENTON, WA 98056 PUGET SOUND ENERGY 107053965 105084548 1" = 50'1 OF 1 KING 30 CIKNC 09SE-T23-R05E 206.085 204.080 CABLE CBL TBD CBL TEL TBD TELEPHONE COMM TBD COMM TEL TBD RIGHT OF WAY ROW TBD ROW TEL TBD . . . B. JOHNSON 206.571.8519 . 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: Potelco Inc Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 504451462 107053965 N/A 106322711 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / INSTALL 2"MPE-7 264 FT JOINT 2"MPE-7 452 FT .... .... .... .... Contractor: CONSTRUCTION COST CODES: Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:BRIAN HARMON 425.495.5528 brian.harmon@pse.com 60 IP 088-60 B. JOHNSON 206.571.8519 SITE PLAN xx ... ... ... JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 overlapping existing coating 3". Tape wrap weld joint Wrapped Steel Gas MainSteelPEPE Main Transition Fitting Test Lead Wires Tracer Wire CP Test Box TYPICAL TEST LEAD CONNECTION FOR PE MAIN NOT TO SCALE CONNECTED TO WRAPPED STEEL MAIN CP NOTES: INSTALL PER PSE STANDARDS (4510.1020 - FIG. 4) IF LOW PSP READ. INSTALL 9LB ANODE AND BRING WIRE UP IN BOX WITH TEST LEAD OFF MAIN. NOTIFY CORROSION TECH. @ 206.571.8519 B. JOHNSON CBURRUS@HARBOURHOMES.COM N Vicinity Map 47.4972, -122.1746 SITE GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS SS SINGLE 2" MAIN 1 1 1/8 MPE-7 10 ( ')ECL 2600 SS SINGLE 2" MAIN 2 1 1/8 MPE-7 10 ( ')ECL 2600 SS SINGLE 2" MAIN 3 1 1/8 MPE-7 10 ( ')ECL 2600 SS SINGLE 2" MAIN 4 1 1/8 MPE-7 10 ( ')ECL 2600 SS SINGLE 2" MAIN 5 1 1/8 MPE-7 10 ( ')ECL 2600 SS SINGLE 2" MAIN 6 1 1/8 MPE-7 10 ( ')ECL 2600 SS SINGLE 2" MAIN 7 1 1/8 MPE-7 10 ( ')ECL 2600 LS TWIN 2" MAIN 8 & 9 1 1/8 MPE-7 65 ( ')ECL 2600 LS SINGLE 2" MAIN 10 1 1/8 MPE-7 65 ( ')ECL 2600 LS TWIN 2" MAIN 11 & 12 1 1/8 MPE-7 65 ( ')ECL 2600 LS TWIN 2" MAIN 13 & 14 1 1/8 MPE-7 65 ( ')ECL 2600 SS SINGLES =7 330 FT 1 1/8" PE PIPE LS SINGLES =1 LS TWIN =3 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 LOT 2 LOT 14 2 40 1 W 3 SCH 80 2 65 GAS SVC, SECONDARY X02 LOT 4 LOT 11 2 40 1 E 3 SCH 80 2 65 GAS SVC, SECONDARY X03 LOT 5 LOT 10 2 40 1 W 3 SCH 80 1 65 GAS SVC, SECONDARY X04 LOT 5 LOT 6 4 40 1 S 3 SCH 80 1 30 GAS MAIN, SECONDARY X05 LOT 6 LOT 9 2 40 1 E 3 SCH 80 2 65 GAS SVC, SECONDARY 2" PVC PLUG /CAPS = 8 2" YELLOW SCH 40 PVC = 260 FT 2" SCH 80 GREY PVC = 0 FT 2" PVC PLUG /CAPS = 0 4" PVC PLUG /CAPS = 2 4" YELLOW SCH 40 PVC = 30 FT 3" SCH 80 GREY PVC = 485 FT 3" PVC PLUG /CAPS = 16 2" B.O. TIE-IN 233'NCL, 18'WCL ( )'NCL, ( )'WCL INSTALL 2" MPE-7 1' @ 18'WCL ( )' @ ( )'WCL 2" T.L. & T.F. 167'SCL, 18'WCL ( )'SCL, ( )'WCL INSTALL 2" MPE-7 195' @ 18'WCL ( )' @ ( )'WCL 2" INLINE TEE 28'NCL, 18'WCL ( )'NCL, ( )'WCL INSTALL 2" MPE-7 13' @ 18'WCL ( )' @ ( )'WCL 2" POLYVALVE/OPEN 41'NCL, 18'WCL ( )'NCL, ( )'WCL INSTALL 2" MPE-7 7' @ 18'WCL ( )' @ ( )'WCL INSTALL 2" = 264 FT JOINT 2" = 452 FT 2" CAP EOM/WIREBOX 48'NCL, 18'WCL ( )'NCL, ( )'WCL INSTALL 2" MPE-7 48' @ 28'NCL ( )' @ ( )'NCL BEGIN JOINT MAIN 28'NCL, 30'ECL ( )'NCL, ( )'ECL JOINT 2" MPE-7 26' @ 28'NCL ( )' @ ( )'NCL 2" POLYVALVE/OPEN 28'NCL, 56'ECL ( )'NCL, ( )'ECL JOINT 2" MPE-7 426' @ 28'NCL ( )' @ ( )'NCL 2" CAP EOM/WIREBOX 28'NCL, 482'ECL ( )'NCL, ( )'ECL NOT TO SCALE CROSS SECTION - MONROE AVE NE LOOKING NORTH E 60' ROW W PROP. 2" MPE IP - 18'WCL G G EX 2" STW IP - 18'WCL 67E082 NOT TO SCALE CROSS SECTION - ROAD A LOOKING EAST S 53' ROW N PROP. 2" MPE IP - 28'NCL G